NEWActive

SANCTUARY 105 PHASE-2

GURUGRAM, GURGAON
29-10-2024
Launch Date
NEW
Type
2031-12-31
Completion Date

Overview

Launch Date

29-10-2024

Completion Date

2031-12-31

RERA ID

RERA-GRG-1778-2024

Basic Details

Project NameSANCTUARY 105 PHASE-2
Project IDRERA-GRG-1778-2024
Project TypeNEW
Applicant TypeCompany
Submission Date29-10-2024 04:19:18 PM
Builder Name1000 TREES HOUSING PRIVATE LIMITED
CINU70100DL2010PTC210404
PANXXXX179R
Email1000trees.customercare@atsgreens.com
Websitehttp://www.atsgreens.com
Phone (Mobile)9643007884
Phone (Landline)01207111500
Registered AddressATS TOWER, PLOT NO. 16, SECTOR-135, NOIDA, GAUTAM BUDH NAGAR UP. 201305
Project AddressSECTOR 105, NEAR DAULATABAD FLYOVER, DWARKA EXPRESSWAY
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank Name'ICICI BANK LTD,K1, SENIOR MALL, SEC18, NOIDA, UTTAR PRADESH - 201301
Account Number777705231024
IFSC CodeICIC0000031
MICR Code110229005
Branch Code0031

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr Udaivir Anand,C 226 Sector 44 Noida Gautam Budh Nagar UP 201301
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)-

Development Details

Land Area4.894 (Acre)
Proposed FAR2.06
Permissible FAR40566.53
Total Licensed Land13.078 (Acre)

Land Usage

ANY OTHER0
SWIMMINGPOOLANDFACILITYAREA528.481
AREAUNDERBOUNDARY204.11
PRIVATEGARDENWITHGROUNDFLOORUNITS557.41
COMMUNIYBLOCK621.62
PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1574.7
CONSTRUCTION OF ROADS5455.77
PAVEMENTS349.27
PARKS AND PLAYGROUNDS9678.18
GREEN BELTS0
VEHICLE PARKINGS835.00
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
Total19804.541

Cost Details

Land Cost17090.15 Lakhs
Other Cost26412.00 Lakhs
Estimated Project Cost63788.02 Lakhs
Estimated Infrastructure Cost0 Lakhs
Estimated Apartment Construction Cost20285.87 Lakhs

Documents

LOI

Uploaded on: 29-10-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS PART-4

Uploaded on: 29-10-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS PART-7

Uploaded on: 29-10-2024

AAI

Uploaded on: 29-10-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS PART-5

Uploaded on: 29-10-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 29-10-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 29-10-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 29-10-2024

DEMARCATION PLAN

Uploaded on: 29-10-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 29-10-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 29-10-2024

ZONING PLAN

Uploaded on: 29-10-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 29-10-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 29-10-2024

BUILDING PLAN APPROVAL BR-III

Uploaded on: 29-10-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS PART-8

Uploaded on: 29-10-2024

LC-IV

Uploaded on: 29-10-2024

FOREST NOC

Uploaded on: 29-10-2024

EC

Uploaded on: 29-10-2024

SUPRIMPOSED DEMARCATION PLAN

Uploaded on: 29-10-2024

DRAFT ALLOMENT LETTER

Uploaded on: 29-10-2024

DRAFT AGREEMENT FOR SALE

Uploaded on: 29-10-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 17-06-2025

ELEVATIONS AND SECTIONS

Uploaded on: 17-06-2025

NO STATUTORY DUE- CA CERTIFICATE - SANCTUARY 105 PHASE-2

Uploaded on: 17-06-2025

WASTE DISPOSAL

Uploaded on: 17-06-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 17-06-2025

PHASING PLAN APPROVAL LETTER

Uploaded on: 17-06-2025

ROAD LAYOUT

Uploaded on: 17-06-2025

APPROVED SERVICE ESTIMATE PLAN SANCTION LETTER DT. 21.11.24

Uploaded on: 17-06-2025

STORM LAYOUT

Uploaded on: 17-06-2025

BANK UNDERTAKING SANCTUARY 105 PHASE-2-REVISED

Uploaded on: 17-06-2025

SWEAGE LAYOUT

Uploaded on: 17-06-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 17-06-2025

