ONGOINGActive

LUSHLANDS

GURUGRAM, WAZIRABAD ST
image
image
image
image
image
image
image
image
24-01-2024
Launch Date
ONGOING
Type
2029-03-31
Completion Date

Overview

Launch Date

24-01-2024

Completion Date

2029-03-31

Configurations

4 BHK, 6 BHK

Sizes

4750 - 11800 sq.ft.

Project Size

4 Buildings - 208 units

Total Floors

32

RERA ID

RERA-GRG-1526-2024

Basic Details

Project NameLUSHLANDS
Project IDRERA-GRG-1526-2024
Project TypeONGOING
Applicant TypeCompany
Submission Date24-01-2024 06:02:37 PM
Builder NameADANI INFRASTRUCTURE AND DEVELOPERS PRIVATE LIMITED
CINU45201GJ2006PTC066449
PANXXXX521J
Emailatulkumar.jain@adani.com
Websitehttps://www.adanirealty.com
Phone (Mobile)9582376753
Phone (Landline)01244128600
Registered AddressPLOT NO. 83, ADANI HOUSE, SECTOR 32, GURUGRAM(HR)- 122001
Project AddressVILLAGE GWAL PAHARI, SECTOR 02, GURUGRAM
DistrictGURUGRAM
TehsilWAZIRABAD ST

Location

Adani Lushlands Location
Adani Lushlands Location

Layout

Loading
Adani Lushlands Layout
Adani Lushlands Layout

Payment Plans

Loading
PP
PP

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
2660 sq.ft
Built Up Area
N/A
Carpet Efficiency
56%
Built Up Efficiency
N/A
Parkings
N/A

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameRBL BANK LTD, GROUND FLOOR, BLOCK A, ABW TOWER, IFFCO CHOWK, GURUGRAM 122001
Account Number409811143547
IFSC CodeRATN0000116
MICR Code110176003
Branch Code00016

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Atul Jain, Address: Flat No. 701, Vidya Enclave, GH-11, Sector-56, Gurugram
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area8.349 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land12.356 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.1924
CONSTRUCTION OF ROADS1.00
PAVEMENTS0
PARKS AND PLAYGROUNDS2.0913
GREEN BELTS0
VEHICLE PARKINGS0.5
ELECTRICITY SUB-STATION0
CLUB HOUSE0.3906
SEWAGE AND SOLID WASTE TREATMENT FACILITY1.4748
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
WATERSUPPLYSYSTEM0.5
STORMWATERDRAINAGE0.5
ELECTRICITYSUPPLYSYSTEM0.2
SECURITYANDFIREFIGHTING0.2
SPORTSBLOCK0.3
Total8.3491

Cost Details

Land Cost4659.68 Lakhs
Other Cost20779.60 Lakhs
Estimated Project Cost90607.68 Lakhs
Estimated Infrastructure Cost4295.13 Lakhs
Estimated Apartment Construction Cost60873.27 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 24-01-2024

ZONING PLAN

Uploaded on: 24-01-2024

5TH TO 20 FLOOR T-1 &3

Uploaded on: 19-07-2024

FIRE SCHEME APPLIED

Uploaded on: 19-07-2024

COMM. CENTER TERRACE

Uploaded on: 19-07-2024

ELEVATION A&C TOWER-1

Uploaded on: 19-07-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 19-07-2024

SPORTS BLOCK AREA STATEMENT

Uploaded on: 19-07-2024

GROUND , STILT T-3

Uploaded on: 19-07-2024

REGISTERED COLLABORATION AGREEMENT GLOBAL CREDIT

Uploaded on: 19-07-2024

BASEMENT FP T-2&4

Uploaded on: 19-07-2024

WATER SUPPLY LAYOUT

Uploaded on: 19-07-2024

ELEVATION A&C TOWER-3

Uploaded on: 19-07-2024

CA CERT FOR FINANCIAL AND INVENTORY

Uploaded on: 19-07-2024

BASEMENT 2

Uploaded on: 19-07-2024

BASEMENT-1 T-4

Uploaded on: 19-07-2024

L PENT HOUSE 21TH FLOOR T-1 &3

Uploaded on: 19-07-2024

STORM WATER

Uploaded on: 19-07-2024

2ND FP- T-2&4

Uploaded on: 19-07-2024

SECTION CC TOWER-3

Uploaded on: 19-07-2024

COMM. CENTER ELEVATION

Uploaded on: 19-07-2024

GROUND , STILT T-1

Uploaded on: 19-07-2024

CA CERTIFICATE NET WORTH

Uploaded on: 19-07-2024

SERVICE PLAN ESTIMATE APPROVAL

Uploaded on: 19-07-2024

FLOOR PLAN T-2 &4

Uploaded on: 19-07-2024

REGISTERED GPA IST GREEN

Uploaded on: 19-07-2024

BRIII GAWAL PAHARI (MDP)

