Ozone City Phase-7 The Golden Estate

Aligarh, Uttar Pradesh
20-12-2022
Launch Date
New
Type
14-12-2027
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

14-12-2027

RERA ID

UPRERAPRJ510771

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)31299
Project NameOzone City Phase-7 The Golden Estate
Registration Fee (in Rs.)161500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)60
DistrictAligarh
Original Start Date-
TehsilKoil
Proposed Start Date20-12-2022
Sanctioning Competent AuthorityAligarh Development Authority
Project Cost (in Lacs)1323
Proposed Completion Date14-12-2027

Location

Latitude

27.880265

Longitude

78.127108

Bank Details

Account Details
Name of the AccountOzone Builders and Developers Pvt. Ltd.- Collection Account for Ozone City Phase-7 The Golden Estate
Account Number2252000100172501
Bank NameKarnataka Bank Limited
Branch NameNOIDA
Branch AddressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeKARB0000545
Separate Account Details
Name of the AccountOzone Builders and Developers Pvt. Ltd.- Separate Bank Account for Ozone City Phase-7 The Golden Estate
Account Number2252000100172401
Bank NameKarnataka Bank Limited
Branch NameNOIDA
Branch AddressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeKARB0000545
Transaction Account Details
Name of the AccountOzone Builders and Developers Pvt. Ltd.- RERA Transaction Account for Ozone City Phase-7 The Golden Estate
Account Number2252000100172301
Bank NameKarnataka Bank Limited
Branch NameNOIDA
Branch AddressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeKARB0000545

Development Works

Demarcation of Plots

The Project land is demarcated as follows- by North- Phase-5th map no.-43/15(2012-13), by south- submitted online map for approval map no.- AGDA/LD/20-21/0732, by East Phase-2, map no.- 731/15 (2008-09), by west another land, khasra no.-48, and the individual plots are demarcated by the construction of demarcation with Piller nos. and with brickwork.

Boundary Wall

3.0 Metre high boundary wall with brickwork and one side plaster R.C.C Columns approx. 4.5 to 5.0 meters from center to center. The boundary wall shall be earthquake-resistant.

Road Work

All roads in the complex will be in combination with RCC and concrete pavers of different colors, shapes, and thicknesses. Roads will be laid over 225 mm water-bound macadam.

Footpaths

All footpaths in the complex will be in combination with concrete pavers of different colors, shapes, and thicknesses of 65 mm and 80 mm laid over a 150 mm water-bound macadam surface.

Water Supply Including Drinking Water Facilities

Drinking water supply is to be provided through the existing overhead tank to the plots and treated water will be supplied from STP for irrigation. The drinking water source is from existing tube wells. A water filtration plant is installed before the overhead tank.

Sewer System

The sewage will be collected through RCC/ Soil pipeline arrangement, bends, and inspection chambers leading to the sewage water treatment plant (STP) of the project, from where the sewage will be used for irrigation. Inspection chambers shall be of 900 mm dia and the main pipeline of 400 mm dia shall be used.

Drain

Rain water shall be collected in drains having minimum width of 150mm connected to the underground cement concrete pipeline. For discharge, water will be collected in manholes to be constructed in the periphery of the complex and these manholes shall be finally connected with the drain of harvesting pits and overflow to jaffri drain. Inspection chambers shall be of 900 mm dia and the main pipeline of 300 mm dia shall be used.

Parks

A lush green internal park will be provided and maintained. The parks will have jogging tracks, a pavilion, childrens play areas and sitting areas. The total park area in the project will be 4877.72 sq. mtr.

Tree Planting

The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora, and vegetation shall be as pe the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage of the project. The 76 no. of trees shall be planted in the entire project area.

Design For Electric Supply Including Street Lighting

Electric supply is provided through 33/0.415 KV transformers installed in adjoining land owned by the promoter. External street lighting shall be through grid power.

Community Buildings

Not Applicable

Treatment and Disposal System of Sewage and Sullage water

Sewage shall be treated in a sewage treatment plant (STP) installed in the adjacent land owned by the promoter and thereafter treated water to be used for irrigation purposes.

Solid Waste Management And Disposal System

Solid waste is to be collected from individual plots and stored in the garbage room. The professional service provider shall be engaged for the disposal of solid waste outside the project premises.

