Launch Date
Completion Date
RERA ID
25.442375
81.782453
Yes
Yes, as per approved map
Yes, as per approved map
Yes, as per approved map
In plumbing drawing we have mentioned all the three features which are required through Red line we are showing sewer pipe line system, Blue line we are showing Rain water harvesting.For drain slopes are marked.Underground water tank and under ground boring point are also shown in the drawing.
In plumbing drawing we have mentioned all the three features which are required through Red line we are showing sewer pipe line system, Blue line we are showing Rain water harvesting.For drain slopes are marked.Underground water tank and under ground boring point are also shown in the drawing.
In plumbing drawing we have mentioned all the three features which are required through Red line we are showing sewer pipe line system, Blue line we are showing Rain water harvesting.For drain slopes are marked.Underground water tank and under ground boring point are also shown in the drawing.
Yes, as per approved map
Yes, as per approved map
In Electrical plan we have shown all the necessary points i.e.- Lights,fans,Plug points,Switch boards,T.v point,telephone point etc.there is shaft for Electrical and low voltage wires.
Applicable
We are providing Sewage treatment plant ,location of which is already shown in the plans
Applicable
Applicable
Applicable
Applicable
Gym to be provided
Fire Escape staircase is also provided in each block rest all provisions shall be made as per fire NOC and NBC norms
Not Applicable
Showing 2 blocks with 92 units
Total Carpet Area
21470.86 m²
231110.19 ft²
Total Units
260
3 different types
Blocks & Floors
2
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9650.00 m²
103871.63 ft²