Max Estate 361, is a large mixed-generation residential development by Max Estates in Sector 36A, on the Dwarka Expressway in Gurgaon. It is being built to be one of the standout addresses on the corridor: a 30 acres combined township conceived as an intergenerational community, with homes for young couples, family residences, and dedicated senior living spaces run by Antara Senior Living, all within one large landscaped estate. For a buyer, the proposition is rare in the NCR, a single integrated community designed for every life stage rather than a one-size apartment block.
Registered with HARERA under RERA-GRG-2093-2025, the project spans 14.29 acres (within an 18.24-acre licensed parcel) with 5 towers rising to 46 floors and 1,096 residences, at a density of about 77 units per acre and a FAR of 3.03. The configurations run the full range, 1, 2, 3 and 4 BHK homes and penthouse duplexes, with super areas from 1,144 sq ft to 7,536 sq ft and a carpet efficiency of around 57%. An entry home works out to around ₹6.89 crore on base price, and pricing has already moved from a launch rate of ₹21,350 per sq ft to roughly ₹22,350 per sq ft.
Intergenerational and Senior Living, in One Community
What sets Estate 361 apart is its design as an intergenerational community. Rather than a single buyer profile, the estate brings together homes for young professionals and couples, larger family residences, and a dedicated senior living offering operated by Antara Senior Living, the Max Group's specialist senior care platform. For families, that means parents and grown children can live within the same community while retaining independence, with age-appropriate design, care services and shared social infrastructure on hand. Antara's involvement is the differentiator here: senior living is run by a specialist operator rather than treated as an afterthought, which is genuinely uncommon in mainstream Gurugram launches.
A Lake, a Forest and Landscaped Greens
Estate 361 is planned around extensive landscaping rather than just towers. As per the project's brochure, the development is being built around a central lake and a forest-themed green expanse, supported by a large clubhouse and wide parks and green belts woven through the layout. The site plan allocates substantial land to parks, playgrounds and green belts alongside one of the larger clubhouses in the segment, giving the community a low-rise, nature-led feel at ground level despite the height of the towers. For residents, the lake and forest are the central organising features of daily life rather than peripheral amenities.
Why Sector 36 and the Dwarka Expressway
Sector 36A sits on the Dwarka Expressway, the 16-lane access-controlled corridor linking Gurugram with Dwarka and the Delhi side and connecting onward to IGI Airport and NH-48. The location's standout advantage is its proximity to Global City, the Haryana government's ambitious new urban district, and the wider hospitality and commercial growth planned along the corridor. Connectivity here is set to strengthen further: NHAI has planned a ₹923-crore four-lane underground trumpet interchange on the Dwarka Expressway specifically to connect the upcoming Global City and Vision City developments, infrastructure that directly benefits this stretch. For a buyer, that combination of a large integrated community, expressway access and proximity to a major planned urban district is the core of the long-term case.
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupUploaded on: 27-10-2025
Uploaded on: 27-10-2025
Uploaded on: 20-11-2025
Uploaded on: 20-11-2025





| Particulars | Expenditure (in Lakhs) |
|---|---|
| STP | 0 |
| Other | 0 |
| School | 0 |
| Street Light | 0 |
| Shopping area | 0 |
| Covered Parking | 0 |
| Roads & Pavements | 0 |
| Water Supply System | 0 |
| ELECTRIFICATION COST | 0 |
| Rainwater Harvesting | 0 |
| Storm Water Drainage | 0 |
| Parks and Playgrounds | 0 |
| Electrical Sub Station | 0 |
| Underground Water Tank | 0 |
| Renewable Energy System | 0 |
| Electricity Supply System | 0 |
| Security and fire fighting | 0 |
| Clubhouse/community centres | 0 |
| Sewerage treatment & garbage disposal | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Covered Parking | 0 | 0 | 0 | 0 |
| Electric Substation | 0 | 0 | 0 | 0 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Electrification Cost up to Project Site | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | 0 | 0 | 0 | 0 |
| Renewable Energy System | 0 | 0 | 0 | 0 |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| STP | 0 | 0 | 0 | 0 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | 0 | 0 | 0 | 0 |
| Underground Tank | - | - | - | - |
| Underground Water Tank | 0 | 0 | 0 | 0 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Covered Parking | 0 | 0 | 0 | 0 |
| Electric Substation | 0 | 0 | 0 | 0 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Electrification Cost up to Project Site | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | 0 | 0 | 0 | 0 |
| Renewable Energy System | 0 | 0 | 0 | 0 |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| STP | 0 | 0 | 0 | 0 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | 0 | 0 | 0 | 0 |
| Underground Tank | - | - | - | 0 |
| Underground Water Tank | 0 | 0 | 0 | - |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Covered Parking | 0 | 0 | 404 | 2022 |
| Electric Substation | 0 | 0 | 0 | 0 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Electrification Cost up to Project Site | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | 0 | 0 | 0 | 0 |
