DEMARCATION OF PLOT WILL BE DONE BY USING TOTAL STATION SURVEYING EQUIPMENT AND WE WILL MAKE BRICK PILLER IN THE CORNER OF THE BLOCKS
BOUNDARY WALL WILL BE DONE IN 9 INCH BRICK WORK HAVING 5 FEET HEIGHT FROM ROAD LEVEL AND HAVING RCC PILLERS AT A DISTANCE OF 15 FEET
RCC ROAD OF 9 INCH THICKNESS WILL BE CONSTRUCTED HAVING DOUBLE STEEL MESHING IN IT HAVING 8 MM AND 10 MM STEEL IN IT IN 6 INCHES GAP
INTERLOCK TILES OF 36 MM THICKNESS WILL BE USED.BEFORE LAYING INTERLOCK TILES A BED OF PCC WILL BE MADE HAVING 4 INCHES THICKNESS
PVC PIPES OF 4 INCH AND 5 INCH DIAMETER WILL BE USED HAVING CLOSING VALVE SYSTEM.THE WATER LINES WILL BE CONNECTED TO ALREADY CONSTRUCTED OVER HEAD TANK IN PARAS ENCLAVE.
PIPES OF 8 INCH,10 INCH WILL BE USED AND RCC MAINHOLE WILL BE CONSTRUCTED.THE SEWER LINES WILL BE CONNECTED TO ALREADY CONSTRUCTED STP IN PARAS ENCLAVE.
RAIN WATER HARVESTING PIT WILL BE CONSTRUCTED.THE LINES OF PVC HAVING 6 INCH DIAMETER WILL BE LAID
HORTICULTURE AND LANDSCAPING WILL BE DONE
PALM TREE WILL BE PLANT AT ROAD SIDE AT A DISTANCE OF 25 FEET APPROX
MS POLES WILL BE USED HAVING ABC CONDUCTOR AND 1 TRANSFORMER
NOT APPLICABLE
ALL THE STP WATER WILL BE CONNECTED TO THE PREVIOUS PROJECT PARAS ENCLAVE IN WHICH A SEWARAGE TREATMENT PLANT IS ALREADY FUNCTIONAL
NOT APPLICABLE
RAIN WATER HARVESTING WILL BE DONE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
18503.15 m²
199166.06 ft²