STREET LIGHTING LAYOUT

Uploaded on: 17-06-2025

SUMMARY OF VARIOUS COLLABORATION AGREEMENTS HIGHLIGHTING IMPORTANT CLAUSES OF THE AGREEMENTS

Uploaded on: 17-06-2025

SERVICE PLAN ESTIMATES CALCULATIONS

Uploaded on: 17-06-2025

PHASING PLAN

Uploaded on: 17-06-2025

WATER SUPPLY AND IRRIGATION LAYOUT

Uploaded on: 17-06-2025

Statutory Approvals

AAIDate: 13-06-2022Status: ALREADY BEEN OBTAINED
LICENSE-127 OF 2012Date: 27-12-2012Status: ALREADY BEEN OBTAINED
REVISED ZONINGDate: 24-11-2024Status: ALREADY BEEN OBTAINED
PHASING PLANDate: 12-07-2024Status: ALREADY BEEN OBTAINED
REVISED BUILDING PLANDate: 22-05-2024Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: No
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO TOWN & COUNTRY PLANNING
WATER SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
STORM WATER DRAINAGESUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
PLAYGROUNDS AND PARKSSUBMITTED TO TOWN & COUNTRY PLANNING
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO TOWN & COUNTRY PLANNING
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERSUBMITTED TO TOWN & COUNTRY PLANNING
OVER HEADS AND EQUIPMENTSSUBMITTED TO TOWN & COUNTRY PLANNING
EXTRA COSTSUBMITTED TO TOWN & COUNTRY PLANNING
STAFFSUBMITTED TO TOWN & COUNTRY PLANNING
SOLAR PANELSUBMITTED TO TOWN & COUNTRY PLANNING
BOUNDARY WALLSUBMITTED TO TOWN & COUNTRY PLANNING

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

MR RAJEEV GUPTA
Name
MR RAJEEV GUPTA
PAN
XXXX631N
Email
Rajeev.gupta@homekraft.in
Mobile
9810403257
Landline
01207111500
Address
So Janak Raj 785 Sector 43 Near DLFCourse Road Sikanderpur Ghosi 68 Gurgaon Haryana-122002

Managing Director/CEO

MR UDAIVIR ANAND
Name
MR UDAIVIR ANAND
PAN
XXXX379L
Email
Udaivir.Anand@atsgreens.com
Mobile
8929882792
Landline
01207111500
Address
C 226 Sector 44 Noida Gautam Budh Nagar UP 201301

Directors

MR TIKA SINGH RAWAT
Name
MR TIKA SINGH RAWAT
PAN
XXXX789E
Email
tika.singh@atsgreens.com
Mobile
9910490836
Landline
01207111500
Address
S-164A School Block 2nd Floor Shakarpur Delhi-110092
MR NAVEEN JOSHI
Name
MR NAVEEN JOSHI
PAN
XXXX807D
Email
naveenjoshiats@gmail.com
Mobile
9990079075
Landline
01207111500
Address
F-1708-A Tower-F Ace Platinum Zeta-1 Sakipur Greater Noida-201306
MR  ROHIT BAJAJ
Name
MR ROHIT BAJAJ
PAN
XXXX272A
Email
Rbajaj50@gmail.com
Mobile
8800498922
Landline
01207111500
Address
H. No 1120 Sector-29 Near Ramayan Park Faridabad-121008 Haryana
MR KULDEEP SHARMA
Name
MR KULDEEP SHARMA
PAN
XXXX739H
Email
Kuldhruv13@gmail.com
Mobile
9560200047
Landline
01207111500
Address
House No. 8 Main Kondli Market Delhi-110096
MR UDAIVIR ANAND
Name
MR UDAIVIR ANAND
PAN
XXXX379L
Email
Udaivir.Anand@atsgreens.com
Mobile
8929882792
Landline
01207111500
Address
C 226 Sector 44 Noida Gautam Budh Nagar UP- 201301

