Launch Date
Completion Date
RERA ID
28.709326
77.423765
Marking of plot as per site/ Registry
On the outter periphery of plot as per site.
Trimix & interlocking tiles.
Side pathways designed along the internal roads
To be Provide by GDA and Ground Water
Main Sewer line has been designed as per norms and partially lay in basement ceiling and will finally connect to STP
Underground pipe drain with chamber
Landscape and Tree Planting has been designed by as per authority guidelines
Tree Planting has been done along the boundary walls and in central park & designed by as per authority guidelines
Designed has been done as per UP electricity board guidelines
NA
Sewer will be treat for recycling (if required) otherwise it will connected to the sewer line of authority which is already connected to central functional STP of GDA for this localit
Door to Door Collection and will be disposed up to garbage point of authority
Recycling of treated water and rain water syestem to be provide
NA
System will be provide as per the fire department guidelines
NA
System will be provide as per the guidelines
NA
Showing 1 blocks with 48 units
Total Carpet Area
11700.08 m²
125938.49 ft²
Total Units
176
2 different types
Blocks & Floors
1
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2913.00 m²
31355.24 ft²