AS PER APPROVED MAP A TOTAL OF 40 PLOTS ARE BEING DEVELOPED OUT OF WHICH 31 ARE OF 100 SQ. YARD WHILE REST ARE OF VARIOUS SIZES. DEMARCATION OF PLOT WILL BE DONE WITH 5FT (4 INCH) BRICK WALL.
THE EXTENSION -P1 IS CONJUNCTION WITH THE LARGER INTEGRATED TOWNSHIP WHICH IS DEVELOPED WITH SINGLE ENTRY AND EXIT. THE TOWNSHIP IS BOUNDED BY COMPOUND WALL BUILT ACROSS THE TOWNSHIP. THE SAID BOUNDARY WALL IS CONSTRUCTED WITH 9 INCH BRICK WORK AND 6 FT IN HEIGHT. THE CONSTRUCTION IS DONE WITH FLY-ASH/RED BRICK USING CEMENT MORTAR 1-6 RATIO.
AS PER THE DPR OF THE PROJECT ROAD NETWORK IS DEVELOPED ACROSS THE PROJECT IN HIERARCHY FROM 15 MTR., 12 MTR AND 9 MTR. ROAD CONSTRUCTION IS CARRIED OUT WITH BASIC EARTH WORK FOLLOWED BY WBM, GSB AND STONE DUST FOLLOWED WITH EXTENSIVE COMPACTION THEREAFTER GANGA SAND 2 INCH THICK BED IS LAID AND THEREAFTER FINISHED WITH INTERLOCKING PAVERS.
THE FOOTPATHS HAVE BEEN DESIGNED TO CARRY SEVER (6INCH HUME PIPE), WATER LINE (2INCH UPVC) STORM WATER (6INCH PVC PIPE) DRAIN PIPES. ALL THESE SERVICES ARE UNDERGROUND. THE FOOTPATH IS CONSTRUCTED USING CHEQUERD TILES (1FTX1FT) WITH KERB STONE (12 INCH WIDE). AVENUE TREES AND ELECTRICAL POLES ARE INSTALLED ADJACENT TO THESE FOOTPATHS.
ELEVATED WATER TANK OF 125000 LTR CAPACITY FED BY 6 HP BORE-WELL PUMPS IN REDUNDANCY. ARRANGEMENT IS ALSO MADE FOR CHLORINE DOZING. TO DISTRIBUTE POTABLE WATER TO HOUSEHOLDS, A NETWORK OF 2 INCH UPVC PIPES ARE LAID UNDER GROUND FOR WATER SUPPLY WITHIN THE TOWNSHIP
A NETWORK OF UNDERGROUND 6 INCH HUME PIPES HAVE BEEN LAID TO CARRY SEWERAGE FROM HOUSEHOLD TO STPs PLACED WITHIN THE TOWNSHIP. THE TOWNSHIP IS PLANNED AS A ZERO DISCHARGE DEVELOPMENT. DECENTRALIZED PACKAGED STP OF 40 KLD EACH AS PER SECTOR AREAS DETAILED IN PROJECT DPR ARE BEING COMMISSIONED. THESE PACKAGED STPs ARE BASED ON ANAEROBIC PROCESS TO BREAK DOWN SLUDGE AND SEWER WASTE.
ROOF TOP RUN OFF AND KITCHEN WASTE WATER IS DRAINED FROM ROAD AREAS AND HOUSEHOLDS THROUGH 6 INCH PVC PIPES WHICH ARE LAID UNDERGROUND. DEPENDING UPON THE CLASSIFICATION OF WASTE WATER, IT IS EVENTUALLY DRAINED INTO RAIN WATER HARVESTING PITS (4 NOS.), SCREENING FILTERS OR ARTIFICIAL POND (1720 SQ MTR) DEVELOPED WITHIN THE TOWNSHIP.
PARKS AND GREEN AREAS HAVE BEEN DEVELOPED WITHIN THE TOWNSHIP AS PER THE APPROVED MAP. THE TOWNSHIP HAS A PARKS EARMARKED FOR SENIOR CITIZENS WITH SPACE FOR YOGA AND SEATING ARRANGEMENT AND FLOWERING PLANTS AND SHRUBS. SIMILARLY A CHILDREN PARK WITH PLAY STATION AND WALK-THROUGH FOUNTAIN HAS BEEN DEVELOPED. A SPORT CENTER AS PER THE DENSITY NORMS OF THE TOWNSHIP HAS BEEN DEVELOPED WITH CRICKET GROUND, FOOTBALL FIELD, BASKETBALL, VOLLEYBALL, BADMINTON COURT AND SWIMMING POOL. THIS SPORT CENTER IS DEVELOPED OVER 2.5 ACRE OF LAND. AN OPEN AREA GYM IS MADE OVER 250 SQ MTR. OF LAND.
MORE THAN 700 TREES HAVE BEEN PLANTED WITHIN THE TOWNSHIP. AVENUE TREE SUCH AS GULMOHAR, CHITWAN AND AMALTAS ETC. AND BUSHES, SHRUBS AND HEDGES HAVE BEEN PLANTED IN HIERARCHICAL ORDER. FLOWERING PLANTS AND EVERGREEN PLANTS HAVE BEEN PLANTED IN OPEN AREAS, PARKS AND OTHER INSTALLATION.
