Launch Date
Completion Date
RERA ID
28'44'0.82'' N
77'26'43.58'' E
Designated Plots are demarcated as per the sanctioned layout issued by the Authority.
Boundary wall shall be commenced as soon as the construction work shall be started.
Internal roads designed of different R.O.W as per requirement.
Footpath shall be provided as per the Layout Plan.
Municipal water supply plan shall be used for drinking purposes.
Sewerage system shall be used with STP as per the design calculation.
Separate drainage line shall be used as per the design calculation.
Landscape area shall be provided as per the Local Building Bye-laws.
Shall be provided as per the Landscape Layout.
Electric supply including street light shall be provided as per the Layout.
Shall be provided as per the design requirement.
Disposal system of sewage and sullage water shall be used through STP for the purpose of Landscaping and Flushing.
All the solid waste managed as per the biodegradable waste converted into compost and non biodegradable delivered to waste disposal.
Low flow water fixtures shall be used for water conservation and STP water is used for landscape and flushing purpose.
Provision shall be made of Roof Solar panel and Solar Light Lamps.
Shall be provided as per the approved Fire drawing and National Building Code.
Social infrastructure and other public amenities including public health services shall be provided as per the local Building Bylaws.
Shall be as per the Environment management plan and disaster management plan all provisions are made accordingly.
Other miscellaneous work shall be provided as per the Layout plan.
Showing 2 blocks with 43 units
Total Carpet Area
21788.94 m²
234533.97 ft²
Total Units
966
3 different types
Blocks & Floors
2
21 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9930.00 m²
106885.53 ft²