Uploaded on: 19-07-2024

EWS ELEVATION & SECTION

Uploaded on: 19-07-2024

MUTATION

Uploaded on: 19-07-2024

3RD FLOOR T-1 &3

Uploaded on: 19-07-2024

COMM. CENTER BASEMENT-1

Uploaded on: 19-07-2024

TYPICAL FP T-2&4

Uploaded on: 19-07-2024

ENVIRONMENT CLEARANCE APPROVAL

Uploaded on: 19-07-2024

WATER SUPPLY

Uploaded on: 19-07-2024

IRRIGATION LAYOUT

Uploaded on: 19-07-2024

ROAD LAYOUT

Uploaded on: 19-07-2024

MACHINE ROOM & WATER TANK T-1&3

Uploaded on: 19-07-2024

SECTION CC TOWER-1

Uploaded on: 19-07-2024

STORM WATER LAYOUT

Uploaded on: 19-07-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 19-07-2024

LOI

Uploaded on: 19-07-2024

STORM WATER LAYOUT

Uploaded on: 19-07-2024

1ST FLOOR T-1 &3

Uploaded on: 19-07-2024

BASEMENT 1 FP BLOW UP

Uploaded on: 19-07-2024

BASEMENT -1 T-2

Uploaded on: 19-07-2024

ELEVATION B&D TOWER-1

Uploaded on: 19-07-2024

ELEVATION T-2

Uploaded on: 19-07-2024

EWS TERRACE , MACHINE & W TANK

Uploaded on: 19-07-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 19-07-2024

FIRE FIGHTING LAYOUT

Uploaded on: 19-07-2024

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 19-07-2024

RBL UNDERTAKING FOR RERA

Uploaded on: 19-07-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 19-07-2024

3RD FP- T-2&4

Uploaded on: 19-07-2024

4TH FP T -2&4

Uploaded on: 19-07-2024

COMM. CENTER AREA STATEMENT

Uploaded on: 19-07-2024

ELEVATION B&D TOWER-3

Uploaded on: 19-07-2024

EWS G TO 4TH FLOOR

Uploaded on: 19-07-2024

SEWARAGE LAYOUT

Uploaded on: 19-07-2024

SITE PLAN GREEN AREA

Uploaded on: 19-07-2024

SPORTS BLOCK G FLOOR

Uploaded on: 19-07-2024

SPORTS BLOCK MUMTY ROOF

Uploaded on: 19-07-2024

SPORTS BLOCK SECTION

Uploaded on: 19-07-2024

STILT FLOOR PLAN T-4

Uploaded on: 19-07-2024

SERVICE ESTIMATE BOOKLET

Uploaded on: 19-07-2024

SEWERAGE LAYOUT

Uploaded on: 19-07-2024

AFFIDAVIT 4(2)(L)(D)

