28.709326
77.423765
Marking of Plot Boundary as per site/ Registry
At outter Periphery of Plot & its constructed in Bricks/ RCC
Trimix Road & Interlocking Tiles
Side walking Pathways along with roads
Ground water or To be Provided by the Ghaziabad Development Authority and Storage will be done in under ground water tank.
Main Sewer line has been designed as per norms and partially lay in basement ceiling and will finally connect to STP
Underground pipe drain with chamber
Landscape and Tree Planting has been designed by as per authority guidelines
Trees plantation have been done along the boundary walls and in central park as per authority guidelines
Designed has been done as per UP electricity board guidelines
NA
Sewer will be treat for recycling (if required) otherwise it will connected to the sewer line of authority which is already connected to central functional STP of GDA for this locality.
Door to Door Collection and will be disposed up to garbage point of authority
Recycling of treated water and rain water system to be provide
Solar panel has been provided as per norms at suitable place
System will be provide as per the fire department guidelines
NA
As per guidelines and building by- laws
NA
Showing 1 blocks with 42 units
Total Carpet Area
12118.82 m²
130445.77 ft²
Total Units
154
1 different types
Blocks & Floors
1
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
17153.00 m²
184633.18 ft²