Launch Date
Completion Date
Configurations
Sizes
Project Size
Total Floors
RERA ID
28.467302
77.510531
As per the sanction layout plan.
As per the layout sanction plan.
Internal roads designed of different ROW as per requirement.
As per the sanction layout plan.
Municipal water supply is used for drinking purpose.
Sewerage system is used with STP as per the designed calculation.
Separate drainage line is used as per the design requirement.
Landscape area is provided as per local building byelaws.
Number of trees as per the approved drawings and requirements.
Electrical supply including street lighting is provided as per the layout plan.
As per the approved sanction drawings.
Disposal system of sewage and sullage water is being used through STP which is used for Landscape and flushing purpose.
All the solid waste managed as per the biodegradable waste converted in compost ad non biodegradable delivered to registered recyclable agencies.
Low flow water fixtures being used for water conservation and STP water is used for landscape and flushing purpose.
Specific U-Value glass is used for energy management and roof insulation. Light colour tiles is used, and for renewable energy solor photovoltic is used for common areas.
Fire system and fire safety system will be installed in building as per the NBC norms.
N/A
As per environment management plan and disaster management plan. All provisions are made including fire assembly point.
Other miscellaneous work is provided as per the layout plan.
Showing 9 blocks with 365 units
Total Carpet Area
112330.00 m²
1209108.89 ft²
Total Units
549
3 different types
Blocks & Floors
9
38 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
18036.00 m²
194137.70 ft²