Total Units
168
2 unit types
Carpet Area
1,23,620 ft²
11,484.72 m² · carpet only, excludes balcony
Blocks & Floors
1
12 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 736 ft² (68.36 m²)Balconies 192Parking per unit 0.00
All blocks
Showing 50 of 60 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| Silverbell | GF | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | GF | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | GF | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | GF | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | GF | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 1 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 1 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 1 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 1 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 1 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 2 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 2 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 2 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 2 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 2 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 3 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 3 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 3 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 3 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 3 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 4 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 4 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 4 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 4 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 4 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 5 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 5 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 5 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 5 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 5 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 6 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 6 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 6 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 6 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 6 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 7 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 7 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 7 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 7 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 7 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 8 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 8 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 8 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 8 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 8 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
| Silverbell | 9 | 3 BHK | 4 | 895 ft²83.11 m² | 4 | 150 ft²13.97 m² |
| Silverbell | 9 | 3 BHK | 4 | 750 ft²69.69 m² | 3 | 174 ft²16.14 m² |
| Silverbell | 9 | 2 BHK | 3 | 655 ft²60.81 m² | 3 | 152 ft²14.16 m² |
| Silverbell | 9 | 2 BHK | 1 | 652 ft²60.57 m² | 3 | 126 ft²11.75 m² |
| Silverbell | 9 | 2 BHK | 2 | 554 ft²51.43 m² | 3 | 137 ft²12.70 m² |
Private- Free Hold Land, Demarcation was already done before starting the project
Boundary wall on RCC Tie, Beam on RCC Footing
Cements Concrete Internal Roads( CC Roads above two Layers of WBM
Interlocking Tile, on PCC on competed surface
To Be provided by Ghazvanid Development Authority and stores will be done underground water tanks
Main Sewer line has been design as per norm and partially led in basement ceiling and will finally connect to sewer line/ STP
Under ground Drain pipe with chamber
Landscape and park has been designed as per authority guide lines
Tree panting has been design as per Authority Guide lines
Design has been done as per Up electricity Board Guide lines
Club has been Design as per Authority Norms and facility like party hall gaming zone Entertainment area gym etc.
Sewage will be treated for recycling ( if required ) other wise it will be connected to sewage line of Authority which is already connected to central functional STP of GDA For this locality.
Door to Door Collection and will be treated by waste disposal management.
Recycling of Treated water and rain water harvesting system to be provided.
Solar panel will be provided as per norms as suitable Places
Fire System is being executed per the norm of department of fire.
Nursery School in the premises
Provision of exit sign and emergency light.
N/A
Shalimar City Phase-1 is located in Ghaziabad.
Yes. Shalimar City Phase-1 is registered under UPRERAPRJ6106 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Shalimar City Phase-1 is 9 September 2018.
Shalimar City Phase-1 is developed by MR PROVIEW REALTECH PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.