Launch Date
Completion Date
RERA ID
284012N
772244E
completed at time of possession of plot from UPAVP
Brick work with RCC columns.
External roads developed and in scope of Ghaziabad Nagar Nigam. Internal roads of interlocking tiles.
NA
Gangajal water supply from Jal Nigam
Internal Sewerage System to be developed by us. External system developed and working by Nagar Nigam.
Internal Drainage system to be developed by us. External drainage systemfor final disposal in place and in scope of Ghaziabad Nagar Nigam
Park to be developed as per the sanctioned layout comprising grass and kids swings with benches.
As per norms
Internal street lights will be provided within the boundaries of the project.
NA
Disposal will be in the sewerage system developed by Ghaziabad Nagar Nigam after due permission and connection.
As per approved norms.
Rain water harvesting system
Single Point Meter Connection from UPPCL and load will be distributed using prepaid electricity system.
As per the conditions laid in the Fire NOC
Multipurpose hall, gym, kids room for the residents
NA
NA
Showing 1 blocks with 135 units
Total Carpet Area
14034.00 m²
151060.57 ft²
Total Units
200
4 different types
Blocks & Floors
1
23 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4442.00 m²
47813.24 ft²