NEWActive

THE DAHLIAS

GURUGRAM, WAZIRABAD ST
09-08-2024
Launch Date
NEW
Type
2031-12-31
Completion Date

Overview

Launch Date

09-08-2024

Completion Date

2031-12-31

Configurations

5 BHK, 4 BHK, Penthouse Duplex

Sizes

9700 - 15000 sq.ft.

Project Size

9 Buildings - 420 units

Total Floors

29

Launch Price

60000 /sq.ft

Current Price

90000 /sq.ft

RERA ID

RERA-GRG-1690-2024

Basic Details

Project NameTHE DAHLIAS
Project IDRERA-GRG-1690-2024
Project TypeNEW
Applicant TypeCompany
Submission Date09-08-2024 02:15:20 PM
Builder NameDLF LIMITED
CINL70101HR1963PLC2484
PANXXXX494N
Emailharyanarera@dlf.in
Websitehttps://www.dlf.in/homes/superluxury/LUX5
Phone (Mobile)9711080232
Phone (Landline)0124769000
Registered Address3RD FLOOR, SHOPPING MALL, ARJUN MARG, DLF CITY, PHASE I GURUGRAM 12202
Project AddressR16, DLF 5, SECTOR 54 GURUGRAM
DistrictGURUGRAM
TehsilWAZIRABAD ST

Location

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
7513 sq.ft
Built Up Area
N/A
Carpet Efficiency
60%
Built Up Efficiency
N/A
Parkings
3

Bank Details

Bank NameICICI BANK LTD.,QUTUB PLAZA, DLF PHASE-1, GURGAON-122002
Account Number017705014812
IFSC CodeICIC000017
MICR Code110229030
Branch Code00177

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Pankaj Kumar, Puneet Rukheja, Ashok Nanda, Sandhy Singla, Gaurav Aroa, Amit Bansal, Pankaj Jain
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached

Development Details

Land Area16.489 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land16.489 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3.23
CONSTRUCTION OF ROADS10.07
PAVEMENTS0
PARKS AND PLAYGROUNDS2.47
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0.43
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.28
Total16.48

Cost Details

Land Cost5309.16 Lakhs
Other Cost62155.91 Lakhs
Estimated Project Cost618651.83 Lakhs
Estimated Infrastructure Cost37579.8 Lakhs
Estimated Apartment Construction Cost513606.96 Lakhs

Documents

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 08-08-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 08-08-2024

DEMARCATION PLAN

Uploaded on: 08-08-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 08-08-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 08-08-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 08-08-2024

BS-04 FLOOR PLAN-BASEMENT 4_4_11ZON

Uploaded on: 01-10-2024

EL-17_3_11ZON

Uploaded on: 01-10-2024

SC-04_12_11ZON

Uploaded on: 01-10-2024

EL-03_3_11ZON

Uploaded on: 01-10-2024

EL-08_1_11ZON

Uploaded on: 01-10-2024

T2-01_16_11ZON

Uploaded on: 01-10-2024

T9-01_1_11ZON

Uploaded on: 01-10-2024

EL-18_4_11ZON

Uploaded on: 01-10-2024

ZONING PLAN

Uploaded on: 01-10-2024

T2-04_19_11ZON

Uploaded on: 01-10-2024

T3-04_23_11ZON

Uploaded on: 01-10-2024

SPE

Uploaded on: 01-10-2024

BS-05 AREA DIAGRAM BASEMENT -1_5_11ZON

Uploaded on: 01-10-2024

T9-01B_3_11ZON

Uploaded on: 01-10-2024

EL-15_1_11ZON

Uploaded on: 01-10-2024

T1-01_11_11ZON

Uploaded on: 01-10-2024

T9-01C_4_11ZON

Uploaded on: 01-10-2024

T9-05_1_11ZON

Uploaded on: 01-10-2024

EL-10_3_11ZON

Uploaded on: 01-10-2024

T3-01_20_11ZON

Uploaded on: 01-10-2024

T4-03_26_11ZON

Uploaded on: 01-10-2024

SC-10_11_11ZON

Uploaded on: 01-10-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 01-10-2024