Uploaded on: 19-07-2024

COD ORDER

Uploaded on: 19-07-2024

ELECTRICAL ASSURANCE

Uploaded on: 19-07-2024

LC-IV

Uploaded on: 19-07-2024

SEWERAGE LAYOUT

Uploaded on: 19-07-2024

2ND FLOOR T-1 &3

Uploaded on: 19-07-2024

17TH&25; TFP T -2&4

Uploaded on: 19-07-2024

BASEMENT 1

Uploaded on: 19-07-2024

COMM. CENTER SECTION

Uploaded on: 19-07-2024

SPORTS BLOCK 1ST FLOOR & TERRACE

Uploaded on: 19-07-2024

SPORTS BLOCK ELEVATION

Uploaded on: 19-07-2024

COMM. CENTER GROUND

Uploaded on: 19-07-2024

U_ PENT HOUSE 9 TH FLOOR T-1 &3

Uploaded on: 19-07-2024

4TH FLOOR T-1 &3

Uploaded on: 19-07-2024

BASEMENT-2 T-4

Uploaded on: 19-07-2024

ELEVATION T-4

Uploaded on: 19-07-2024

L PENT HOUSE 8 TH FLOOR T-1 &3

Uploaded on: 19-07-2024

MACHINE ROOM & WATER TANK T-2&4

Uploaded on: 19-07-2024

SECTION A-A & B B TOWER -1

Uploaded on: 19-07-2024

SECTION A-A & B B TOWER -3

Uploaded on: 19-07-2024

SECTION T-2

Uploaded on: 19-07-2024

SECTION T-4

Uploaded on: 19-07-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 19-07-2024

STILT FLOOR PLAN T-2

Uploaded on: 19-07-2024

TERRACE FP T-1&3

Uploaded on: 19-07-2024

TERRACE FP T-2&4

Uploaded on: 19-07-2024

U_ PENT HOUSE 22TH FLOOR T-1 &3

Uploaded on: 19-07-2024

FIRE FIGHTING LAYOUT

Uploaded on: 19-07-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 19-07-2024

DEMARCATION PLAN

Uploaded on: 19-07-2024

FIRE SCHEME ACKNOWLEDGEMENT

Uploaded on: 19-07-2024

IRRIGATION LAYOUT

Uploaded on: 19-07-2024

JAMABANDI

Uploaded on: 19-07-2024

SUPPLEMENTARY COLLABORATION AGREEMENT

Uploaded on: 19-07-2024

REGISTERED COLLABORATION AGREEMENT IST

Uploaded on: 19-07-2024

REGISTERED GPA GLOBAL CREDIT

Uploaded on: 19-07-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 19-07-2024

SERVICE ESTIMATE BOOKLET

Uploaded on: 19-07-2024

WATER SUPPLY LAYOUT

Uploaded on: 19-07-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 19-07-2024

Statutory Approvals

LICENSEDate: 11-11-2011Status: ALREADY BEEN OBTAINED
ZONINGDate: 11-11-2011Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: Yes
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRIC SUBSTATIONAS PER PROJECT REPORT
CNSTRUCTION OF CIRCULATION ROADAS PER PROJECT REPORT
ELECTRIFICATIONAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

PRAVEEN KUMAR
Name
PRAVEEN KUMAR
PAN
XXXX502R
Email
praveen.kumar8@adani.com
Mobile
9582376753
Landline
01244128600
Address
Emaar Palm Gardens Apartment no. 1106 Tower 9 Sector 83 Gurugram- 122004

Managing Director/CEO

NA
Name
NA
PAN
XXXX0000
Email
praveen.kumar8@adani.com
Mobile
0000000000
Landline
01244128600
Address
NA

Directors

PRANAV AANI
Name
PRANAV AANI
PAN
XXXX014B
Email
praveen.kumar8@adani.com
Mobile
9582376753
Landline
01244128600
Address
Paramshanti Bungalow Survey No. 100-1 Nr Shaswat Bungalows Ahemdabad Gujrat
SRINIVAS ELLAPAKURTHI
Name
SRINIVAS ELLAPAKURTHI
PAN
XXXX078K
Email
praveen.kumar8@adani.com
Mobile
9582376753
Landline
01244128600
Address
F 402 Sangath Posh 200ft Ring Road Chandkheda Ahemdabad Gujrat

Contact Details

Project ContactEmail: premballabh.hatwal@adani.comMobile: 9650045947Landline: 01244128600
Project Contact PersonName: PREM HATWALEmail: premballabh.hatwal@adani.comMobile: 9650045947Landline: 01244128600

Land Details

Land Area8.349 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land12.356 (Acre)

