Group Housing at Plot No. 3/ SP-07, Sector- 03, Siddharth Vihar, Ghaziabad, Uttar Pradesh, Total Plot Area= 9779.00 Square Meters.
230 mm wide and 2.1 metre high earthquake resistant boundary wall of RCC/ Mild Steel/ Brick filled.
All roads in the complex will be in combination of concrete pavers of different colours, shape, thickness. Roads will be laid over 225 mm water bound macadam.
All footpath in the complex will be in combination of concrete pavers of different colours, shape and thickness of 65 mm and 80mm laid over 150 mm water bound macadam surface.
Potable water supply from municipal water supply shall be collected in underground collection tank and pumped to overhead water tank. The supply of water to individual flats shall be from the said overhead water tanks.
The sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project, and treated water will be used for irrigation and flushing purpose.
Drains having a minimum width of 150 mm will be provided for collection and channelization of rain water (surface run off).
Internal park will be provided and maintained. The parks will have jogging tracks, children play area and sitting areas.
The tress will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Tress will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.
Electric supply provided through 11/0.433 KV transformers and by DG set supply for backup.
Not Applicable.
Sewage shall be treated in Sewage Treatment Plant (STP) and thereafter treated water to be used for flushing and irrigation.
Solid waste to be collected from individual flats and stored in garbage room. Recyclable shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through approved agents.
Rain water harvesting pits shall be provided for ground wate recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Single point metering will be there for energy purchased from the grid/ power supply company.
Sprinkler, fire doors, yard hydrants, smoke detector and fire alarm system will be provided as applicable.
Common social infrastructure shall be provided for all the phases combined.
Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
Not Applicable.
Showing 3 blocks with 79 units
Total Carpet Area
11751.65 m²
126493.59 ft²
Total Units
111
2 different types
Blocks & Floors
3
33 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6853.53 m²
73770.71 ft²