Launch Date
Completion Date
RERA ID
284057
772909
Done.
Yes. Completed
Internal Roads within boundry of the project to be constructed by us. External roads in scope of the Ghaziabad Development Authority (GDA)
NA
Yes.
Yes. External sewerage system in scope of GDA
Internal Drains completed. External drainage system in scope of GDA
Green Area
As per norms
Yes for the common areas
N0
Sewerage System Operation of GDA
Garbage collection and disposal as per norms. (Part of Maintenance)
Yes. Provision of Rain Water Harvesting
Single point electric connection from UPPCL and further distribution through Prepaid Metering System
As per norms.
Gym, Indoor Games
NA
NA
Showing 1 blocks with 179 units
Total Carpet Area
17760.39 m²
191171.06 ft²
Total Units
247
4 different types
Blocks & Floors
1
17 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5273.22 m²
56760.41 ft²