NewActive

SG ORCHARD

Ghaziabad, Uttar Pradesh
16-02-2026
RERA Received Date
New
Type
15-01-2031
Completion Date

Overview

RERA Received Date

16-02-2026

Completion Date

15-01-2031

RERA ID

UPRERAPRJ844382/02/2026

Location

Latitude

28.719371

Longitude

77.433924

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)15626
Project NameSG ORCHARD
Registration Fee (in Rs.)83500
AddressKhasra No. 350M and 351
Village/Locality/Sector etc.Village Bhovapur, Raj Nagar Extension
StateUttar Pradesh
Project Duration (In month)59
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date16-02-2026
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)38366
Proposed Completion Date15-01-2031

Bank Details

Account Details
Name of the AccountS.G. ESTATES PRIVATE LIMITED COLLECTION ACCOUNT FOR SG ORCHARD
Account Number777705754601
Bank NameICICI BANK
Branch NameRAJ NAGAR EXTENSION
Branch AddressRAJ NAGAR EXTENSION
IFSC CodeICIC0007546
Branch DistrictGhaziabad
Branch StateUttar Pradesh
Branch Email Address[email protected]
Separate Account Details
Name of the AccountS.G. ESTATES PRIVATE LIMITED SEPARATE BANK ACCOUNT FOR SG ORCHARD
Account Number77770574602
Bank NameICICI BANK
Branch NameRAJ NAGAR EXTENSION
Branch AddressRAJ NAGAR EXTENSION
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0007546
Transaction Account Details
Name of the AccountS.G. ESTATES PRIVATE LIMITED RERA TRANSACTION ACCOUNT FOR SG ORCHARD
Account Number777705754603
Bank NameICICI BANK
Branch NameRAJ NAGAR EXTENSION
Branch AddressRAJNAGAR EXTENSION
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0007546

Development Works

Demarcation of Plots

North - Khasra no. 348 and 349 South- Khasra no. 362 East-Khasra no. 352 West - 30-meter-wide road

Boundary Wall

Combination of M.S. Railing, Brickwork and R.C.C wall. Height will be in range of 1.8 meters to 2.1 meters as per design.

Road Work

All internal roads in the project will be combination of Concrete Pavers of different shapes, colors/Interlocking Tiles/Cement Concrete as per the design with approximate thickness of 200 mm (pcc and pavers)

Footpaths

75 mm high from the road level with CC interlocking tiles over the subbase PCC and thick bed of sand

Water Supply Including Drinking Water Facilities

Water supply will be provided to individual flats from the overhead tanks. The water will be lifted to overhead tanks from the underground tanks through adequate pumping system.

Sewer System

Internal drainage system will be developed (within the boundary of the project) and connected to project STP (230 KLD) for treatment

Drain

Internal network of drainage with minimum diameter of 150 mm will be developed within the boundary of the project and will be connected to GDA drainage system.

Parks

Internal Parks will be made as per the Sanctioned layout. Adequate Number of trees (Minimum 84 as per sanction) and plants will be planted. Kids swings will be provided along with sitting bench

Tree Planting

Tree plantation (Minimum 84 as per sanction) will be done along the project boundary and in green area

Design For Electric Supply Including Street Lighting

Electricity system of the project will be developed for supply electricity to individual flats and for common area. Adequate streetlights (LED) will be provided in the common area.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Sewage will be treated in STP (230 KLD) and excess treated water will be discharged in municipal drain after approval

Solid Waste Management And Disposal System

Solid waste will be collected from Individual flats and will be processed in Organic waste converter

Water Conservation System

Adequate rainwater harvesting pits (4 ) will be provided as per the sanction conditions. Treated water will be used for gardening and flushing etc.

Energy Management System Including Use of Renewable Energy

Electric Load will be taken from the UPPCL and electric infrastructure will be made by the company. Individual meter will be taken by client as per the multi-meter system. Solar panel will be installed on roof top.