Land Usage

Land Cost4659.68 Lakhs
Other Cost20779.60 Lakhs
Estimated Project Cost90607.68 Lakhs
Estimated Infrastructure Cost4295.13 Lakhs
Estimated Apartment Construction Cost60873.27 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0-20.54-
Construction of Circulation Road--48.1-
Electrical Sub Station----
Electricity Supply System0-0-
Electrification up to site----
Other0-0-
Parking----
Parks and Playgrounds0-0-
Rain Water Harvesting----
Roads & Pavements0-0-
STP----
Security and Firefighting----
Sewerage treatment & garbage disposal0-0-
Shopping area0-0-
Storm Water Drainage0-0-
Street Light----
Underground Tank----
Water Supply System0-0-
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-117.73124.37122.87
Construction of Circulation Road-28.8628.8628.86
Electrical Sub Station-39.7839.7839.78
Electricity Supply System-9.329.329.32
Electrification up to site-252525
Other-000
Parking-0.610.610.61
Parks and Playgrounds-8.578.578.57
Rain Water Harvesting-1.921.921.92
Roads & Pavements-19.6819.6819.68
STP-17.6517.6517.65
Security and Firefighting-0.640.640.64
Sewerage treatment & garbage disposal-3.353.353.35
Shopping area-000
Storm Water Drainage-6.166.166.16
Street Light-2.322.322.32
Underground Tank-10.9110.9110.91
Water Supply System-3.333.333.33
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Construction of Circulation Road28.8628.86--
Electrical Sub Station39.780--
Electricity Supply System9.320--
Electrification up to site250--
Other00--
Parking0.610--
Parks and Playgrounds8.570--
Rain Water Harvesting1.920--
Roads & Pavements19.680--
STP17.650--
Security and Firefighting0.640--
Sewerage treatment & garbage disposal3.350--
Shopping area00--
Storm Water Drainage6.160--
Street Light2.320--
Underground Tank10.910--
Water Supply System3.330--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE, LAMINATED FLOORING AND WOODEN FLOOR/TILES AS APPLICABLE
WALL FINISHING DETAILSEMULSION PAINT
KITCHEN DETAILSGRANITE COUNTER AND MODULAR KITCHEN
BATHROOM FITTINGSSTANDARD MAKE
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESLAMINATED FLUSH DOORS
GLASS WORKNA
ELECTRIC FITTINGSISI STANDARD
CONDUCTING AND WIRING DETAILSISI STANDARD
CUPBOARD DETAILSNA
WATER STORAGEIF APPLICABLE
LIFT DETAILSAS PER APPLICABLE NORMS
EXTERNAL GLAZINGSALUMINIUM FRAMES WITH TOUGHNED GLASS
WINDOWS/GLAZINGSALUMINIUM FRAMES WITH TOUGHNED GLASS
DOORSLAMINATED FLUSH DOORS
MAIN DOORSLAMINATED FLUSH DOORS
INTERNAL DOORSLAMINATED FLUSH DOORS
AIR CONDITIONINGNA
ELECTRICAL FITTINGSISI STANDARDS
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEPAINT FINISH
INTERNAL FINISHINGPAINT FINISH

Unit-wise Specifications

TOILET
FLOORTILES
WALLSEMULSION PAINT/TILES
CEILINGOBD
COUNTERSNA
SANITARY WARE/CP FITTINGSSTANDARD ISI PRODUCTS
FIXTURESSTANDARD ISI PRODUCTS
KITCHEN
FLOORTILES
WALLSTILES/EMULSION PAINTS
CEILINGOBD
COUNTERSGRANITE COUNTER
FIXTURESMODULAR KITCHEN
KITCHEN APPLIANCESGEYSER
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORLAMINATED FLOORING
WALLSACRYLIC EMULSION PAINT
CEILINGOBD
WARDROBESNA
MASTER TOILET
FLOORTILES
WALLSEMULSION PAINT/TILES
CEILINGOBD
COUNTERSN.A
SANITARY WARE/CP FITTINGSSTANDARD ISI PRODUCTS
FITTING/FIXTURESSTANDARD ISI PRODUCTS
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED FLOORING
WALLSACRYLIC EMULSION PAINT
CEILINGOBD
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORMARBLE
WALLSEMULSION PAINT
CEILINGOBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES
WALLS & CEILINGOBD
TOILETOBD
BALCONYNA

Fee Details

Payment 1
amount:2101500.00
cheque no:8833
draft date:05-01-2024
payable to:HRERA Gurugram
payee bank:AXIS BANK LTD.
Payment 2
amount:8150000
cheque no:8922
draft date:24-05-2024
payable to:HRERA Gurugram
payee bank:AXIS BANK LTD.
Payment 3
amount:300000
cheque no:8923
draft date:24-05-2024
payable to:HRERA Gurugram
payee bank:AXIS BANK LTD.