SC-06_14_11ZON

Uploaded on: 01-10-2024

T8-03_41_11ZON

Uploaded on: 01-10-2024

SC-07_8_11ZON

Uploaded on: 01-10-2024

BS-01 FLOOR PLAN-BASEMENT 1_1_11ZON

Uploaded on: 01-10-2024

BS-03 FLOOR PLAN-BASEMENT 3_3_11ZON

Uploaded on: 01-10-2024

T2-02_17_11ZON

Uploaded on: 01-10-2024

T1-04_14_11ZON

Uploaded on: 01-10-2024

DR-902

Uploaded on: 01-10-2024

SC-12_13_11ZON

Uploaded on: 01-10-2024

TT-01

Uploaded on: 01-10-2024

T1-03_13_11ZON

Uploaded on: 01-10-2024

RENEWAL OF LICENCE 110-133 OF 1995 DT. 11.03.20

Uploaded on: 01-10-2024

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 01-10-2024

T9-01D_5_11ZON

Uploaded on: 01-10-2024

T9-06_2_11ZON

Uploaded on: 01-10-2024

FF-900

Uploaded on: 01-10-2024

ST-01 KHASRA MARKED SITE PLAN_5_11ZON

Uploaded on: 01-10-2024

SC-14_15_11ZON

Uploaded on: 01-10-2024

EL-16_2_11ZON

Uploaded on: 01-10-2024

T9-01A_2_11ZON

Uploaded on: 01-10-2024

EL-05_5_11ZON

Uploaded on: 01-10-2024

SD-03

Uploaded on: 01-10-2024

T7-04_38_11ZON

Uploaded on: 01-10-2024

RENEWAL DLF5 LICENSES DT 01082024

Uploaded on: 01-10-2024

T2-03_18_11ZON

Uploaded on: 01-10-2024

T9-03_3_11ZON

Uploaded on: 01-10-2024

BS-02 FLOOR PLAN-BASEMENT 2_2_11ZON

Uploaded on: 01-10-2024

SD-03_10_11ZON

Uploaded on: 01-10-2024

ST-02 SITE PLAN GREEN ARERA_7_11ZON

Uploaded on: 01-10-2024

T1-02_12_11ZON

Uploaded on: 01-10-2024

T8-04_42_11ZON

Uploaded on: 01-10-2024

BS-07 AREA DIAGRAM BASEMENT -3_7_11ZON

Uploaded on: 01-10-2024

BS-08 AREA DIAGRAM BASEMENT- 4_11ZON

Uploaded on: 01-10-2024

T9-07_3_11ZON

Uploaded on: 01-10-2024

SC-01 SECTION A-A (TOWER-1_9_11ZON

Uploaded on: 01-10-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 01-10-2024

T9-02_2_11ZON

Uploaded on: 01-10-2024

T7-03_37_11ZON

Uploaded on: 01-10-2024

T9-04_4_11ZON

Uploaded on: 01-10-2024

SD-01

Uploaded on: 01-10-2024

T4-02_25_11ZON

Uploaded on: 01-10-2024

T9-02(1)_1_11ZON

Uploaded on: 01-10-2024

EL-02 ELEVATION WEST (TOWE_2_11ZON

Uploaded on: 01-10-2024

BS-06 AREA DIAGRAM BASEMENT -2_6_11ZON

Uploaded on: 01-10-2024

T9-04A_5_11ZON

Uploaded on: 01-10-2024

EL-09_2_11ZON

Uploaded on: 01-10-2024

EL-11_4_11ZON

Uploaded on: 01-10-2024

EL-13_6_11ZON

Uploaded on: 01-10-2024

PHASING PLAN

Uploaded on: 01-10-2024

DR-900

Uploaded on: 01-10-2024

SC-02_10_11ZON

Uploaded on: 01-10-2024

SC-11_12_11ZON

Uploaded on: 01-10-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 01-10-2024

TD-02_4_11ZON

Uploaded on: 01-10-2024

FF-900_9_11ZON

Uploaded on: 01-10-2024

T3-02_21_11ZON

Uploaded on: 01-10-2024

T4-06_29_11ZON

Uploaded on: 01-10-2024

T8-02_40_11ZON

Uploaded on: 01-10-2024

SUPER IMPOSED KHASRA PLAN

Uploaded on: 01-10-2024

EL-14_7_11ZON

Uploaded on: 01-10-2024

SD-02

Uploaded on: 01-10-2024

T3-03_22_11ZON

Uploaded on: 01-10-2024

SC-05_13_11ZON

Uploaded on: 01-10-2024

T4-04_27_11ZON

Uploaded on: 01-10-2024

CA ESTIMATED

Uploaded on: 01-10-2024

EL-07_7_11ZON

Uploaded on: 01-10-2024

TD-01_3_11ZON

Uploaded on: 01-10-2024

T8-01_39_11ZON

Uploaded on: 01-10-2024

EL-01 ELEVATION NORTH (TOW_1_11ZON

Uploaded on: 01-10-2024

EL-04_4_11ZON

Uploaded on: 01-10-2024

EL-06_6_11ZON

Uploaded on: 01-10-2024

EL-12_5_11ZON

Uploaded on: 01-10-2024

PL-900_8_11ZON

Uploaded on: 01-10-2024

SC-03_11_11ZON

Uploaded on: 01-10-2024

SC-08_9_11ZON

Uploaded on: 01-10-2024

SC-09_10_11ZON

Uploaded on: 01-10-2024

SC-13_14_11ZON

Uploaded on: 01-10-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 01-10-2024

