SONAL PALMS

Prayagraj, Uttar Pradesh
01-08-2024
Launch Date
New
Type
30-04-2029
Completion Date

Overview

Launch Date

01-08-2024

Completion Date

30-04-2029

RERA ID

UPRERAPRJ744618/10/2024

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)11448
Project NameSONAL PALMS
Registration Fee (in Rs.)62500
AddressPart of Arazi No. 421(Minjumla), Part of Arazi No. 422, Arazi No. 431(Minjumla), & Part of Arazi No. 432(Minjumla)
Village/Locality/Sector etc.Katka, Prayagraj
StateUttar Pradesh
Project Duration (In month)57
DistrictPrayagraj
Original Start Date-
TehsilPhulpur
Proposed Start Date01-08-2024
Sanctioning Competent AuthorityAllahabad Development Authority
Project Cost (in Lacs)10142
Proposed Completion Date30-04-2029

Location

Latitude

25.430543

Longitude

81.925078

Bank Details

Account Details
Name of the AccountSonal Infraventure Collection Account- Sonal Palms
Account Number0199102000013758
Bank NameIDBI BANK LTD
Branch NameM.G. Marg Prayagraj
Branch AddressJeevan Prakash Building 172 a/40 M. G. Marg civil lines Prayagraj
IFSC CodeIBKL0000199
Branch DistrictPrayagraj
Branch StateSelect
Branch Email Addressibkl0000199@idbi.co.in
Separate Account Details
Name of the AccountSonal Infraventure Separate Account- Sonal Palms
Account Number0199102000013767
Bank NameIDBI BANK LTD
Branch NameM.G. Marg Prayagraj
Branch AddressJeevan Prakash building 172 a/40 M. G. Marg civil lines Prayagraj
Branch StateUttar Pradesh
Branch DistrictPrayagraj
IFSC CodeIBKL0000199
Transaction Account Details
Name of the AccountSonal Infraventure Transaction Account- Sonal Palms
Account Number0199102000013749
Bank NameIDBI BANK LTD
Branch NameM.G. Marg Prayagraj
Branch AddressJeevan Prakash building 172 a/40 M. G. Marg civil lines Prayagraj
Branch StateUttar Pradesh
Branch DistrictPrayagraj
IFSC CodeIBKL0000199

Development Works

Demarcation of Plots

We have one plot of size 11447.58 sq. mtr. having 1 main entrance gate from the front road of 30m.

Boundary Wall

2 m high and 230 mm thick Brick work and rcc work in column and beam for boundary wall.

Road Work

From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project.

Footpaths

We would not provide any footpath

Water Supply Including Drinking Water Facilities

We will provide Two nos. of pump for the requirement of blocks through underground pipelines.

Sewer System

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system when come into force.

Drain

Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

We will provide green area with gaming facilities for kids.

Tree Planting

We will provide many type of trees all along the boundary wall & green area

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc.

Community Buildings

Community Hall will be Provided as per sanctioned map.

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

We will suggest to individual to use low flow fixtures and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.

Fire Protection And Fire Safety System

We will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

We will have staircases which will be provided with emergency exit doors and emergency exit gates for emergency evacuation services.

Other Miscellaneous Work

Gym & Swimming Pool on Terrace will be provided in the project.

Documents

Registry Document

No: 7916 | Date: 03-08-2023

Extract of Khatauni

No: 1426-1431 | Date: -

Extract of Khatauni

No: 1420-1425 | Date: -

Sale Deed

No: 4947 | Date: 10-06-2016

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 08-08-2024

Commencement Certificate

Uploaded: 08-08-2024

Proforma of Application Form

Uploaded: 08-08-2024

Proforma of Allotment Letter

Uploaded: 08-08-2024

Proforma of Conveyance Deed

Uploaded: 08-08-2024

Waste Disposal Plan

Uploaded: 28-08-2024

Water Supply Plan

Uploaded: 08-08-2024

Electricity Supply Plan

Uploaded: 28-08-2024

Development Work Plan

Uploaded: 08-08-2024

Affidavit

Uploaded: 08-08-2024

CA CERTIFICATE

Uploaded: 08-08-2024

ARCHITECT CERTIFICATE

Uploaded: 09-08-2024

ENGINEERS CERTIFICATE

Uploaded: 09-08-2024

Other

Uploaded: 08-08-2024

Proforma of Agreement for Sale

Uploaded: 08-08-2024

Permits

Orignal Permit NoGroup Housing/03193/PDA/BP/22-23/1039/09012024
Orignal Permit Date24-06-2024
Valid Upto23-06-2029
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto23-06-2032
End Date30-04-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameAr. MANISH GUJRAL
Architect Address52/25B, MUIR ROAD, PRAYAGRAJ, U.P.
Architect Licence NumberCA/97/21380
Structural Engineer NameSANTOSH KUMAR
Structural Engineer Address7/121B, SWAROOP NAGAR KANPUR
Mobile number(Project Co-ordinator)9984443089

Land Details

AFS

Showing 2 blocks with 359 units

Property Summary

Total Carpet Area

24093.14 m²

259336.15 ft²

Total Units

359

2 different types

Blocks & Floors

2

14 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:67.11 m²
Balconies:543
Parking ratio:0.00 per unit

Block Tower 1

247 units

Block Tower 2

112 units

Khasra Details

Total Area

11447.58 m²

123220.61 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot NoPart of Arazi No.s 421M, 422, 431M & 432M
Area(In Sq. Mt.)11447.58

Other Details

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameAr. MANISH GUJRAL
Architect Address52/25B, MUIR ROAD, PRAYAGRAJ, U.P.
Architect Licence NumberCA/97/21380
Structural Engineer NameSANTOSH KUMAR
Structural Engineer Address7/121B, SWAROOP NAGAR KANPUR
Mobile number(Project Co-ordinator)9984443089