Launch Date
Completion Date
RERA ID
28.696958
77.430952
As per approved layout excluding the zonal green, LMC land & Land for chak road and nali.
Boundary wall in brick/ masonry/ RCC will be provided.
Trimix / Interlocking Tiles
Side Pathways Designed along the internal roads
To be provided by the GDA or Groundwater subject to approval from concerned authority & storage will be done in under ground water tank
Underground sewer line as per approved drawings
Under pipe drain with chamber
Will be develop as per sanction drawing
Tree planting as per approved plan.
The design has been done as per UP electricity board guidelines.
Community area in D block
Sewage will be treated in the STP (Sewage Treatment Plant) and treated water will be reused and balance will be discharged in the municipal sewer.
Door to door collection and will be disposed up to garbage point of authority
Rainwater harvesting system will be developed as per sanction drawing.
As per GDA norms.
System will be provided as per the provisional Fire NOC
Primary school provision is there
As per guidelines and building by-laws
N.A.
Showing 6 blocks with 322 units
Total Carpet Area
44486.18 m²
478844.79 ft²
Total Units
1310
6 different types
Blocks & Floors
6
25 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
23466.00 m²
252585.68 ft²