NewActive

SCC BLOSSOM (PMAY) PH-2 BLOCK C AND BLOCK D

Ghaziabad, Uttar Pradesh
30-06-2019
Launch Date
New
Type
29-09-2026
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

29-09-2026

RERA ID

UPRERAPRJ245194

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)5703
Project NameSCC BLOSSOM (PMAY) PH-2 BLOCK C AND BLOCK D
Registration Fee (in Rs.)34000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)87
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date30-06-2019
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)5297
Proposed Completion Date29-09-2026

Location

Latitude

28.705489

Longitude

77.436161

Bank Details

Account no.07171100011304
Name Of Account HolderSCC BUILDERS PVT LTD
Bank NamePUNJAB AND SIND BANK
Branch AddressP-18/90 CONNAUGHT CIRCUS,NEW DELHI
Branch NameCORPORATE BANKING BRANCH
IFSC CodePSIB0000717

Development Works

Demarcation of Plots

Marking of Plot Boundary will be as per possession given by previous owner in presence of Tehsil staff

Boundary Wall

At outter Periphery of Plot & will be constructed in Bricks/ RCC

Road Work

Trimix / Interlocking Tiles

Footpaths

NA

Water Supply Including Drinking Water Facilities

To be Provided by the Ghaziabad Development Authority or ground water(subject to approval from concerned authority) and Storage will be done in under ground water tank.

Sewer System

Main Sewer line will be construct as per approved drawing and partially lay in basement ceiling and will finally connect to sewer line.

Drain

NA

Parks

10 Percent of net plot area will be develop .

Tree Planting

Trees plantation will be done along the boundary walls and in central park as per authority guidelines

Design For Electric Supply Including Street Lighting

Electric supply will be provided by GDA/ PVVNL and street light inside housing project will be installed as per drawing.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Sewer will be treat for recycling (if required) otherwise it will connected to the sewer line of authority which is already connected to central functional STP of GDA for this locality.

Solid Waste Management And Disposal System

As per sanction of GDA

Water Conservation System

rain water harvesting system will be develop as per sanction drawing.

Energy Management System Including Use of Renewable Energy

AS per sanction drawings of GDA

Fire Protection And Fire Safety System

System will be provided as per the provisional Fire NOC

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

As per guidelines and building by- laws

Other Miscellaneous Work

NA

Documents

Registry Document

No: 172 | Date: 06-01-2017

Registry Document

No: 173 | Date: 06-01-2017

Details of Encumbrances

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Water Supply Plan

Electricity Supply Plan

Affidavit

CA CERTIFICATE

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 29-03-2019

Commencement Certificate

Uploaded: 18-03-2019

Other Plan(If Any)

Uploaded: 18-03-2019

Proforma of Application Form

Uploaded: 18-03-2019

Proforma of Allotment Letter

Uploaded: 29-03-2019

Proforma of Conveyance Deed

Uploaded: 29-03-2019

Waste Disposal Plan

Uploaded: 29-03-2019

Water Supply Plan

Uploaded: 29-03-2019

Electricity Supply Plan

Uploaded: 29-03-2019

Development Work Plan

Uploaded: 29-03-2019

Affidavit

Uploaded: 29-03-2019

Permits

Orignal Permit No07/PMAY GDA/MP/2018
Orignal Permit Date10-01-2019
Valid Upto09-01-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-01-2027
End Date30-06-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No07/PMAYGDA/MP/2018
Orignal Permit Date10-01-2019
Valid Upto09-01-2024
Revalidated Permit No07/PMAYGDA/MP/2018
Revalidated Permit Date10-01-2019
Revalidated Permit Valid Upto09-01-2027
Permit Extendable Upto09-01-2027
End Date29-12-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)LAXMI BUILDERS AND TRANSPORT COMPANY
Contractor AddressH-69, SECTOR 63 NOIDA-201301
Architect NameANUJ AGARWAL ARCHITECTS
Architect AddressA-244,KAUSHAMBI GHAZIABAD-201010
Architect Licence NumberCA/96/19503
Structural Engineer NameVD SHARMA
Structural Engineer AddressB-24, SECTOR 67,NOIDA-201301
Mobile number(Project Co-ordinator)9650498732

Land Details

AFS

Showing 2 blocks with 136 units

Property Summary

Total Carpet Area

19123.46 m²

205843.01 ft²

Total Units

370

1 different types

Blocks & Floors

2

19 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:51.69 m²
Balconies:368
Parking ratio:0.00 per unit

Block C

59 units

Block D

77 units

Khasra Details

Total Area

16800.00 m²

180833.52 ft²

2 plots
Khasra
TypeKhasra
Khasra/Plot No1180
Area(In Sq. Mt.)16790
Khasra
TypeKhasra
Khasra/Plot No1179
Area(In Sq. Mt.)10

Other Details

Contractor Name (if any)LAXMI BUILDERS AND TRANSPORT COMPANY
Contractor AddressH-69, SECTOR 63 NOIDA-201301
Architect NameANUJ AGARWAL ARCHITECTS
Architect AddressA-244,KAUSHAMBI GHAZIABAD-201010
Architect Licence NumberCA/96/19503
Structural Engineer NameVD SHARMA
Structural Engineer AddressB-24, SECTOR 67,NOIDA-201301
Mobile number(Project Co-ordinator)9650498732