2026-08-23

Project Size

3 Buildings - 380 units

Total Floors

30

RERA ID

RERA-GRG-934-2021

Basic Details

Project NameMahindra Luminare Phase 3
Project IDRERA-GRG-934-2021
Project TypeNEW
Applicant TypeCompany
Submission Date22-09-2021 11:39:35 AM
Builder NameMAHINDRA HOMES PRIVATE LIMITED
CINU70102MH2010PTC203618
PANXXXX691A
EmailHARYANA.RERAMHPL@mahindra.com
Websitehttp://mahindralifespaces.com
Phone (Mobile)9958356668
Phone (Landline)02266793184
Registered Address5TH FLOOR, MAHINDRA TOWERS WORLI, MUMBAI MH 400018 IN
Project AddressSECTOR 59 ,BEHRAMPUR ,GURUGRAM ,HARYANA 122001
DistrictGURUGRAM
TehsilWAZIRABAD ST

Location

Brochures

Loading

Bank Details

Bank NameHDFC BANK LTD. KAMLA MILLS COMPOUND, SENAPATI BAPAT MARG, LOWER PAREL, MUMBAI 400013
Account Number57500000087693
IFSC CodeHDFC0000542
MICR Code400240002
Branch Code542

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr Arvind Subramanian (A-0501 Lodha Bellissimo, N M Joshi Marg, Apollo Mills, Mahalakshmi East, Mumbai,Jacob Circle Mumbai City,Maharashtra, 400011) ,Mr Vimal Agarwal (Mr Vimal Agarwal Flat 9A Tower 6 Central Park 2, Sohna Road,Opposite Raheja Mall, Sector 48, Islampur(97), Gurgaon, Haryana 122018 9953048988 ) Mr Girish Agarwal (Near Balaji Mandir,Jaangido ka Mohalla, Kolsiya Jhunjhunun, Rajasthan- 333042 7042033078 ), Mr Manoj Kasture ( A-3-4-2,Milliennium Tower, Sector 9,Sanpada Navi Mumbai Sanpada Thane Tanne Maharashtra 400705 9819770985 ), Mr Sumit Kasat ( 1803,Wesgate -C Wing ,Lodha Complex,, Majiwada, Thane West,Thane,Thane,Maharashtra-400601 9004023349 ), Mr Rajesh Adiga (210 Jana Jeeva Silver Palms ,Harlur Road, Off Sarjapur Road, Ambalipura, Bangalore South,Hsr Layout, Bangalore,Bangalore South Karnataka, 560102 9739840005 ), Mr Nandan Mallya ( A8-11-01 ,Elita Promenade JP Nagar 7th Phase Bangalore South Bengaluru Karnataka- 560078 9449968141 ), Mr Norbert Dsouza (A/302, Sagar Avenue-1 CHSL dhobighat road near vakola oridge santacruz east Mumbai Santacruz (East )Mumbai Mumbai Maharashtra 400055 9820858926 ), Mr Ashish Ticku (H.NO-112A H.B.COLONY SECTOR -21C Faridabad Faridabad NIT Faridabad Haryana 121001 9654601818 ), Mr Ankur Dwivedi (A-302, Ireo Uptown, Near Golf Course Extn.Road, Sector-66 ,Badshahpur, Gurgaon, Haryana- 122101. 9810756857 ), Mr Vikas Jain (29 Brijdham ,Thekra Road Borekhera Kota kota Rajasthan- 324001 9958356668 ), Mr Aniket Kumar (G-242 Phase 6 Aya Nagar Aya Nagar South Delhi Delhi 110047 9818249991 ), Mrs KN Lakshmi (No 10 .10th Cross Thyagarajnagar 3rd Block Bangalore South Tyagrajnagar Banglore South Bengaluru Karnataka 560028 9714467675 ), Mr Gurvinder Singh ( 197 ,Naraingarg Road Baldev Nagar , Ambala City ASS Singh Garden Ambala, Ambala Haryana- 134007. 8744909966)
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attched

Development Details

Land Area1.415 (Acre)
Proposed FAR1.86597
Permissible FAR1.87
Total Licensed Land17.55 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.214
CONSTRUCTION OF ROADS0
PAVEMENTS0.155
PARKS AND PLAYGROUNDS1.046
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total1.415

Cost Details

Land Cost153 Lakhs
Other Cost17756 Lakhs
Estimated Project Cost38496.80 Lakhs
Estimated Infrastructure Cost912.80 Lakhs
Estimated Apartment Construction Cost19675 Lakhs

Documents

ZONING PLAN

Uploaded on: 16-09-2021

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 16-09-2021

LOI

Uploaded on: 16-09-2021

LC-IV

Uploaded on: 16-09-2021

BIP

Uploaded on: 16-09-2021

ELEVATION PLAN

Uploaded on: 16-09-2021

ENVIRONMENT CLEARANCE APPROVAL

Uploaded on: 16-09-2021

AIRPORT HEIGHT CLEARANCE

Uploaded on: 16-09-2021

BUILDING PLAN APPROVAL LETTER (BR-III)

