Have queries on this Project?
28.3631275
77.433175
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
25293.28 m²
272254.34 ft²
Designated plots is demarcated as per lease plan issued by the Authority.
Bricked wall with RCC columns as per approved layout plan.
As per layout plan the construction of roads shall be in the form of- 1. Construction of GSB by providing well coarse graded material of spreading in uniform layers as per technical No. of MORTH. 2. Laying of CC. 3. Vacuum dewatering.
Footpath will be provided as per the layout plan.
Water shall be provided by Authority and internal distribution shall be done by developer.
STP will be provided/shared for sewerage as per approved plan of Crossing Republik.
Separate drainage line will be used as per the design requirement by laying of RCC hume pipe/PVC pipe of 600 MM Dia.
Landscape area should be provided as per local building bye laws.
Tree plantation should be done as per approved building plan.
Electric supply including street light should be done as per the approved building plan by laying of Under ground conduit pipe. Street lighting should be provided as per plan.
Community building will construct as per approved plan.
Treated water shall be used for irrigation and flushing system.
Water shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed by Authorised vendor.
Low flow water fixtures will be used for water conservation and adequate number of recharge pit shall be used.
Energy Management system including use of Renewable energy will apply as per approved plan.
Fire protection an Fire alarm system shall be installed as per NBC norms.
Social infrastructure and other public amenities including public health services shall be provided as per local building bye laws.
Emergency evacuation services shall be provided as per Environment Management plan and Disaster Management plan.
Other Miscellaneous work should be done as per approved building plan.
Park Drive is located in Ghaziabad.
Yes. Park Drive is registered under UPRERAPRJ904610 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Park Drive is 30 June 2023.
Park Drive is developed by POLWELL REAL ESTATES PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.