Contact Details

Project ContactEmail: 1000trees.customercare@atsgreens.comMobile: 9810403257Landline: 01207111500
Project Contact PersonName: MR RAJEEV GUPTAEmail: Rajeev.gupta@homekraft.inMobile: 9810403257Landline: 01207111500

Land Details

Land Area4.894 (Acre)
Proposed FAR2.06
Permissible FAR40566.53
Total Licensed Land13.078 (Acre)

Land Usage

Land Cost17090.15 Lakhs
Other Cost26412.00 Lakhs
Estimated Project Cost63788.02 Lakhs
Estimated Infrastructure Cost0 Lakhs
Estimated Apartment Construction Cost20285.87 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall4.25-6.25-
Clubhouse/community centres0000
Community Building----
Electricity Supply System0000
Extra Cost----
Lift----
Other0000
Over Heads and Equipments----
Parks and Playgrounds0000
Roads & Pavements0000
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Solar Panel----
Staff44444444
Storm Water Drainage0000
Water Supply System0000
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall--10.25-
Clubhouse/community centres65768740
Community Building----
Electricity Supply System10.2215.78.718.7
Extra Cost----
Lift----
Other0131313
Over Heads and Equipments---15.4
Parks and Playgrounds0000
Roads & Pavements0000
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Solar Panel----
Staff44444444
Storm Water Drainage00010.87
Water Supply System5.5311.014.0114.01
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall-21.25--
Clubhouse/community centres5555.5140120
Community Building----
Electricity Supply System7.73.721.764.7
Extra Cost----
Lift----
Other13131313
Over Heads and Equipments33.476.481.479.4
Parks and Playgrounds0000
Roads & Pavements0000
Security and fire fighting---26.49
Sewerage treatment & garbage disposal0000
Shopping area0000
Solar Panel----
Staff44444444
Storm Water Drainage0017.680
Water Supply System2.02017.0160.01
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall16.5---
Clubhouse/community centres1500110113
Community Building-190--
Electricity Supply System22.707.4510.7
Extra Cost-43.5451.5446.54
Lift-37.4652.2353.7
Other13131313
Over Heads and Equipments90.491.8780.8756.78
Parks and Playgrounds0025.1128.31
Roads & Pavements0009.26
Security and fire fighting-16.98--
Sewerage treatment & garbage disposal0000
Shopping area0000
Solar Panel----
Staff44444444
Storm Water Drainage04.100
Water Supply System18.010.8811.8813.35
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall----
Clubhouse/community centres1991105191
Community Building----
Electricity Supply System119.23107.23128.2364.23
Extra Cost71.5458.54-226.54
Lift162.23--150.23
Other13132.270
Over Heads and Equipments132.468.484.3340.87
Parks and Playgrounds22.8923.124.850
Roads & Pavements015.112.9312.93
Security and fire fighting65.5856.5872.8724.99
Sewerage treatment & garbage disposal0000
Shopping area0000
Solar Panel29-37.8-
Staff44444444
Storm Water Drainage0000.4
Water Supply System121.88109.88130.8866.88
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall----
Clubhouse/community centres47.5000
Community Building----
Electricity Supply System153.1366.7558.7576.75
Extra Cost57.03---
Lift-171.23--
Other0000
Over Heads and Equipments33.894751.97-
Parks and Playgrounds0000
Roads & Pavements0014.430
Security and fire fighting40.469.261.279.2
Sewerage treatment & garbage disposal0000
Shopping area0000
Solar Panel-33.37--
Staff44444444
Storm Water Drainage0000
Water Supply System82.9262.0154.0172.01
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall----
Clubhouse/community centres0000
Community Building----
Electricity Supply System78.7551.0400
Extra Cost----
Lift----
Other0000
Over Heads and Equipments----
Parks and Playgrounds0000
Roads & Pavements0000
Security and fire fighting81.251.25.26.95
Sewerage treatment & garbage disposal0000
Shopping area0000
Solar Panel----
Staff44444472.27
Storm Water Drainage0000
Water Supply System74.0144.0102.02