Fire Protection And Fire Safety System

Requisite Fire protection system will be installed as pe the terms of the Fire NOC granted

Social Infrastructure And Other Public Amenities Including Public Health Services

Multipurpose Hall (500 sq.meters) , Gymnasium (150 sq.meters) , Kids Play Area (150 square.meters) , Indoor Games (100 square.meters) , Swimming pool etc. will be provided.

Emergency Evacuation Services

Fire staircases will be provided as per the approved maps for evacuation to open areas. Refuge area on 19th floor will be provided in every tower as per sanction maps.

Other Miscellaneous Work

Guard Room, Entrance and exit gates, maintenance room, commercial facilities, CCTV, security guards for proper watch and ward.

Documents

Sale Deed

No: 8425 | Date:

Extract of Khatauni

No: 2019-2025 | Date:

Details of Encumbrances

Uploaded: 09-01-2026

Commencement Certificate

Uploaded: 23-01-2026

Other Plan(If Any)

Uploaded: 09-01-2026

Proforma of Application Form

Uploaded: 09-01-2026

Proforma of Allotment Letter

Uploaded: 09-01-2026

Proforma of Conveyance Deed

Uploaded: 09-01-2026

Proforma of Completion Certificate(Occupancy)

Uploaded: 09-01-2026

Waste Disposal Plan

Uploaded: 24-01-2026

Water Supply Plan

Uploaded: 24-01-2026

Electricity Supply Plan

Uploaded: 24-01-2026

Development Work Plan

Uploaded: 23-01-2026

Affidavit

Uploaded: 27-01-2026

CA CERTIFICATE

Uploaded: 27-01-2026

ARCHITECT CERTIFICATE

Uploaded: 06-02-2026

ENGINEERS CERTIFICATE

Uploaded: 03-02-2026

Proforma of Agreement for Sale

Uploaded: 17-02-2026

Permits

Orignal Permit NoGroupHousing/10057/GDA/BP/25-26/0574/06012026
Orignal Permit Date06-01-2026
Valid Upto05-01-2031
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-01-2034
End Date15-01-2031
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)SG ESTATES PVT. LTD.
Contractor Address308-309, 3RD FLOOR, SALCOM AURUM, JASOLA DISTRICT CENTRE, NEW DELHI-110025
Architect NameSPACE DESIGNERS INTERNATIONAL
Architect AddressB-34, SECTOR-67, NOIDA-201301
Architect Licence NumberCA/1998/23185
Structural Engineer NameKEEN ASSOCIATES PVT. LTD.
Structural Engineer AddressGROUND FLOOR, COMMERCIAL AREA, SECTOR-63, NOIDA
Mobile number(Project Co-ordinator)9001997204

Land Details

AFS

Showing 6 blocks with 419 units

Property Summary

Total Carpet Area

51379.44 m²

553043.15 ft²

Total Units

511

7 different types

Blocks & Floors

6

25 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:100.55 m²
Balconies:1528
Parking ratio:0.00 per unit

Block Tower 3

96 units

Block Tower 4

92 units

Block Tower 5

123 units

Block Tower 1

57 units

Block Tower 2

50 units

Block TOWER 4

1 units

Khasra Details

Total Area

15626.00 m²

168196.70 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No351 AND 350m
Area(In Sq. Mt.)15626

Other Details

Contractor Name (if any)SG ESTATES PVT. LTD.
Contractor Address308-309, 3RD FLOOR, SALCOM AURUM, JASOLA DISTRICT CENTRE, NEW DELHI-110025
Architect NameSPACE DESIGNERS INTERNATIONAL
Architect AddressB-34, SECTOR-67, NOIDA-201301
Architect Licence NumberCA/1998/23185
Structural Engineer NameKEEN ASSOCIATES PVT. LTD.
Structural Engineer AddressGROUND FLOOR, COMMERCIAL AREA, SECTOR-63, NOIDA
Mobile number(Project Co-ordinator)9001997204