Launch Date
Completion Date
RERA ID
25.388455
81.892688
Demarcation of Plots will be done as per Layout plan.
Boundary wall will be constructed as per drawing
Road work will be constructed by promoter as per Layout plan.
Footpaths will be constructed on road sides.
Water supply including Drinking water Facilities will developed as per plan. Water supply will be provided by UGT/OHT.
Sewerage system including STP will be developed as designed. And developed by Promoter
All Drainage system will be constructed as per requirement and designed.
All Parks within Pockets will be developed as designed by Promoters.
Trees will be Planted on the Road side and Green areas as per designed and requirements by Promoter.
Street Lighting will be provided and electricity supply line will be laid by Promoter
Common community building will be provided as per layout
STP will be Constructed at site and Disposal as per Requirement
Solid waste management and disposal system will be Provided as per Requrement.
Rain Water Harvesting will be developed as per required and designed by Promoter
Energy management system i/c use of renewable energy will be Provided as per Govt. Norms and designed by Promoter.
Fire NOC Received and Fire Protection and Fire Safety System will be Provided as per Govt. Norms and designed by Promoter.
All Social infrastructure and public amenities i/c Public health Services will be provided as per Govt. Policy and layout.
Will be Provided as per plan.
If required will be Provided as requirement/designed by Promoter
Showing 15 blocks with 60 units
Total Carpet Area
14258.40 m²
153475.99 ft²
Total Units
120
1 different types
Blocks & Floors
15
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
63102.00 m²
679223.62 ft²