Launch Date
Completion Date
RERA ID
284230
772502
Done.
Yes. Completed
Internal Roads within boundry of the project to be constructed by us. External roads in scope of the Ghaziabad Development Authority (GDA)
NA
Yes.
Yes. External sewerage system in scope of GDA
Internal Drains completed. External drainage system in scope of GDA
Yes.
Yes as per norms
Yes for the common areas
Club
Yes. External system and final disposal in scope of GDA
Garbage collection and disposal as per norms. (Part of Maintenance)
Yes. Provision of Rain Water Harvesting
Single point electric connection from UPPCL and further distribution through Prepaid Metering System
As per norms.
Multipurpose Hall, Gym, Indoor Games etc.
NA
NA
Showing 7 blocks with 337 units
Total Carpet Area
56495.77 m²
608114.82 ft²
Total Units
970
3 different types
Blocks & Floors
7
20 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
24840.00 m²
267375.28 ft²