Launch Date
Completion Date
RERA ID
28.707361
77.427583
75.38M(N), 67.37M(E), 72.71M(S), 64.83M(W)
CONSISTING HEIGHT (7FT) CONSISTING OF RCC AND BRICK WORK
SUBBASE (300MM), AGRREGATE BASE TYPE-2(300MM), AGGREGATE BASE TYPR-2(250MM), BITUMIN BINDER COURSE (70MM), WEARING COURSE(50MM)
150 MM HIGH FROM ROAD LEVEL WITH INTERLOCKING TILES AND CUBE STONE
FOR WATER SUPPLY INCLUDING DRINKING WATER FACILITES IS USED FROM BOREWELL
SEWER SYSTEM IS INSTALLED WITH SLOBE AS PER GUIDLINES
DRAINS IS INSTALLED WITH SLOPE AS PER GUILDLINE
HARD AND SOFT LANDSCAPE IS DONE IN PARK AREA WITH ELECTRICAL LIGHTING
DIFFERENET VARIABLES OF TREES ARE PLANTED AS PER SITE CONDITIONS
STREET LIGHT IS DIRECTLY OPREATED BUT SOLAR PANEL INSTALLED IN TOP FLOOR
N/A
STP WILL BE INSTTALED IN THE BASEMENT FOR SULLAGE AND TREATMENT SYSTEM
WILL BE DONE BY EXTERNAL VENDOR
RAIN WATER HARVESTING PIT IS GIVEN IN OPEN AREA FOR TERRACE WATER AND SITE WATER
SOLAR PLAT WILL BE INSTALLED ON TOP OF BUILDING FOR CONVERSION OF ELECTRICITY
FIRE EQUIPEMENT AND FIXTURES WILL BE DONE AS PER THE NBC CODE 2016
N/A
FIRE EQUIPEMENT AND FIXTURES WILL BE DONE AS PER THE NBC CODE 2016
WILL BE COMPLETED BEFORE COMPLETION
Showing 1 blocks with 177 units
Total Carpet Area
7485.93 m²
80577.80 ft²
Total Units
175
2 different types
Blocks & Floors
1
12 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
10280.00 m²
110652.89 ft²