T4-01_24_11ZON

Uploaded on: 01-10-2024

DR-901_8_11ZON

Uploaded on: 01-10-2024

T4-05_28_11ZON

Uploaded on: 01-10-2024

T4-07_30_11ZON

Uploaded on: 01-10-2024

Statutory Approvals

LICENSEDate: 01-08-2024Status: ALREADY BEEN OBTAINED
AIRPORT AUTHORITYDate: 26-12-2023Status: ALREADY BEEN OBTAINED
ARAVALI NOCDate: 15-04-2024Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 18-03-2024Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO TOWN & COUNTRY PLANNING
WATER SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
STORM WATER DRAINAGESUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO TOWN & COUNTRY PLANNING
STREET LIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSSUBMITTED TO TOWN & COUNTRY PLANNING
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERSUBMITTED TO TOWN & COUNTRY PLANNING

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHVBNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

MR KK SHEERA
Name
MR KK SHEERA
PAN
XXXX780B
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
Flat No. 403 Abhinav Apartment Near Community Centre Sector 9 Gurugram Haryana 122001

Managing Director/CEO

MR ASHOK KUMAR TYAGI
Name
MR ASHOK KUMAR TYAGI
PAN
XXXX141P
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
MG-511B The Magnolias DLF Golf Links DLF5 Gurugram 122009 Haryana

Directors

MR DEVINDER SINGH
Name
MR DEVINDER SINGH
PAN
XXXX227N
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
1220 The Magnolias DLF Golf Links DLF5 Gurugram 122009 Haryana
MS PIA SINGH
Name
MS PIA SINGH
PAN
XXXX436J
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
16A Aurangzeb Road New Delhi 110011
MS SAVITRI DEVI SINGH
Name
MS SAVITRI DEVI SINGH
PAN
XXXX332B
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
16 Aurangzeb Road NDMC New Delhi 110011
MS ANUSHKA SINGH
Name
MS ANUSHKA SINGH
PAN
XXXX050K
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
16 Aurangzeb Road NDMC New Delhi 110011
LT GEN ADITYA SINGH RETD
Name
LT GEN ADITYA SINGH RETD
PAN
XXXX785F
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
T-118 DLF Phase 3 Gurugram-122002
MR AS MINOCHA
Name
MR AS MINOCHA
PAN
XXXX751M
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
623-B Magnolias DLF Golf Links Near DLF Golf Club DLF City Phase-5 Gurugram 122009
MR VIVEK MEHRA
Name
MR VIVEK MEHRA
PAN
XXXX597Q
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
B-314 New Friends Colony New Delhi-110025
MS PRIYA PAUL
Name
MS PRIYA PAUL
PAN
XXXX797C
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
2 Aurangzeb Lane New Delhi 110011
DR UMESH KUMAR CHAUDHARY
Name
DR UMESH KUMAR CHAUDHARY
PAN
XXXX903E
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
E-2 Kailash Colony New Delhi
LT GEN AJAI SINGH
Name
LT GEN AJAI SINGH
PAN
XXXX597G
Email
haryanarera@dlf.in
Mobile
9711080232
Landline
01244769000
Address
B-12 West End New Delhi 110021

Contact Details

Project ContactEmail: haryanarera@dlf.inMobile: 9711080232Landline: 01244769000
Project Contact PersonName: MR NIMIT PORWALEmail: haryanarera@dlf.inMobile: 9711080232Landline: 01244769000

Land Details

Land Area16.489 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land16.489 (Acre)

