ONGOINGActive

PRESIDIA

GURUGRAM, WAZIRABAD ST
31-12-2019
Launch Date
ONGOING
Type
2019-12-30
Completion Date

Overview

Launch Date

31-12-2019

Completion Date

2019-12-30

RERA ID

RERA-GRG-419-2019

Basic Details

Project NamePRESIDIA
Project IDRERA-GRG-419-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date31-12-2019 11:01:08 AM
Builder NamePIONEER URBAN LAND AND INFRASTRUCTURE LTD
CINU65910DL1985PLC19985
PANXXXX576B
Emailmjaju@pioneerurban.in
Websitehttp://www.pioneerurban.in
Phone (Mobile)9811202287
Phone (Landline)01244322300
Registered AddressPIONEER SQUARE SECTOR 62
Project AddressGROUP HOUSING COLONY, SECTOR-62, GURUGRAM HARYANA
DistrictGURUGRAM
TehsilWAZIRABAD ST

Bank Details

Bank NameHDFC BANK, FIRST INDIA PLACE, GURUGRAM
Account Number57500000065312
IFSC CodeHDFC0000280
MICR Code110240037
Branch Code0280

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Manish Perimal, Mr. Sumit Agarwalla
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area4.40 (Acre)
Proposed FAR175
Permissible FAR175
Total Licensed Land35 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.49
CONSTRUCTION OF ROADS0.89
PAVEMENTS0.75
PARKS AND PLAYGROUNDS2.08
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.19
Total4.4

Cost Details

Land Cost1370.50 Lakhs
Other Cost2048.33 Lakhs
Estimated Project Cost18352.31 Lakhs
Estimated Infrastructure Cost3504.82 Lakhs
Estimated Apartment Construction Cost11425.35 Lakhs

Documents

LC-IV

Uploaded on: 14-02-2020

BP 2

Uploaded on: 14-02-2020

OC PRESIDIA TOWER D

Uploaded on: 14-02-2020

DEMARCATION PLAN

Uploaded on: 14-02-2020

BR III

Uploaded on: 14-02-2020

OC PRESIDIA TOWER - C

Uploaded on: 14-02-2020

BP 1

Uploaded on: 14-02-2020

FOREST NOC

Uploaded on: 14-02-2020

SERVICE PLAN PRESIDIA

Uploaded on: 14-02-2020

LOI

Uploaded on: 14-02-2020

SITE PLAN

Uploaded on: 14-02-2020

EC ORDER - PIONEER

Uploaded on: 14-02-2020

SERVICE PLAN LETTER

Uploaded on: 14-02-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 14-02-2020

AAI NOC

Uploaded on: 14-02-2020

BR FOR RERA ACCOUNT

Uploaded on: 14-02-2020

EIA GH SECTOR

Uploaded on: 14-02-2020

OC PRESIDIA TOWER B PRESIDIA

Uploaded on: 14-02-2020

PRESIDIA REVALIDATION BR III

Uploaded on: 14-02-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 28-11-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 04-12-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 04-12-2019

COPY OF BALANCE SHEET OF LAST THREE YEAR

Uploaded on: 05-12-2019

COPY OF BALANCE SHEET OF LAST THREE YEAR

Uploaded on: 05-12-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 04-12-2019

SAMPLE ALLOTMENT LETTER

Uploaded on: 05-12-2019

ZONING PLAN

Uploaded on: 04-12-2019

COPY OF BALANCE SHEET OF LAST THREE YEAR

Uploaded on: 05-12-2019

DRAFT AGREEMENT

Uploaded on: 05-12-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 04-12-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 04-12-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 04-12-2019

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 31-12-2019

TIR PRESIDIA-PIONEER

Uploaded on: 14-02-2020

OC PRESIDIA TOWER-E

Uploaded on: 14-02-2020

BP 3

Uploaded on: 14-02-2020

NOC FIRE PRESIDIA

Uploaded on: 14-02-2020

SERVICE ESTIMATE PRESIDIA 1

Uploaded on: 14-02-2020

OC PRESIDIA TOWER A & EWS

Uploaded on: 14-02-2020

Statutory Approvals

STATUTORY APPROVALSDate: NAStatus: ALREADY BEEN OBTAINED
LICENSEDate: 03-12-2007Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 25-06-2015Status: ALREADY BEEN OBTAINED
APPROVAL OF BUILDING PLANDate: 09-02-2011Status: ALREADY BEEN OBTAINED
WATER CONNECTIONDate: 23-01-2018Status: ALREADY BEEN OBTAINED
FIRE FIGHTING SCHEMEDate: 13-12-2013Status: ALREADY BEEN OBTAINED
ENVIRONMENTAL CLEARANCEDate: 04-06-2008Status: ALREADY BEEN OBTAINED
NOC FOR POLLUTIONDate: 21-08-2019Status: ALREADY BEEN OBTAINED
HEIGHT CLEARANCE BY AAIDate: 15-10-2012Status: ALREADY BEEN OBTAINED
NOC FROM FORESTDate: 19-08-2011Status: ALREADY BEEN OBTAINED
RAIN WATER HARVESTINGDate: 01-01-2016Status: ALREADY BEEN OBTAINED
SEWER CONNECTIONDate: 16-01-2018Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERAS PER PROJECT REPORT

