RERA Received Date
Completion Date
RERA ID
25.409236
81.844495
The demarcation of the project plot has been carried out in accordance with the sanctioned layout plan and the relevant land records. The actual size of plot is 2750.00 Sq. meters which left 2365.86 Sq. Meters after Road Widening Area. 1 Main Gate from the front road shall be installed to excess the plot.
215 Sq. Meters Boundry wall shall be prepared which is 2.00 m high and 230 mm thick, Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
From the main entrance gate we have 80 mm RCC road through out the project. Whose wideness starts are 06.00 Meters which is in accordance with the sanctioned map approved by the authority
NA
We will provide 2 nos. of pump for the requirement of units through underground pipelines which refill the water tank of 30000.00 Litres capacity constructed at the top of the building
All Sewerage water shall be go to the Municipal sewerage system
Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
"We will provide green area with the different activities and the green area will have gaming facilities for kids."
We will provide many type of trees all along the boundary wall & green area
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc. Capacity of Transformer will be 400 KVA
The project shall include provision for a community building/space as part of the common amenities, intended for the use and benefit of the residents, and the same shall be developed in accordance with the approved layout plan
All Sewerage water shall be go to the Municipal sewerage system
There are a proper garbage collection area provided for the solid waste management.
We will suggest to every residnece owner to use low flow fixtures as well as we installed dual flush cistern in every washrooms and also make provision of rain water harvesting system to reduce the water consumption and improve the ground water level
We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
The project shall be equipped with adequate fire-fighting systems and safety equipment, and the same shall be installed in accordance with the applicable fire safety norms, approved building plans, and the relevant provisions and guidelines prescribed under the norms of the NOC obtained from Fire Department.
NA
We will have staircases which will be provided with emergency exit doors and emergency exit gates
NA
Showing 1 blocks with 99 units
Total Carpet Area
7042.07 m²
75800.14 ft²
Total Units
99
3 different types
Blocks & Floors
1
15 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2.00 m²
21.53 ft²