NewActive

THE BLUE

Ghaziabad, Uttar Pradesh
31-08-2022
Launch Date
New
Type
29-08-2027
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

29-08-2027

RERA ID

UPRERAPRJ899584

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)6853
Project NameTHE BLUE
Registration Fee (in Rs.)39500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)60
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date31-08-2022
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)14210
Proposed Completion Date29-08-2027

Location

Latitude

23.1446

Longitude

77.40118

Bank Details

Account Details
Name of the AccountTANDT INFRA BUILDERS PVT LTD COLLECTION A/C FOR THE BLUE
Account Number721705000277
Bank NameICICI BANK
Branch NameChander Nagar, Ghaziabad
Branch AddressHall No. 3, Plot No. 1 and 2, Chander Nagar, Ghaziabad, 201011
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0007217
Separate Account Details
Name of the AccountTANDT INFRA BUILDERS PVT LTD SEPARATE BANK A/C FOR THE BLUE
Account Number721705000275
Bank NameICICI BANK
Branch NameChander Nagar, Ghaziabad
Branch AddressHall No. 3, Plot No. 1 and 2, Chander Nagar, Ghaziabad, 201011
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0007217
Transaction Account Details
Name of the AccountTANDT INFRA BUILDERS PVT LTD RERA TRANSACTION A/C FOR THE BLUE
Account Number721705000276
Bank NameICICI BANK
Branch NameChander Nagar, Ghaziabad
Branch AddressHall No. 3, Plot No. 1 and 2, Chander Nagar, Ghaziabad, 201011
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0007217

Development Works

Demarcation of Plots

Group Housing at Plot No. 3/ SP-07, Sector- 03, Siddharth Vihar, Ghaziabad, Uttar Pradesh, Total Plot Area= 9779.00 Square Meters.

Boundary Wall

230 mm wide and 2.1 metre high earthquake resistant boundary wall of RCC/ Mild Steel/ Brick filled.

Road Work

All roads in the complex will be in combination of concrete pavers of different colours, shape, thickness. Roads will be laid over 225 mm water bound macadam.

Footpaths

All footpath in the complex will be in combination of concrete pavers of different colours, shape and thickness of 65 mm and 80mm laid over 150 mm water bound macadam surface.

Water Supply Including Drinking Water Facilities

Potable water supply from municipal water supply shall be collected in underground collection tank and pumped to overhead water tank. The supply of water to individual flats shall be from the said overhead water tanks.

Sewer System

The sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project, and treated water will be used for irrigation and flushing purpose.

Drain

Drains having a minimum width of 150 mm will be provided for collection and channelization of rain water (surface run off).

Parks

Internal park will be provided and maintained. The parks will have jogging tracks, children play area and sitting areas.

Tree Planting

The tress will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Tress will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.

Design For Electric Supply Including Street Lighting

Electric supply provided through 11/0.433 KV transformers and by DG set supply for backup.

Community Buildings

Not Applicable.

Treatment and Disposal System of Sewage and Sullage water

Sewage shall be treated in Sewage Treatment Plant (STP) and thereafter treated water to be used for flushing and irrigation.

Solid Waste Management And Disposal System

Solid waste to be collected from individual flats and stored in garbage room. Recyclable shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through approved agents.

Water Conservation System

Rain water harvesting pits shall be provided for ground wate recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.

Energy Management System Including Use of Renewable Energy

Single point metering will be there for energy purchased from the grid/ power supply company.

Fire Protection And Fire Safety System

Sprinkler, fire doors, yard hydrants, smoke detector and fire alarm system will be provided as applicable.

Social Infrastructure And Other Public Amenities Including Public Health Services

Common social infrastructure shall be provided for all the phases combined.

Emergency Evacuation Services

Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.

Other Miscellaneous Work

Not Applicable.

Documents

Registry Document

No: 2539 | Date: 22-07-2021

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 02-08-2022

Commencement Certificate

Uploaded: 27-07-2022

Proforma of Application Form

Uploaded: 27-07-2022

Proforma of Allotment Letter

Uploaded: 27-07-2022

Proforma of Conveyance Deed

Uploaded: 27-07-2022

Waste Disposal Plan

Uploaded: 27-07-2022

Water Supply Plan

Uploaded: 27-07-2022

Electricity Supply Plan

Uploaded: 27-07-2022

Development Work Plan

Uploaded: 27-07-2022

Affidavit

Uploaded: 27-07-2022

CA CERTIFICATE

Uploaded: 27-07-2022

ARCHITECT CERTIFICATE

Uploaded: 27-07-2022

ENGINEERS CERTIFICATE

Uploaded: 27-07-2022

Other

Uploaded: 29-07-2022

Permits

Orignal Permit NoHigh Risk/UPAVP/BP/21-22/1377/24032022
Orignal Permit Date20-06-2022
Valid Upto19-06-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto18-06-2030
End Date29-08-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Rakesh Bambola
Contractor AddressKLT Constructions Pvt. Ltd., RTF-51, Royal Tower, Indirapuram, Ghaziabad, 201014
Architect NameDipanjan Mitra
Architect AddressA6-1401, Gardenia AIMS, Glory, Sector 46, Noida
Architect Licence NumberCA-2003/31084
Structural Engineer NameSanjeev Jain
Structural Engineer AddressChordia Engineering Consultancy Services, I 1738, LGF, Chitranjan Park, New Delhi-110019
Mobile number(Project Co-ordinator)9289322602

Land Details

AFS

Showing 3 blocks with 79 units

Property Summary

Total Carpet Area

11751.65

126493.59 ft²

Total Units

111

2 different types

Blocks & Floors

3

33 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:105.87
Balconies:355
Parking ratio:0.00 per unit

Block 1D

39 units

Block 1B

32 units

Block Commercial

8 units

Khasra Details

Total Area

6853.53

73770.71 ft²

1 plot
Plot
TypePlot
Khasra/Plot No3/SP-07
Area(In Sq. Mt.)6853.53

Other Details

Contractor Name (if any)Rakesh Bambola
Contractor AddressKLT Constructions Pvt. Ltd., RTF-51, Royal Tower, Indirapuram, Ghaziabad, 201014
Architect NameDipanjan Mitra
Architect AddressA6-1401, Gardenia AIMS, Glory, Sector 46, Noida
Architect Licence NumberCA-2003/31084
Structural Engineer NameSanjeev Jain
Structural Engineer AddressChordia Engineering Consultancy Services, I 1738, LGF, Chitranjan Park, New Delhi-110019
Mobile number(Project Co-ordinator)9289322602