NewActive

S S Point

Aligarh, Uttar Pradesh
15-12-2022
Launch Date
New
Type
02-11-2027
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

02-11-2027

RERA ID

UPRERAPRJ591602

Location

Latitude

27.889704

Longitude

78.079361

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)7671.49
Project NameS S Point
Registration Fee (in Rs.)45000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)59
DistrictAligarh
Original Start Date-
TehsilKoil
Proposed Start Date15-12-2022
Sanctioning Competent AuthorityAligarh Development Authority
Project Cost (in Lacs)4456
Proposed Completion Date02-11-2027

Bank Details

Account Details
Name of the AccountSeven heaven constructions Pvt Ltd Collection account for SS Point
Account Number203110100002168
Bank NameBombay mercantile co operative Bank LTD
Branch NameDodhpur Aligarh Branch
Branch AddressW34p +9hfBMC bank, Dodhpur Aligarh
Branch StateUttar Pradesh
Branch DistrictAligarh
IFSC CodeBMCBO000047
Separate Account Details
Name of the AccountSeven heaven constructions Pvt Ltd Separate account for SS Point
Account Number203110100002167
Bank NameBombay mercantile co operative Bank LTD
Branch NameDodhpur Aligarh Branch
Branch AddressW34p +9hf BMC bank, Dodhpur Aligarh
Branch StateUttar Pradesh
Branch DistrictAligarh
IFSC CodeBMCBO000047
Transaction Account Details
Name of the AccountSeven heaven constructions Pvt Ltd Rera transaction account for S S Point
Account Number203110100002161
Bank NameBombay mercantile cooperative Bank LTD
Branch NameDodhpur Aligarh Branch
Branch AddressW34p +9hf BMC bank, Dodhpur Aligarh
Branch StateUttar Pradesh
Branch DistrictAligarh
IFSC CodeBMCBO000047

Development Works

Demarcation of Plots

We have one plot of size 7985.56 Sq. Mtr. having 1 main entrance gate from 12m wide front road.

Boundary Wall

2m high and 230 mm thick brick work and rcc work in column and beam. At the centre face of the boundary wall there would be a logo of the project which would give a beautiful iconic design to the boundary wall.

Road Work

From the main entrance gate we have 80mm thick interlocking brick/ RCC road throughout the project, whose wideness starts from 8 mtr.

Footpaths

We will not provide any footpath

Water Supply Including Drinking Water Facilities

We will provide Six Nos. of pump for the requirement of blocks through underground pipelines.

Sewer System

Modular Sewer System shall be provided. All sewerage shall go to the STP and overflow from the STP shall connect with municipal sewerage system, when comes into force.

Drain

Storm water shall be provided. Storm water from roads and other landscape area shall be connect to the Storm water drain channel and go to the rain water harvesting pit for recharge the ground water and overflow shall be connect with the municipal drain line.

Parks

We will provide green area with different activities and the green area will have gaming facilities for kids

Tree Planting

We will provide many types of trees all along the boundary wall and green area

Design For Electric Supply Including Street Lighting

we will design and implement the system as per local electricity board and will consider centralized transformer, HT pane, LT panel, feeder pillar and DG back for common service like external lighting, fountain, STP, Pump Room etc.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Modular sewerage system shall be provided. All sewerage water shall go to the STP and overflow from the STP shall be connect with the Municipal Sewerage system which comes into force.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

We will suggest to individual to use low flow fixtures as well as dual flush cistern and raw water harvesting system to reduce water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.

Fire Protection And Fire Safety System

We will provide fire fighting facilities in common areas, while individual owners can install their own system as per their local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

We have proposed common pump room. All sewerage shall go to the STP. Road Sand other areas shall be connect to the storm water drain channel and go to the rain water.

Other Miscellaneous Work

NA

Documents

Extract of Khatauni

No: Electrical Plan | Date: -

Extract of Khatauni

No: Plumbing Plan | Date: -

Extract of Khatauni

No: Site Development Plan | Date: -

Extract of Khatauni

No: Waste Disposal Plan | Date: -

Extract of Khatauni

No: Water Supply Plan | Date: -

Extract of Khatauni

No: Nagar Nigam NOC in lieu of Khatoni copy | Date: -

Extract of Khatauni

No: NOC from Tehsil in lieu of Khatoni Copy | Date: -

Extract of Khatauni

No: Reply to the objection letter | Date: -

Sale Deed

No: 6443 | Date: 14-07-2008

Sale Deed

No: 6932 | Date: 24-07-2008

Sale Deed

No: 7077 | Date: 26-07-2008

Registry Document

No: 623 | Date: 08-03-1956

Registry Document

No: 619 | Date: 08-03-1956

Registry Document

No: 931 | Date: 20-04-1956

Registry Document

No: 2291 | Date: 05-10-1956

Registry Document

No: 1452 | Date: 05-06-1958

Registry Document

No: 2 | Date: 26-12-1968

Registry Document

No: 3195 | Date: 14-02-2007

Registry Document

No: 710 | Date: 02-01-2008

Registry Document

No: 1416 | Date: 10-05-1976

Details of Encumbrances

Uploaded: 26-04-2023

Commencement Certificate

Uploaded: 07-04-2023

Other Plan(If Any)

Uploaded: 26-04-2023

Proforma of Application Form

Uploaded: 07-04-2023

Proforma of Allotment Letter

Uploaded: 07-04-2023

Proforma of Conveyance Deed

Uploaded: 26-04-2023

Waste Disposal Plan

Uploaded: 26-04-2023

Water Supply Plan

Uploaded: 26-04-2023

Electricity Supply Plan

Uploaded: 26-04-2023

Development Work Plan

Uploaded: 26-04-2023

Affidavit

Uploaded: 07-04-2023

CA CERTIFICATE

Uploaded: 26-04-2023

ARCHITECT CERTIFICATE

Uploaded: 26-04-2023

ENGINEERS CERTIFICATE

Uploaded: 26-04-2023

Other

Uploaded: 26-04-2023

Permits

Orignal Permit NoGroup Housing/01256/AGDA/BP/21-22/0338/19072022
Orignal Permit Date02-12-2022
Valid Upto01-12-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto01-12-2030
End Date02-11-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)NVS REALTORS PVT LTD
Contractor Address3/169 Janakpuri,Marris Road, Aligarh
Architect NameKrishna Gopal
Architect AddressJ- 76, Janakpuri, Aligarh
Architect Licence NumberAM1816228/20022019
Structural Engineer NameAshraf Ali
Structural Engineer AddressMedical Road, Aligarh
Mobile number(Project Co-ordinator)9595645625

Land Details

AFS

Showing 1 blocks with 135 units

Property Summary

Total Carpet Area

13880.20 m²

149405.08 ft²

Total Units

173

2 different types

Blocks & Floors

1

8 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:80.23 m²
Balconies:57
Parking ratio:0.00 per unit

Block G

135 units

Khasra Details

Total Area

7985.58 m²

85955.98 ft²

1 plot
Plot
TypePlot
Khasra/Plot No1,2,3,4,5,6
Area(In Sq. Mt.)7985.58

Other Details

Contractor Name (if any)NVS REALTORS PVT LTD
Contractor Address3/169 Janakpuri,Marris Road, Aligarh
Architect NameKrishna Gopal
Architect AddressJ- 76, Janakpuri, Aligarh
Architect Licence NumberAM1816228/20022019
Structural Engineer NameAshraf Ali
Structural Engineer AddressMedical Road, Aligarh
Mobile number(Project Co-ordinator)9595645625