NewActive

SMART VILLA

Ghaziabad, Uttar Pradesh
01-10-2022
Launch Date
New
Type
31-10-2025
Completion Date

Overview

Launch Date

01-10-2022

Completion Date

31-10-2025

RERA ID

UPRERAPRJ427956

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)6593
Project NameSMART VILLA
Registration Fee (in Rs.)38000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)37
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-10-2022
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)4200
Proposed Completion Date31-10-2025

Location

Latitude

28.70737

Longitude

77.42772

Bank Details

Account Details
Name of the AccountMNG REALTECH SMART VILLA MASTER COLL ACCOUNT
Account Number50200074054572
Bank NameHDFC BANK
Branch NameSECTOR 26 NOIDA
Branch AddressSECTOR 26 NOIDA
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeHDFC000561
Separate Account Details
Name of the AccountMNG REALTECH SMART VILLA RERA SEPARATE ACCOUNT
Account Number50200074160193
Bank NameHDFC BANK
Branch NameSECTOR 26 NOIDA
Branch AddressSECTOR 26 NOIDA
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeHDFC000561
Transaction Account Details
Name of the AccountMNG REALTECH SMART VILLA TXN ACCOUNT
Account Number50200074026010
Bank NameHDFC BANK
Branch NameSECTOR 26 NOIDA
Branch AddressSECTOR 26 NOIDA
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeHDFC000561

Development Works

Demarcation of Plots

DONE

Boundary Wall

3.0 Meter height pre cast boundry wall

Road Work

Shell be developed as shown in layout heavy duity pawer shell be laid thikness will be 300 mm

Footpaths

Finished with interlocking tyles

Water Supply Including Drinking Water Facilities

CPVC pipes shell be laid down to underground water to overhead water tank in each block

Sewer System

UPVC pipes shell be laid sewerage to plumbing shaft joint to vertical stacks and the transfer to be the main mainholl

Drain

UPVC pipes for rainwater shell be laid in all balconey and tarrace and connected to the main Drain holl

Parks

10 Percent of plot area reserve for park andWill be completed at the time of possession

Tree Planting

Selver oak tree and Neem etc

Design For Electric Supply Including Street Lighting

Will be provided as per guidelines of UPPCL

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

STP is provided and excess treated water dispose to the main municipal sewer line

Solid Waste Management And Disposal System

WTP machine provided

Water Conservation System

Dual Flushing shell be provided

Energy Management System Including Use of Renewable Energy

NA

Fire Protection And Fire Safety System

All the Fire works will be done according to the NBC code 2016

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

According to NBC code 2016

Other Miscellaneous Work

Will be completed at the time of Possessio

Documents

Registry Document

No: 6274 | Date: 20-09-2012

Registry Document

No: 6275 | Date: 20-09-2012

Registry Document

No: 6325 | Date: 28-09-2012

Registry Document

No: 6326 | Date: 01-10-2012

Registry Document

No: 18368 | Date: 23-09-2021

Registry Document

No: 202200739068125 | Date: 12-05-2022

Registry Document

No: 202200739068108 | Date: 11-05-2022

Registry Document

No: 202200739068108 | Date: 11-05-2022

Details of Encumbrances

Commencement Certificate

Other Plan(If Any)

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Affidavit

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Other

Details of Encumbrances

Uploaded: 28-11-2022

Other Plan(If Any)

Uploaded: 06-12-2022

Proforma of Application Form

Uploaded: 28-11-2022

Proforma of Allotment Letter

Uploaded: 28-11-2022

Proforma of Conveyance Deed

Uploaded: 28-11-2022

Waste Disposal Plan

Uploaded: 01-10-2022

Water Supply Plan

Uploaded: 01-10-2022

Electricity Supply Plan

Uploaded: 01-10-2022

Development Work Plan

Uploaded: 01-10-2022

Affidavit

Uploaded: 16-11-2022

CA CERTIFICATE

Uploaded: 22-12-2022

ARCHITECT CERTIFICATE

Uploaded: 16-11-2022

ENGINEERS CERTIFICATE

Uploaded: 16-11-2022

Other

Uploaded: 27-12-2022

Permits

Orignal Permit Noplottedresidevelopment/plottedhousing//03584/GDA/LD/20-21/0842/20082022
Orignal Permit Date20-09-2022
Valid Upto19-09-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto18-09-2030
End Date31-10-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Shrinet infrastructure private limited
Contractor AddressC-2,/157B, ashok nagar, new delhi
Architect Namegaurav singla
Architect Address506, AJKG, Sector-18, vasundra, ghaziabad,U.P.
Architect Licence NumberCA/2012/55623
Structural Engineer NameRzest engineers
Structural Engineer Addressgafar manzil, jamia nagar, new delhi 110025
Mobile number(Project Co-ordinator)9810063113

Khasra Details

Total Area

6592.85

70964.78 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No1073,1074,1075
Area(In Sq. Mt.)6592.85

Other Details

Contractor Name (if any)Shrinet infrastructure private limited
Contractor AddressC-2,/157B, ashok nagar, new delhi
Architect Namegaurav singla
Architect Address506, AJKG, Sector-18, vasundra, ghaziabad,U.P.
Architect Licence NumberCA/2012/55623
Structural Engineer NameRzest engineers
Structural Engineer Addressgafar manzil, jamia nagar, new delhi 110025
Mobile number(Project Co-ordinator)9810063113
SMART VILLA by MNG REALTECH LLPKULDEEP TYAGIMANISH SHARMAMANVENDRA KUMARNARESH KUMAR SINGHALNITIN SINGHALPRAKHAR SINGHALVIVEK KUMAR SINGHAL | ReraTracker