ELECTRIC POLES WITH LED STREET LIGHTS ARE PLACED AT 60 FT TO 80 FT INTERVAL. EACH STREET LIGHT INSTALLED WITH WATTAGE OF 100 WATT OR 200 WATT AS PER REQUIREMENT. A TOTAL OF OVER 250 SUCH STREET LIGHT HAVE BEEN INSTALLED WITHIN THE TOWNSHIP.
CONSTRUCTION OF COMMUNITY HALL/FUNCTION HALL, MULTI PURPOSE HALL WITH KITCHEN HAS BEEN CONSTRUCTED OVER A PLOT SIZE OF 600 SQ MTR( INCLUDING PARKING). THE BUILDING ALSO HOUSES A MODERN GYM AND INDOOR GAMES ROOM.
DECENTRALIZED PACKAGED STPs OF 40 KLD EACH IS BEING INSTALLED AS PER DPR IN VARIOUS SECTORS OF THE TOWNSHIP. SEWAGE AND SULLAGE WATER WILL BE CARRIED FROM HOUSEHOLDS THROUGH UNDER GROUND SERVICES PIPES TO THE STPs. TREATED WATER FROM THE STPs WILL BE USED FOR IRRIGATION OR SENT TO ARTIFICIAL POND (1720 SQ MTR.) DEVELOPED WITHIN THE TOWNSHIP.
DECENTRALIZED PACKAGED STPs OF 40 KLD EACH IS BEING INSTALLED AS PER DPR IN VARIOUS SECTORS OF THE TOWNSHIP. THESE STPs WORK ON ANAEROBIC PROCESS TO BREAK-DOWN SOLID WASTE AND FILTERED WATER IS RECEIVED FROM THE INCOMING GRAY WATER. THIS FILTERED WATER IS USED FOR IRRIGATION AND WASHING ROADS(POLLUTION CONTROL).
RAIN WATER HARVESTING SYSTEM HAS BEEN DEVELOPED AT FOUR LOCATION WITHIN THE TOWNSHIP AND THE STIPULATED NOC FROM GROUND WATER DEPARTMENT HAS BEEN RECEIVED. RWH PITS OF 50 CuMT. 35 CuMT, 65CuMT, 40 CuMT. ALONG WITH FILTERS HAVE BEEN DEVELOPED FOR THE TOWNSHIP.
THE TOWNSHIP HAS A SANCTIONED LOAD OF 1558 KW FROM PuVVNL, PRAYAGRAJ. INDIVIDUAL HOUSEHOLD ARE SUPPLIED WITH ELECTRIC CONNECTION FROM THE DEPARTMENT. FIVE SOCIETY CONNECTION RANGING FROM 5 KW TO 10 KW HAVE BEEN TAKEN FOR DIFFERENT PURPOSES WITHIN THE TOWNSHIP SUCH AS STREET LIGHTING ,PUMP ROOMS ,FOUNTAINS, TEMPLE, AND OTHER COMMON AREA DEVELOPMENT.
REQUISITE FIRE PROTECTIONS SYSTEM HAS BEEN DEVELOPERS AS PER REQUIREMENT. BEING A PLOTTED DEVELOPMENT PROJECT. THE REQUIREMENT FOR FIRE PROTECTION IS LIMITED. HOWEVER 10 NUMBERS FIRE HYDRANT AND SAND BUCKETS HAVE BEEN PLACED VARIOUS EASILY ACCESSIBLE AREAS. EVACUATION AREAS HAVE BEEN EARMARKED AT FIVE PLACES WITHIN THE TOWNSHIP.
AS STIPULATED IN THE INTEGRATED TOWNSHIP POLICY, LAND HAS BEEN EARMARKED AND PROVISION HAS BEEN MADE FOR NURSING HOME, SCHOOL ETC WITHIN THE TOWNSHIP WHERE RESIDENTS CAN AVAIL SERVICES ON PAYMENT BASIS.
FIVE NUMBER OF EMERGENCY EVACUATION AREAS HAVE BEEN EARMARKED IN OPEN SPACE SUCH AS PARK AND TOT-LOTS. WITH A CAPACITY TO HOLD MINIMUM 100 PERSONS AT A TIME IN CASE OF REQUIREMENT. BEING A PLOTTED DEVELOPMENT PROJECT THE NEED FOR SUCH SERVICES IS MINIMAL.
UNDER INTEGRATED TOWNSHIP POLICY OF THE UP GOVERNMENT. DETAILED PROJECT REPORT HAS BEEN APPROVED BY PDA AND DEVELOPMENT AGREEMENT HAS BEEN SIGNED WITH PDA. ALL DEVELOPMENT NORMS, RULES, AND COMMITMENT MADE IN THE DEVELOPMENT AGREEMENT ARE BEING ADHERE TO.
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7540.00 m²
81159.81 ft²