Land Usage

Land Cost5309.16 Lakhs
Other Cost62155.91 Lakhs
Estimated Project Cost618651.83 Lakhs
Estimated Infrastructure Cost37579.8 Lakhs
Estimated Apartment Construction Cost513606.96 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other958
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Earth Work--03121.4
Electricity Supply System--00
Other--00
Parks and Playgrounds--00
Rain Water Harvesting----
Roads & Pavements--00
Sewerage System----
Sewerage treatment & garbage disposal--00
Shopping area--00
Storm Water Drainage--00
Street Lighting----
UGT----
Water Supply System--00
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Earth Work780.352341.053121.43121.4
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting----
Roads & Pavements0000
Sewerage System----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
UGT----
Water Supply System0000
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Earth Work3121.4---
Electricity Supply System0---
Other0---
Parks and Playgrounds0---
Rain Water Harvesting----
Roads & Pavements0---
Sewerage System----
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street Lighting----
UGT----
Water Supply System0---
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Earth Work----
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting----
Roads & Pavements0000
Sewerage System----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
UGT038.8193.98323.3
Water Supply System0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00-0
Earth Work----
Electricity Supply System00-0
Other00-0
Parks and Playgrounds00-0
Rain Water Harvesting---0
Roads & Pavements00-0
Sewerage System---0
Sewerage treatment & garbage disposal00-0
Shopping area00-0
Storm Water Drainage00-0
Street Lighting---0
UGT452.62284.5--
Water Supply System00-0
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Earth Work----
Electricity Supply System22.8250.2162.3983.69
Other0000
Parks and Playgrounds272.92600.42745.981000.7
Rain Water Harvesting7.616.7220.7827.87
Roads & Pavements883.941944.682416.123241.13
Sewerage System0000
Sewerage treatment & garbage disposal33.2273.0990.8121.81
Shopping area0000
Storm Water Drainage10.6523.4229.139.03
Street Lighting14.9532.8840.8554.8
UGT----
Water Supply System75165205275
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Earth Work----
Electricity Supply System57.8238.0430.4311.87
Other0000
Parks and Playgrounds691.39454.86363.89141.92
Rain Water Harvesting19.2612.6710.143.95
Roads & Pavements2239.331473.241178.59459.65
Sewerage System0000
Sewerage treatment & garbage disposal84.1655.3744.2917.28
Shopping area0000
Storm Water Drainage26.9717.7414.195.54
Street Lighting37.8624.9119.937.77
UGT----
Water Supply System19012510039

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSECONCRETE (M30-M90 AS PER IS-456 IS2185)
WALL FINISHING DETAILSBLOCK WORK
KITCHEN DETAILSNA
BATHROOM FITTINGSCP FITTING, WASH BASIN, WC
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESMS/UPVC/AL/WOOD/COMPOSITE MATERIAL
GLASS WORKCLEAR/ TINTED/ FROSTED/ COATED
ELECTRIC FITTINGSLIGHT FIXTURE FOR BALCONIES ONLY
CONDUCTING AND WIRING DETAILSNA
CUPBOARD DETAILSNONE
WATER STORAGEOHT & UGT TANKS
LIFT DETAILSBRANDED MAKE
EXTERNAL GLAZINGSUPVC/ ALUMINIUM
WINDOWS/GLAZINGSSAME AS POINT#13
DOORSMS FIRE RATED DOOR
MAIN DOORSMS DOOR
INTERNAL DOORSHARDWOOD /WOODEN FLUSH DOOR/ MS
AIR CONDITIONINGOUTDOOR UNIT OF VARIABLE REFRIGERANT FLOW (VRF)
ELECTRICAL FITTINGSSAME AS POINT#8
CNG PIPE LINEGAS PIPELINE PROVISION ONLY
PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADED PAINT
INTERNAL FINISHINGBLOCK WORK

Unit-wise Specifications

TOILET
FLOORCONCRETE
WALLSBLOCKWORK
CEILINGCONCRETE SLAB
COUNTERSNONE
SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC
FIXTURESNA
KITCHEN
FLOORCONCRETE
WALLSBLOCKWORK
CEILINGCONCRETE SLAB
COUNTERSNA
FIXTURESWATER POINT WITH TAP
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORCONCRETE
WALLS & CEILINGBLOCKWORK
RAILINGSMS/SS/AL/GLASS
FIXTURESCEILING LED LIGHTS
BED ROOMS
FLOORCONCRETE
WALLSBLOCKWORK
CEILINGCONCRETE SLAB
WARDROBESNA
MASTER TOILET
FLOORCONCRETE
WALLSBLOCKWORK
CEILINGCONCRETE SLAB
COUNTERSNONE
SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORCONCRETE
WALLSBLOCKWORK/BRICKWORK
CEILINGCONCRETE SLAB
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORCONCRETE
WALLSBLOCK WORK
CEILINGCONCRETE SLAB
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCONCRETE
WALLS & CEILINGBLOCKWORK
TOILETCP FITTINGS, WASH BASIN, WC
BALCONYCONCRETE

Fee Details

Payment 1
amount:11764500
cheque no:523932
draft date:30-07-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK