Launch Date
Completion Date
RERA ID
25.42
81.95
AS PER APPROVED MAP A TOTAL OF 25 PLOTS ARE BEING DEVELOPED OUT VARIOUS SIZES. DEMARCATION OF PLOT WILL BE DONE WITH 5 FT (4 INCH) BRICK WORK
THE EXTENSION-P3 IS CONJUNCTION WITH LARGER INTEGRATED TOWNSHIP WHICH IS DEVELOPED WITH SINGLE ENTRY AND EXIT. THE TOWNSHIP IS BOUNDED BY COMPOUND WALL ACROSS THE TOWNSHIP. THE SAID BOUNDARY WALL IS CONSTRUCTED WITH 9 INCH BRICK WORK AND 6 FT IN HEIGHT. THE CONSTRUCTION IS DONE WITH FLY-ASH/RED BRICK USING CEMENT MORTAR 1-6 RATIO.
AS PER DPR OF THE PROJECT ROAD NETWORK IS DEVELOPED ACROSS THE PROJECT IN HIERARCHY FROM 15 MTR., 12 MTR AND 9 MTR. ROAD CONSTRUCTION IS CARRIED OUT WITH BASIC EARTH WORK FOLLOWED BY WBM, GSB, AND STONE DUST FOLLOWED WITH EXTENSIVE COMPACTION THEREAFTER GANGA SAND (2 INCH THICK BED) IS LAID AND THEREAFTER FINISHED WITH INTERLOCKING PAVERS.
THE FOOTPATHS HAVE BEEN DESIGNED TO CARRY SEVER (6 INCH HUME PIPE). WATER LINE (2 INCH UPVC). STORM WATER (6 INCH PVC PIPE) DRAIN PIPE. ALL TEHSE SERVICES ARE UNDERGROUND. THE FOOTPATH IS CONSTRUCTED USING CHEQURED TILES (1FTX1FT) WITH KERB STONE (12 INCH WIDE). AVENUE TREES AND ELECTRICAL POLES (9M AND 11M) ARE INSTALLED ADJACENT TO THESE FOOTPATHS.
ELEVATED WATER TANK OF 125000 LTR CAPACITY FED BY 6 HP BORE WELL PUMPS IN REDUNDANCY ARRANGEMENT IS ALSO MADE FOR CHLORINE DOZING TO DISTRIBUTE PORTABLE WATER TO HOUSEHOLDS A NETWORK OF 2 INCH UPVC PIPES ARE LAID UNDER GROUND FOR WATER SUPPLY WITHIN THE TOWNSHIP.
A NETWORK OF UNDERGROUND 6 INCH HUME PIPE HAVE BEEN LAID TO CARRY SEVERAGE FROM HOUSE HOLD TO STP PLACED WITHIN THE TOWNSHIP THE TOWNSHIP IS PLANNED AS A ZERO DISCHARGE DEVELOPMENT. DECENTRALIZED PACKAGED STPs OF 40 KLD EACH AS PER SECTOR ARE AS DETAIL ED IN PROJECT DPR ARE BEING COMMISSIONED. THESE PACKAGED STPs ARE BASED ON ANAEROBIC PROCESS TO BREAK-DOWN SEWER AND SLUDGE WASTE.
ROOF TOP RUN OFF AND KITCHEN WASTE WATER IS DRAINED FROM ROAD AREAS AND HOUSEHOLDS THROUGH 6 INCH PVC PIPES WHICH ARE LAID UNDERGROUND DEPENDING UPON THE CLASSIFICATION OF WASTE WATER IT IS EVENTUALLY DRAINED INTO RAIN WATER HARVESTING PITS (4 NOS), SCREENING FILTERS OR ARTIFICIAL POND (1720 SQ MTR) DEVELOPED WITHIN THE TOWNSHIP.
PARKS AND GREEN AREA HAVE BEEN DEVELOPED WITHIN THE TOWNSHIP AS PER APPROVED MAP. THE TOWNSHIP HAS A PARKS EARMARKED FOR SENIOR CITIZENS WITH SPACE FOR YOGA AND SEATING ARRANGEMENT AND FLOWERING PLANTS AND SHRUBS. SIMILARLY A CHILDREN PARK WITH PLAY STATION AND WALK THROUGH FOUNTAIN HAS BEEN DEVELOPED A SPORT CENTER AS PER THE DENSITY NORMS OF THE TOWNSHIP. IT HAS BEEN DEVELOPED WITH CRICKET GROUND, FOOTBALL FIELD, BASKET BALL, VOLLEYBALL, BADMINTON COURT AND SWIMMING POOL. THIS SPORT CENTER DEVELOPED OVER 2.5 ACRE LAND AND OPEN AIR GYM IS MADE OVER 250 SQ MTR. LAND.