| Renewable Energy System | 0 | 0 | 0 | 0 |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| STP | 0 | 0 | 0 | 0 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | 0 | 0 | 0 | 0 |
| Underground Tank | - | - | - | - |
| Underground Water Tank | 0 | 0 | 0 | 0 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Covered Parking | 2022 | 2022 | 2224 | 2224 |
| Electric Substation | 0 | 0 | 0 | 0 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Electrification Cost up to Project Site | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | 0 | 0 | 0 | 0 |
| Renewable Energy System | 0 | 0 | 0 | 0 |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| STP | 0 | 0 | 0 | 0 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | 0 | 0 | 0 | 0 |
| Underground Tank | - | - | - | - |
| Underground Water Tank | 0 | 0 | 0 | 0 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 56 | 98 | 98 | 98 |
| Covered Parking | 2022 | 2022 | 2224 | 2224 |
| Electric Substation | 0 | 0 | 0 | 0 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Electrification Cost up to Project Site | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | 0 | 0 | 0 | 0 |
| Renewable Energy System | 0 | 0 | 0 | 0 |
| Roads & Pavements | 0 | 0 | 0 | 82 |
| STP | 0 | 0 | 0 | 0 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | 0 | 0 | 0 | 0 |
| Underground Tank | - | - | - | - |
| Underground Water Tank | 0 | 0 | 105 | 161 |
| Water Supply System | 0 | 0 | 109 | 167 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 84 | 98 | 98 | 98 |
| Covered Parking | 809 | 0 | 0 | 0 |
| Electric Substation | 0 | 21 | 38 | 38 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Electrification Cost up to Project Site | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | 0 | 0 | 0 | 0 |
| Renewable Energy System | 0 | 0 | 0 | 0 |
| Roads & Pavements | 191 | 191 | 219 | 191 |
| STP | 0 | 0 | 0 | 0 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 0 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | 0 | 0 | 0 | 0 |
| Underground Tank | - | - | - | - |
| Underground Water Tank | 62 | 0 | 0 | 0 |
| Water Supply System | 65 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 84 | 98 | 98 | 98 |
| Covered Parking | 0 | 0 | 0 | 0 |
| Electric Substation | 34 | 34 | 38 | 38 |
| Electricity Supply System | 0 | 302 | 328 | 328 |
| Electrification Cost up to Project Site | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | 0 | 0 | 0 | 0 |
| Renewable Energy System | 0 | 0 | 0 | 0 |
| Roads & Pavements | 191 | 191 | 219 | 191 |
| STP | 0 | 0 | 0 | 0 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 0 | 302 | 328 | 328 |
| Sewerage treatment & garbage disposal | 0 | 0 | 13 | 13 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 17 | 17 |
| Street Light | 0 | 0 | 0 | 0 |
| Underground Tank | - | - | - | - |
| Underground Water Tank | 0 | 0 | 0 | 0 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 98 | 84 | 98 | 14 |
| Covered Parking | 0 | 0 | 0 | 0 |
| Electric Substation | 34 | 38 | 38 | 38 |
| Electricity Supply System | 302 | 302 | 328 | 328 |
| Electrification Cost up to Project Site | 0 | 0 | 440 | 458 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 0 | 0 | 178 | 212 |
| Rain Water Harvesting | 45 | 48 | 48 | 0 |
| Renewable Energy System | 0 | 0 | 27 | 42 |
| Roads & Pavements | 191 | 191 | 191 | 219 |
| STP | 0 | 27 | 77 | 80 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 302 | 302 | 328 | 328 |
| Sewerage treatment & garbage disposal | 13 | 13 | 13 | 13 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 17 | 17 | 17 | 17 |
| Street Light | 0 | 0 | 12 | 14 |
| Underground Tank | - | - | - | - |
| Underground Water Tank | 0 | 0 | 0 | 0 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Covered Parking | 0 | 0 | 0 | 0 |
| Electric Substation | 34 | 0 | 0 | 0 |
| Electricity Supply System | 302 | 0 | 0 | 0 |
| Electrification Cost up to Project Site | 440 | 423 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parks and Playgrounds | 212 | 212 | 34 | 0 |
| Rain Water Harvesting | 0 | 0 | 0 | 0 |
| Renewable Energy System | 40 | 35 | 0 | 0 |
| Roads & Pavements | 191 | 82 | 0 | 0 |
| STP | 77 | 74 | 0 | 0 |
| School | 0 | 0 | 0 | 0 |
| Security and Firefighting Services | 302 | 0 | 0 | 0 |
| Sewerage treatment & garbage disposal | 8 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 11 | 0 | 0 | 0 |
| Street Light | 14 | 14 | 2 | 0 |
| Underground Tank | - | - | - | - |
| Underground Water Tank | 0 | 0 | 0 | 0 |
| Water Supply System | 0 | 0 | 0 | 0 |
Village Harsaru, Sector 36, on the Dwarka Expressway in Gurgaon, close to the upcoming Global City, with connectivity towards IGI Airport and NH-48.
Yes, under HARERA registration RERA-GRG-2093-2025, received 27 October 2025. We recommend verifying it directly on the HARERA portal.
The estate is designed as a single community for every life stage, with homes for young couples, family residences and dedicated senior living spaces operated by Antara Senior Living, so multiple generations can live within one community while retaining independence.
Yes. Senior living residences within Estate 361 are managed by Antara Senior Living, the Max Group's specialist senior care platform.
As per the project brochure, the development is planned around a central lake and a forest-themed green expanse, with a large clubhouse and extensive parks and green belts integrated into the layout.
Developed by
7 Projects
EXECUTIVE SUMMARY Max Estates Limited (MEL) is the real estate development arm of the Max Group, a USD 3 billion Indian multi-business conglomerate with over four decades of institutional history spanning life insurance…
Know More about Max Estates