OngoingActive

SUPERNOVA PHASE-II (SPIRA)

Gautam Buddha Nagar, Uttar Pradesh
20-08-2015
Launch Date
Ongoing
Type
28-09-2023
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

28-09-2023

RERA ID

UPRERAPRJ5720

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)20345
Project NameSUPERNOVA PHASE-II (SPIRA)
Registration Fee (in Rs.)107000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)98
DistrictGautam Buddha Nagar
Original Start Date23-01-2013
TehsilGautam Buddha Nagar
Proposed Start Date20-08-2015
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)96085
Proposed Completion Date28-09-2023

Location

Latitude

29.1417703

Longitude

77.336962

Bank Details

Account no.510101003297274
Name Of Account HolderSUPERTECH REALATORS PVT. LTD.
Bank NameCORPORATION BANK
Branch AddressCORPORATION BANK C-45 SECTOR-62, NOIDA
Branch NameCORPORATION BANK C-45 SECTOR-62, NOIDA
IFSC CodeCORP0001170

Development Works

Demarcation of Plots

As per approved building plans

Boundary Wall

As per approved building plans

Road Work

As per approved building plans

Footpaths

As per approved building plans

Water Supply Including Drinking Water Facilities

Water shall be provided by Authority & internal distribution shall be done by developer.

Sewer System

STP shall be provided for sewerage system.

Drain

Proper drainage system shall be provided

Parks

As per approved plans

Tree Planting

As per approved plans

Design For Electric Supply Including Street Lighting

As per approval from authority.

Community Buildings

As per approved building plans

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.

Solid Waste Management And Disposal System

Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.

Water Conservation System

Adequate nos of recharge pits shall be provided

Energy Management System Including Use of Renewable Energy

In common areas LED lights shall be provided with timer control.

Fire Protection And Fire Safety System

As per fire NOC

Social Infrastructure And Other Public Amenities Including Public Health Services

As per approved building plans

Emergency Evacuation Services

As per fire NOC

Other Miscellaneous Work

As per approved building plans

Documents

Lease Deed

No: 5827 | Date: 19-07-2011

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Affidavit

CA CERTIFICATE

Details of Encumbrances

Uploaded: 13-04-2019

Commencement Certificate

Uploaded: 05-07-2018

Proforma of Application Form

Uploaded: 05-07-2018

Proforma of Allotment Letter

Uploaded: 05-07-2018

Proforma of Conveyance Deed

Uploaded: 05-07-2018

Waste Disposal Plan

Uploaded: 05-07-2018

Water Supply Plan

Uploaded: 05-07-2018

Electricity Supply Plan

Uploaded: 05-07-2018

Development Work Plan

Uploaded: 05-07-2018

ARCHITECT CERTIFICATE

Uploaded: 05-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Authentic copy of Approval of Project

Uploaded: 29-12-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 29-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 29-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 29-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 29-12-2017

Authentic copy of Approval of Project

Uploaded: 29-12-2017

Authentic copy of Approval of Project

Uploaded: 29-12-2017

Authentic copy of Approval of Project

Uploaded: 29-12-2017

Authentic copy of Approval of Project

Uploaded: 29-12-2017

Permits

Orignal Permit NoIV-1315/588
Orignal Permit Date13-12-2012
Valid Upto12-12-2017
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto11-12-2022
End Date30-06-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect Name modarch india
Architect AddressB-99 Sec-63 Noida ( UP)
Architect Licence NumberCA/98/22706
Structural Engineer NameBuro Happold
Structural Engineer AddressAckrutiCoroprate Park , G-1 , LBS Marg next to GE Garden , Mumbai -400078 India
Mobile number(Project Co-ordinator)9310012345

Land Details

AFS

Showing 1 blocks with 278 units

Property Summary

Total Carpet Area

63897.99 m²

687791.57 ft²

Total Units

970

6 different types

Blocks & Floors

1

76 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:65.87 m²
Balconies:307
Parking ratio:0.00 per unit

Block SPIRA TOWER

278 units

Khasra Details

Total Area

70002.00 m²

753494.53 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPLOT NO 3, SECTOR 94
Area(In Sq. Mt.)70002

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect Name modarch india
Architect AddressB-99 Sec-63 Noida ( UP)
Architect Licence NumberCA/98/22706
Structural Engineer NameBuro Happold
Structural Engineer AddressAckrutiCoroprate Park , G-1 , LBS Marg next to GE Garden , Mumbai -400078 India
Mobile number(Project Co-ordinator)9310012345