Have queries on this Project?
28.656330
77.481136
Showing 3 blocks with 215 units
Total Carpet Area
33625.38 m²
361940.23 ft²
Total Units
667
2 different types
Blocks & Floors
3
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
22114.00 m²
238032.88 ft²
22113.89 sq.m. land area (Pase-1 & Phase-2)
856m long peripheral wall with Entry/Exit Gate (Pase-1 & Phase-2)
12m & 7.5m wide internal roads
Footpaths will be running along with internal roads & Central Green Area
Underground tank of 230 KL capacity is proposed to provide 16 hours storage of total per day water requirement.
Underground sewerage system is proposed and designed as per manning formula.
Underground drainage system is proposed and designed as per manning formula for rainfall intensity of 25 mm/hour.
116 nos. Trees proposed
Two transformers (Compact sub station) of 1250 KVA, 11/0.4 KV capacity each shall be used along with necessary switch-gear for distributing electricity of LT voltage. All street / landscape lighting shall be LED based & automatically controlled by astronomical timer and for energy saving, the same shall be selectively controlled by timer as per the time zone.
Multipurpose Community Hall
STP of capacity 425 KLD is proposed. Treated water shall be used for flushing, irrigation, carwash, pathway cleaning & excess water shall be discharged into the municipal sewer as per site.
As per Sanction Map
Rain Water Harvesting facilities shall be provided & treated sewage water shall be recycled to the extent feasible.
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company.
Fire tender path shall be provided as per NBC. Fire fighting system along with pumps & water storage tanks shall be provided as per NBC & NOC from Fire Department.
Club House, Swimming Pool, Gym, Kids play area, etc.
As per Fire NOC
NIL
MARINA SUITES (Phase-I) is located in Ghaziabad.
Yes. MARINA SUITES (Phase-I) is registered under UPRERAPRJ4125 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for MARINA SUITES (Phase-I) is 28 February 2022.
MARINA SUITES (Phase-I) is developed by SKYHIGH INFRAPROJECTS PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.