NOC

ROADSProvider: HSVPApproval Status: Approved
WATER SUPPLYProvider: HSVPApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HSVPApproval Status: Approved
STORM WATER DRAINAGEProvider: HSVPApproval Status: Approved

Project Team

Authorized Representative

MANIT JAJU
Name
MANIT JAJU
PAN
XXXX035M
Email
mjaju@pioneerurban.in
Mobile
9811202287
Landline
0124322300
Address
204 Deerwood Nirvana Country Gurgraon 122018

Managing Director/CEO

MANISH PRERIWAL
Name
MANISH PRERIWAL
PAN
XXXX883K
Email
mperiwal@pioneerurban.in
Mobile
9810207885
Landline
01244322300
Address
Anurag 9 New Road Kolkatta 700027 West Bengal

Directors

MEENAKSHI PERIWAL
Name
MEENAKSHI PERIWAL
PAN
XXXX328B
Email
mperiwal@pioneerurban.in
Mobile
9810207885
Landline
0124322300
Address
Anurag 9 New Road Kolkata 70027 West Bengal
ASHISH PERIWAL
Name
ASHISH PERIWAL
PAN
XXXX490J
Email
aperiwal@pioneerurban.in
Mobile
9811202287
Landline
0124322300
Address
Aurag 9 New Road Kolkata -700027
PRASHAT BABULAL PACHISIA
Name
PRASHAT BABULAL PACHISIA
PAN
XXXX475B
Email
mjaju@pioneerurban.in
Mobile
9811202287
Landline
01244322300
Address
1703 Rushab Tower Jakaria Bunder Cross Road Sewri W Mumbai-400015
SANJAY KUMAR MUNDHRA
Name
SANJAY KUMAR MUNDHRA
PAN
XXXX876N
Email
mjaju@pioneerurban.in
Mobile
9811202287
Landline
01244322300
Address
Mundhra House European Quarters Chaibasa West Singhbhum Chaibasa Jharkhand-833201

Contact Details

Project ContactEmail: mjaju@pioneerurban.inMobile: 8130653232Landline: 01244322300
Project Contact PersonName: RAKESH BOHRAEmail: rbohra@pineerurban.inMobile: 8130653232Landline: 01244322300

Land Details

Land Area4.40 (Acre)
Proposed FAR175
Permissible FAR175
Total Licensed Land35 (Acre)

Land Usage

Land Cost1370.50 Lakhs
Other Cost2048.33 Lakhs
Estimated Project Cost18352.31 Lakhs
Estimated Infrastructure Cost3504.82 Lakhs
Estimated Apartment Construction Cost11425.35 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other2048.33
Shopping area29.02
Roads & Pavements169.29
Water Supply System536.38
Storm Water Drainage0
Parks and Playgrounds16.67
Electricity Supply System598.47
Clubhouse/community centres0
Sewerage treatment & garbage disposal16.28

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE
WALL FINISHING DETAILSTEXTURED PAINT
KITCHEN DETAILSSTONE SLAB
BATHROOM FITTINGSPREMIUM CP FITTINGS + SANTARYWARE WALL TILES, FLOOR TILES
WOOD WORK ETCHARDWOOD DOOR FRAMES AND PANELLED SKIN DOORS
DOORS AND WINDOS FRAMESTIMBER, PANELLED SKIN DOORS AND ALUMINIUM
GLASS WORKTOUGHENED GLASS
ELECTRIC FITTINGSSWITCHES, WIRE, PANELS, GENSET
CONDUCTING AND WIRING DETAILSPVC CONDUITS COPPER WIRE
CUPBOARD DETAILSNA
WATER STORAGEOT TANK
LIFT DETAILSTHYSSENKRUP
EXTERNAL GLAZINGSGLAZED ALUMINIUM DOORS AND WINDOWS
WINDOWS/GLAZINGSGLASS
DOORSPANELLED SKIN DOORS
MAIN DOORSVENEERED
INTERNAL DOORSPANELLED SKIN DOORS
AIR CONDITIONINGSAMSUNG VRV
ELECTRICAL FITTINGSSWITCHES
CNG PIPE LINELPG
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT
INTERNAL FINISHINGACRYLIC WALL PAINT

Unit-wise Specifications

TOILET
FLOORTILES
WALLSTILES
CEILINGOBD
COUNTERSNA
SANITARY WARE/CP FITTINGSCP FITTINGS, PREMIUM SANITARY-WARE
FIXTURESNA
KITCHEN
FLOORTILES
WALLSTILES
CEILINGOBD
COUNTERSNA
FIXTURESCP FITTINGS
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORTILES
WALLS & CEILINGTEXTURE PAINT
RAILINGSSS RAILINGS WITH GLASS
FIXTURESNA
BED ROOMS
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC PAINT
CEILINGOBD
WARDROBESNA
MASTER TOILET
FLOORTILES
WALLSTILES
CEILINGOBD
COUNTERSNA
SANITARY WARE/CP FITTINGSCP FITTINGS, PREMIUM SANITARY-WARE
FITTING/FIXTURESPREMIUM SANITARY-WARE
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC PAINT
CEILINGOBD
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORIMPORTED MARBLE
WALLSACRYLIC PAINT
CEILINGOBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES
WALLS & CEILINGACRYLIC PAINT
TOILETTILES
BALCONYTILES + RALINGS

Fee Details

Payment 1
amount:341270
cheque no:56904
draft date:27-07-2017
payable to:HRERA Gurugram
payee bank:HDFC