NewActive

Saidham Sona Apartments Phase II

Prayagraj, Uttar Pradesh
01-10-2025
Launch Date
New
Type
31-12-2029
Completion Date

Overview

Launch Date

01-10-2025

Completion Date

31-12-2029

RERA ID

UPRERAPRJ891416/09/2025

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)461
Project NameSaidham Sona Apartments Phase II
Registration Fee (in Rs.)4610
AddressSite no. 26/A, Sarojni Naidu Marg, Mauza- Naseerpur Bakhtiyara, Paragna & Tehsil- Sadar, Distt- Prayagraj
Village/Locality/Sector etc.Naseerpur Bakhtiyara
StateUttar Pradesh
Project Duration (In month)51
DistrictPrayagraj
Original Start Date-
TehsilAllahabad **
Proposed Start Date01-10-2025
Sanctioning Competent AuthorityPrayagraj(Allahabad) Development Authority
Project Cost (in Lacs)3225
Proposed Completion Date31-12-2029

Location

Latitude

25.2755

Longitude

81.4941

Bank Details

Account Details
Name of the AccountSAI DHAM APPARTMENTS COLLECTION ACCOUNT SAIDHAM SONA APARTMENT PHASE II
Account Number120035314428
Bank NameCanara Bank
Branch NameAllahabad, Civil Lines
Branch Address16, M.G. Marg, Civil Lines, Prayagraj, 211001
Branch StateUttar Pradesh
Branch DistrictPrayagraj
IFSC CodeCNRB0000627
Branch Email Addresscb0627@canarabank.com
Separate Account Details
Name of the AccountSAI DHAM APPARTMENTS SEPARATE ACCOUNT SAIDHAM SONA APARTMENT PHASE II
Account Number120035325682
Bank NameCanara Bank
Branch NameAllahabad, Civil Lines
Branch Address16, M.G. Marg, Civil Lines, Prayagraj, 211001
Branch StateUttar Pradesh
Branch DistrictPrayagraj
IFSC CodeCNRB0000627
Transaction Account Details
Name of the AccountSAI DHAM APPARTMENTS TRANSACTION ACCOUNT SAIDHAM SONA APARTMENT PHASE II
Account Number120035230280
Bank NameCanara Bank
Branch NameAllahabad, Civil Lines
Branch Address16, M.G. Marg, Civil Lines, Prayagraj, 211001
Branch StateUttar Pradesh
Branch DistrictPrayagraj
IFSC CodeCNRB0000627

Development Works

Demarcation of Plots

Demarcation of plot has been already completed.

Boundary Wall

Boundary wall work has already been completed.

Road Work

From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 6 mtr.

Footpaths

We would not provide any footpath

Water Supply Including Drinking Water Facilities

We will provide overhead water tank which will supply water to all flats 24 hours. To fill those watertanks one no. of boring done and direct pipe line supply will be installed.

Sewer System

All Sewerage water shall be connect with the Municipal sewerage system when come into force.

Drain

Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

We will provide green area with the different physical activities and the green area will have gaming facilities for kids, yoga and physical exercise area for adult.

Tree Planting

We will provide many type of trees all along the boundary wall & green area

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.

Community Buildings

N/A

Treatment and Disposal System of Sewage and Sullage water

All Sewerage water shall be connect with the Municipal sewerage system when come into force.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

We will contruct RWH tank to refiil ground water and suggest to all indivdual to clean RWH tank to insure refilling of ground water properly.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use led lights in his flats to safe energy and reduce consumption of electricity.

Fire Protection And Fire Safety System

This Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

We will have staircases which don’t have any doors to clear emergency exit for 24 hours.

Other Miscellaneous Work

NA

Documents

Registry Document

No: 2248 | Date: 13-04-2023

Extract of Khatauni

No: Ali and Nahid Death Certificates and Family Certificate | Date: -

Extract of Khatauni

No: Power of Attorney Farhat naqvi | Date: -

Extract of Khatauni

No: Power of Attorney Nikhat zahra naqvi | Date: -

Sale Deed

No: 12972 | Date: 16-12-2004

Extract of Khatauni

No: Decision order of Petition No. 1557-59/98 | Date: -

Extract of Khatauni

No: Reply to Objection Letter | Date: -

Extract of Khatauni

No: Affidavit for Co-promoter-Farhat Zehra Naqvi | Date: -

Extract of Khatauni

No: Affidavit for Co-promoter-Nikhat Zehra Naqvi | Date: -

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 05-08-2025

Commencement Certificate

Uploaded: 05-08-2025

Proforma of Application Form

Uploaded: 08-08-2025

Proforma of Allotment Letter

Uploaded: 08-08-2025

Proforma of Conveyance Deed

Uploaded: 08-08-2025

Waste Disposal Plan

Uploaded: 28-08-2025

Water Supply Plan

Uploaded: 28-08-2025

Electricity Supply Plan

Uploaded: 28-08-2025

Development Work Plan

Uploaded: 28-08-2025

Affidavit

Uploaded: 05-08-2025

CA CERTIFICATE

Uploaded: 28-08-2025

ARCHITECT CERTIFICATE

Uploaded: 28-08-2025

ENGINEERS CERTIFICATE

Uploaded: 29-08-2025

Other

Uploaded: 05-08-2025

Proforma of Agreement for Sale

Uploaded: 08-08-2025

Permits

Orignal Permit NoAffordable Housing/01892/PDA/BP/22-23/0354/01122022
Orignal Permit Date21-05-2025
Valid Upto20-05-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto20-05-2033
End Date31-12-2029
Uploaded Approve LayoutNot Specified
Uploaded Sanctioned LetterNot Specified
Uploaded Approved MapNot Specified
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsNot Specified
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Sai Dham Appartments
Contractor Address12/16, Shiv Ram Das Gulati Marg, Prayagraj, U.P. 211001
Architect NameShivarpit Katoch
Architect AddressS-6, Second Floor, Ashirwad Complex, Block No F, Secor 53, Noida Ut Pradesh - 201301
Architect Licence NumberCAA/1999/25542
Structural Engineer NameVijay Garg
Structural Engineer AddressNutec Infrastructure Pvt Ltd581/4 Main Road, Chirag Complex Dehi- New Delhi- 110017
Mobile number(Project Co-ordinator)9415218553

Land Details

AFS

Showing 1 blocks with 40 units

Property Summary

Total Carpet Area

2974.51

32017.33 ft²

Total Units

40

2 different types

Blocks & Floors

1

8 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:74.36
Balconies:103
Parking ratio:0.00 per unit

Block A

40 units

Khasra Details

Total Area

461.00

4962.16 ft²

1 plot
Plot
TypePlot
Khasra/Plot No26-A
Area(In Sq. Mt.)461

Other Details

Contractor Name (if any)Sai Dham Appartments
Contractor Address12/16, Shiv Ram Das Gulati Marg, Prayagraj, U.P. 211001
Architect NameShivarpit Katoch
Architect AddressS-6, Second Floor, Ashirwad Complex, Block No F, Secor 53, Noida Ut Pradesh - 201301
Architect Licence NumberCAA/1999/25542
Structural Engineer NameVijay Garg
Structural Engineer AddressNutec Infrastructure Pvt Ltd581/4 Main Road, Chirag Complex Dehi- New Delhi- 110017
Mobile number(Project Co-ordinator)9415218553