Water Conservation System

Rainwater harvesting pits of 13 nos. and size 1.50 mtr. diameter each shall be provided for ground water recharging and overflow to be discharged in the jaffari drains. Treated sewage shall be used for irrigation.

Energy Management System Including Use of Renewable Energy

A single point supply of 33kv shall be taken and through an electric substation, 440v supply shall be supplied to individual plots through distribution panels and sub meters.

Fire Protection And Fire Safety System

Not Applicable.

Social Infrastructure And Other Public Amenities Including Public Health Services

Common social infrastructure shall be provided for all the phases combined.

Emergency Evacuation Services

Not Applicable

Other Miscellaneous Work

Not Applicable

Documents

Registry Document

No: 7866 | Date: 18-10-2007

Registry Document

No: 3894 | Date: 12-05-2008

Registry Document

No: 3894 | Date: 12-05-2008

Registry Document

No: 9896 | Date: 24-10-2008

Registry Document

No: 5002 | Date: 06-06-2008

Registry Document

No: 11450114 | Date: 01-10-2014

Registry Document

No: 12500 | Date: 10-10-2012

Registry Document

No: 12749 | Date: 19-10-2012

Registry Document

No: 8619 | Date: 11-09-2009

Registry Document

No: 11247 | Date: 27-11-2009

Registry Document

No: 6281 | Date: 27-05-2013

Registry Document

No: 3035 | Date: 07-04-2015

Registry Document

No: 9500 | Date: 27-07-2010

Registry Document

No: 10318 | Date: 05-11-2009

Registry Document

No: 2054 | Date: 04-03-2008

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1427-1432 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Proforma of Completion Certificate(Occupancy)

Other

Details of Encumbrances

Uploaded: 10-01-2023

Commencement Certificate

Uploaded: 29-12-2022

Other Plan(If Any)

Uploaded: 10-01-2023

Proforma of Application Form

Uploaded: 10-01-2023

Proforma of Allotment Letter

Uploaded: 10-01-2023

Proforma of Conveyance Deed

Uploaded: 10-01-2023

Waste Disposal Plan

Uploaded: 29-12-2022

Water Supply Plan

Uploaded: 29-12-2022

Electricity Supply Plan

Uploaded: 29-12-2022

Development Work Plan

Uploaded: 10-01-2023

Affidavit

Uploaded: 10-01-2023

CA CERTIFICATE

Uploaded: 10-01-2023

ARCHITECT CERTIFICATE

Uploaded: 10-01-2023

ENGINEERS CERTIFICATE

Uploaded: 10-01-2023

Other

Uploaded: 10-01-2023

Permits

Orignal Permit NoPlotted Resi development/Plotted Housing/00714/AGDA/LD/21-22/0100/05082021
Orignal Permit Date15-12-2022
Valid Upto14-12-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto13-12-2030
End Date14-12-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Mayank Agarwal
Contractor AddressSCF Plot No.-09, Ozone City, Mahua Khera, Quarsi Bye Pass, Aligarh, Uttar Pradesh
Architect NameVakil Mittal
Architect Address1023 10th Floor, JMD MegaPolis, Sector-48, Gurgaon- 122001
Architect Licence NumberCA/2010/50178
Structural Engineer NameNot Applicable because of Plotted Development
Structural Engineer AddressNot Applicable because of Plotted Development
Mobile number(Project Co-ordinator)9215343184

Land Details

Plot

Showing 1 blocks with 5 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

5 units

Khasra Details

Total Area

31299.78

336907.70 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No65, 69/6, 171/1, 171/2, 172, 173Min, 174 Min, 42/3, 48/2, 48/5, 48/7, 9/4, 116/1
Area(In Sq. Mt.)31299.78

Other Details

Contractor Name (if any)Mayank Agarwal
Contractor AddressSCF Plot No.-09, Ozone City, Mahua Khera, Quarsi Bye Pass, Aligarh, Uttar Pradesh
Architect NameVakil Mittal
Architect Address1023 10th Floor, JMD MegaPolis, Sector-48, Gurgaon- 122001
Architect Licence NumberCA/2010/50178
Structural Engineer NameNot Applicable because of Plotted Development
Structural Engineer AddressNot Applicable because of Plotted Development
Mobile number(Project Co-ordinator)9215343184