MORE THAN 700 TREES HAVE BEEN PLANTED WITHIN THE TOWNSHIP. AVENUE TREE SUCH AS GULMOHAR CHITWAN AND AMALTAS ETC. AND BUSHES AND HEDGES HAVE BEEN PLANTED IN HIERARCHICAL ORDER FLOWERING PLANTS AND EVERGREEN PLANTS HAVE BEEN PLANTED IN OPEN AREAS, PARKS AND OTHER INSTALLATION.
ELECTRIC POLES WITH LED STREET LIGHTS ARE PLACED AT 60 FT TO 80 FT INTERVAL. EACH STREET LIGHT INSTALLED WITH WATTAGE OF 100 WATT OR 200 WATT AS PER REQUIREMENT A TOTAL OF OVER 250 SUCH STREETS HAVE BEEN INSTALLED WITHIN THE TOWNSHIP.
CONSTRUCTION OF COMMUNITY HALL/FUNCTION HALL, MULTI PURPOSE HALL WITH KITCHEN HAS BEEN CONSTRUCTED OVER A PLOT SIZE OF 600 SQ MTR (INCLUDING PARKING). THE BUILDING ALSO HOUSES A MODERN GYM AND INDOOR GAMES ROOM.
DECENTRALIZED PACKAGED STPs 40 KLD EACH IS BEING INSTALLED AS PER DPR IN VARIOUS SECTORS OF THE TOWNSHIP SEWAGE AND SULLAGE WATER WILL BE CARRIED FROM HOUSEHOLDS THROUGH UNDERGROUND SERVICES PIPE TO THE SPTs THE TREATED WATER FROM THE STP USED TO IRRIGATION OR SENT TO THE ARTIFICIAL POND (1720 SQ MTR) DEVELOPED WITHIN THE TOWNSHIP.
DECENTRALIZED PACKAGED STPs 40 KLD EACH IS BEING INSTALLED AS PER DPR IN VARIOUS SECTORS OF THE TOWNSHIP. THESE STPs WORK ON ANAEROBIC PROCESS TO BREAK-DOWN SOLID WASTE AND FILTERED WATER IS RECEIVED FROM THE INCOMING GRAY WATER. THE FILTERED WATER USED FOR IRRIGATION AND WASHING ROADS( POLLUTION CONTROL).
RAIN WATER HARVESTING SYSTEM HAS BEEN DEVELOPED AT FOUR LOCATIONS WITHIN THE TOWNSHIP AND STIPULATED NOC FROM GROUND WATER DEPARTMENT HAS BEEN RECEIVED. RWH PITS OF 50 CuMT, 35 CuMT, 65 CuMT, 40CuMT, ALONG WITH FILTERS HAS BEEN DEVELOPED FOR THE TOWNSHIP.
THE TOWNSHIP HAS SANCTIONED LOAD OF 1558 KW FROM PuVVNL PRAYAGRAJ. INDIVIDUAL HOUSEHOLDS ARE SUPPLIED WITH ELECTRICAL CONNECTION FROM THE DEPARTMENT. FIVE SOCIETY CONNECTION RANGING FROM 5 KW TO 10 KW HAVE BEEN TAKEN FOR DIFFERENT PURPOSES WITHIN THE TOWNSHIP SUCH AS STREET LIGHT, PUMP ROOM, TEMPLE AND COMMON AREA ETC.
REQUISITE FIRE PROTECTION SYSTEM HAS BEEN DEVELOPED AS PER REQUIREMENT. BEING A PLOTTED DEVELOPMENT PROJECT THE REQUIREMENT OF FIRE PROTECTION IS LIMITED. HOWEVER 10 FIRE HYDRANT AND SAND BUCKETS HAVE BEEN PLACED AT VARIOUS ACCESSIBLE AREAS. EVACUATION AREA HAVE BEEN EARMARKED AT FIVE LOCATION WITHIN THE TOWNSHIP.
STIPULATED IN THE INTEGRATED TOWNSHIP POLICY LAND HAS BEEN EARMARKED AND PROVISION HAS BEEN MADE FOR NURSING HOMES, SCHOOL ETC. WITHIN THE TOWNSHIP WHERE RESIDENT CAN AVAIL SERVICES ON PAYMENT BASIS.
FIVE NUMBERS EMERGENCY EVACUATION AREAS HAVE BEEN EARMARKED IN OPEN SPACES SUCH AS PARKS AND TOT-LOTS. WITH A CAPACITY TO HOLD MINIMUM 100 PERSONS AT A TIME IN CASE OF REQUIREMENT. BEING A PLOTTED DEVELOPMENT PROJECT THE NEED FOR SUCH SERVICES ARE MINIMAL.
UNDER THE INTEGRATED TOWNSHIP POLICY OF THE UP GOVERNMENT. DETAILED PROJECT REPORT (DPR)HAS BEEN APPROVED BY PRAYAGRAJ DEVELOPMENT AUTHORITY AND DEVELOPMENT AGREEMENT HAS BEEN SIGNED WITH PDA. ALL DEVELOPMENT NORMS, RULES AND COMMITMENTS MADE IN THE DEVELOPMENT AGREEMENT ARE BEING ADHERED TO.
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4970.00 m²
53496.58 ft²