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSE"VITRIFIED TILES FLOORING IN LIVING, DINING & LOBBY, LAMINATED WOODEN/VITRIFIED TILES FLOORING IN BEDROOMS. TILES IN KITCHEN, CERAMIC TILE IN UTILITY/SERVANT ROOM AND TOILETS. BALCONIES WILL BE IN ANTI-SKID CERAMIC FLOORING"
WALL FINISHING DETAILSCERAMIC TILES UPTO DADO HEIGHT IN TOILETS & 600MMHEIGHT ABOVE KITCHEN COUNTER SLAB IN APPROPRIATECOLOUR & PAINT
KITCHEN DETAILSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE, ELECTRICAL POINTS FOR CHIMNEY, HOB, MICROWAVE & FRIDGE TO BE PROVIDED
BATHROOM FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
WOOD WORK ETCNA
DOORS AND WINDOS FRAMES"MAIN ENTRANCE DOOR FRAME –POLISHED/ENAMEL PAINTED ENGINEERED WOOD DOOR FRAME. ALL INTERNAL DOORS FRAME-LAMINATED/ENAMEL PAINTED ENGINEERED WOOD DOOR FRAME . EXTERNAL WINDOW FRAME OF UPVC SECTIONS,SIZE & SECTION AS PER THE DESIGN OF ARCHITECT"
GLASS WORKNA
ELECTRIC FITTINGS"PROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING AND MASTER BEDROOM. MOULDED MODULAR PLASTIC SWITCHES &PROTECTIVE MCB'S"
CONDUCTING AND WIRING DETAILSALL ELECTRICAL WIRING IN CONCEALED CONDUITS
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSLIFTS TO BE PROVIDED FOR ACCESS TO ALL HABITABLE FLOORS FROM COMMON LOBBY
EXTERNAL GLAZINGS-
WINDOWS/GLAZINGSWINDOW PANELS OF UPVC SECTIONS,SIZE AND SECTION AS PER DESIGN OF THE ARCHITECT
DOORS-
MAIN DOORSMAIN ENTRANCE DOOR –POLISHED/ENAMEL PAINTED ENGINEERED WOOD FLUSH DOOR ; STAINLESS STEEL/BRASS FINISHED HARDWARE FITTINGS FOR MAIN DOOR & ALUMINIUM POWDER COATED HARDWARE FITTING AND LOCKS OF BRANDED MAKES
INTERNAL DOORSENAMEL PAINTED/LAMINATED ENGINEERED WOOD FLUSH DOOR
AIR CONDITIONINGNA
ELECTRICAL FITTINGS"PROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING AND MASTER BEDROOM. MOULDED MODULAR PLASTIC SWITCHES &PROTECTIVE MCB'S"
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEAPPROPRIATE FINISH OF TEXTURE PAINT OF EXTERIOR GRADE WATER PROOF PAINT
INTERNAL FINISHINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS & CEILINGS

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES UPTO DADO HEIGHT
CEILINGPLASTER WITH OBD
COUNTERSNA
SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
FIXTURESNA
KITCHEN
FLOORVITRIFIED TILES
WALLSCERAMIC TILES 600MM HEIGHT ABOVE KITCHEN COUNTERSLAB IN APPROPRIATE COLOUR & PAINT
CEILINGPLASTER WITH OBD
COUNTERSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLESTONE
FIXTURESNA
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILES
WALLSPLASTER WITH OBD
CEILINGPLASTER WITH OBD
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES UPTO DADO HEIGHT
CEILINGPLASTER WITH OBD
COUNTERSNA
SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING/VITRIFIED TILES
WALLSPLASTER WITH OBD
CEILINGPLASTER WITH OBD
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSPLASTER WITH OBD
CEILINGPLASTER WITH OBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCERAMIC TILES IN UTILITY/SERVANT ROOM
WALLS & CEILINGPLASTER WITH OBD
TOILETCERAMIC TILES OF REQUIRED HEIGHT IN TOILETS & CERAMIC TILES IN TOILETS FOR FLOORING
BALCONYBALCONIES WILL BE IN ANTI SKID CERAMIC FLOORING

Fee Details

Payment 1
amount:407665
cheque no:587794
draft date:25-10-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:91239
cheque no:588163
draft date:18-12-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 3
amount:839791
cheque no:587793
draft date:25-10-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK