Launch Date
Completion Date
RERA ID
28.71186
77.42982
As per the approved drawings, the demarcation of plots was done by a total station machine. Individual plots will be marked by brickwork.
RCC cum brick wall having a thickness of 230mm. RCC cum brick wall having a thickness of 230 mm. The height of the boundary wall will be 7 feet from 0-0 level. The boundary walls will be earthquake-resistant.
Main road with black top of 50 mm. Sub-base will be 2 layers of 80 mm boulder and GSB.
On the remaining compacted soil, we will lay interlocking tiles on the footpath or provide RCC on sidewalks.
For every individual plot, drinking water connection through a PVC line. A UG tank of 1 lakh liter will be provided for the storage of water.
A centralized sewerage system shall be provided. All sewerage water shall be recycled and it will be used in gardening and overflow from it shall be connected with the Municipal sewerage system.
A stormwater system shall be provided. Stormwater from roads and other landscape areas shall be connected to the stormwater drain channel and it will go to the rainwater harvesting pit for recharging the groundwater and overflow shall be connected with the municipal drain line.
A lush green internal park will be provided and maintained. The parks will have jogging tracks, childrens play areas, and sitting areas. The total park area in the project will be 2013 sq. mt.
The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora, and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage of the project.
We have designed the system as sanctioned by the local electricity board. We will provide a transformer, HT panel, LT Panel, and DG backup for common services like electrical lighting, water pumps, etc.
Not Applicable
Treated water shall be used for irrigation, and pathway cleaning and excess sewage shall be discharged into the municipal sewer.
Manual collection and disposal as per GDA norms.
A well-designed rainwater harvesting system shall be provided for the whole plotting layout to conserve water.
Multiple-point metering will be provided for energy from the grid/ power supply company. Backup GD for common services will be provided.
Not Applicable
A garbage collection chamber of 30 sq. meters will be provided. Open chaabutra in 15 sq. meters.
Not Applicable
Not Applicable
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
23090.00 m²
248538.45 ft²
Processing Time
145 days
From application to approval
03-01-2024
27-05-2024