1 Plot of 23570.92 Sqm., NW Side 30 meters wide Road, SW side 45 meters wide road, SE side 45 meters wide road, NE side other plot.
Length- 659.16 Mtr, height- 1.5 Mtr, material used, type (brick, RCC, fencing), RCC and Brick, appearance- as per elevation, safety features-CCTV
Total Road Length, 566Rmt, and width 6.0 to 7.5 Mtr., number of Lanes-2 way. All roads in the complex will be a combination of Trimix, concrete pavers of different colours, shapes, and thickness. Roads will be laid over 225 mm water-bound macadam.
All footpaths in the complex will be a combination of concrete pavers of different colours, shapes, and thickness of 65 mm and 80 mm laid over a 150 mm water-bound macadam surface.
1 No. , domestic water tank-500 KLD, Fire Water Tank-840KLD, Hydrants provided, Potable water supply from the municipal water supply shall be collected in an underground collection tank and pumped to an overhead water tank. The supply of water to individual Units shall be from the said overhead water tanks. Water treatment using dual media and activated carbon filters
The sewage will be collected through a soil pipeline arrangement, bends, and inspection chambers leading to the sewage water treatment plant (STP) of the total project, and treated water will be used for irrigation and flushing purposes. Pipes are running in the basement ceiling by gravity, pipe size-200 mm dia, manhole has not been proposed as the pipe is running in the basement at ceiling level by gravity, piping network design is used.
Length 385 mtrs., width-450 mm dia(Dia of Pipe) , storm water system is planned using pipe system, Pipe material is SN4, disposal by using rainwater harvesting and external drains.
Green area to be provided as per the approved plan.
The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora, and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance to the services/ usage in the project.
LED lights will be used for street lighting, approximately. 33Nos. of external poles/lights proposed, transformer units, 5 in number.
The community area is within the building footprint and will be developed as per the approved plan.
Sewage shall be treated in the Sewage Treatment Plant (STP) of 700 KLD Capacity, type of STP- MBBR, and thereafter, the treated water shall be used for flushing and irrigation.
Solid waste, approximately 2790 Kg/day, is to be collected from individual flats and stored in the garbage room. Recyclables shall be processed in the compost machine to make compost. Non-recyclable waste shall be disposed of through approved agency.
Rainwater harvesting pits , 5 in number of 45 m3 capacity each, shall be provided for groundwater recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.
A solar panel system of 135 KW will be used to reduce the energy consumption, and electrical appliances with a star rating will be used in the community building.
Sprinklers, fire doors, yard hydrants, smoke detectors, and fire alarm system will be provided as applicable. 12 Nos. External and more than 100 internal hydrants shall be used.
Not Applicable.
Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
Not applicable.
Showing 5 blocks with 1111 units
Total Carpet Area
72669.30 m²
782205.08 ft²
Total Units
1561
5 different types
Blocks & Floors
5
38 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
23570.92 m²
253715.03 ft²