Uploaded on: 16-09-2021

FOREST NOC

Uploaded on: 16-09-2021

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 16-09-2021

X-SECTION PLAN

Uploaded on: 16-09-2021

PARKING PLAN

Uploaded on: 16-09-2021

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 16-09-2021

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 21-09-2021

WATER NOC

Uploaded on: 21-04-2022

FLOORS PLAN

Uploaded on: 21-04-2022

FIRE SCHEME APPROVAL

Uploaded on: 21-04-2022

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 28-04-2022

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 04-05-2022

SERVICE PLAN AND ESTIMATES APPROVAL/SANCTION LETTER ONLY

Uploaded on: 04-05-2022

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 04-05-2022

SEWER ASSURANCE

Uploaded on: 09-05-2022

STROM WATER NOC

Uploaded on: 09-05-2022

DEMARCATION PLAN

Uploaded on: 09-05-2022

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 24-05-2022

A SERVICE PLAN

Uploaded on: 24-05-2022

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 24-05-2022

PHASING SAJRA REVISED

Uploaded on: 24-05-2022

SUPERIMPOSED PLAN

Uploaded on: 24-05-2022

Statutory Approvals

MINING PERMISSIONDate: 29-06-2021Status: ALREADY BEEN OBTAINED
SEWAGE DISPOSALDate: 02-06-2021Status: ALREADY BEEN OBTAINED
STORM WATER DRAINAGEDate: 01-07-2021Status: ALREADY BEEN OBTAINED
ELECTRICAL LOAD AVAILABILITYDate: 24-11-2020Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 04-06-2014Status: ALREADY BEEN OBTAINED
WATER SUPPLYDate: 25-04-2019Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVAL MEMO NO. FS/2021/25Date: 21-10-2021Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCE AAI/RHQ/NR/ATM/NOC/2021/137/558-56Date: 08-04-2021Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLAN SEIAA (128)/HR/2021/652Date: 13-07-2021Status: ALREADY BEEN OBTAINED
BUILDING PLAN / SITE PLAN APPROVAL MEMO NO. ZP- 435-VOL-II/AD(RA)/2021/20785Date: 23-08-2021Status: ALREADY BEEN OBTAINED
CONSTRUCTION WATER NOCDate: 25-04-2019Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATES APPROVAL 8LC1042 VOL II JE (VA) 2021Date: 06-09-2021Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO HUDA
SHOPPING AREASUBMITTED TO HUDA
RENEWABLE ENERGY SYSTEMSUBMITTED TO HUDA
SCHOOLSUBMITTED TO HUDA
HOSPITAL/DISPENSARYSUBMITTED TO HUDA
ANY OTHERSUBMITTED TO HUDA
STPSUBMITTED TO HUDA
UNDER GROUND WATER TANKSUBMITTED TO HUDA
RAIN WATER HARVESTINGSUBMITTED TO HUDA
ELECTRIC SUB STATIONSUBMITTED TO HUDA
PARKING OPENSUBMITTED TO HUDA

NOC

ROADSProvider: HUDA (PROJECT ALREADY CONNECTED 60 MTS WIDE ROAD )Approval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

ANIKET KUMAR
Name
ANIKET KUMAR
PAN
XXXX988F
Email
KUMAR.ANIKET@MAHINDRA.COM
Mobile
9818249991
Landline
02266793184
Address
G-242 Phase 6 AYA Nagar Ext. New Delhi 110047

Managing Director/CEO

VIMAL AGARWAL
Name
VIMAL AGARWAL
PAN
XXXX775G
Email
AGARWAL.VIMAL@mahindra.com
Mobile
9953048988
Landline
02266793184
Address
A 602 Dheeraj Serenity 2nd Hasnabad Lane Santacruz West Mumbai - 400054

Directors

ARVIND SUBRAMANIAN
Name
ARVIND SUBRAMANIAN
PAN
XXXX870N
Email
SUBRAMANIAN.ARVIND@mahindra.com
Mobile
9820093357
Landline
02266793184
Address
B-1001 Lodha Bellissimo Apolo Mills N M Joshi Marg Mahalakshmi East Mumbai - 400 011
AMEET PRATAPSINH HARIANI
Name
AMEET PRATAPSINH HARIANI
PAN
XXXX956Q
Email
ameet.hariani@gmail.com
Mobile
9821080210
Landline
02266793184
Address
Flat No. 1401 9a Bomanji Petit Road Next to Parasi General Hospital Cumballa Hills Mumbai - 400 026
AMRITA CHOWDHURY
Name
AMRITA CHOWDHURY
PAN
XXXX869M
Email
amrita@gaia.in
Mobile
8879591956
Landline
02266793184
Address
123 Landmark Building Carmichael Road Cumballa Hill Mumbai - 400026
MUKESH TIWARI
Name
MUKESH TIWARI
PAN
XXXX544R
Email
MTiwari@act.is
Mobile
9820788345
Landline
02266793184
Address
A-903 Julian Alps Bhakti Park Wadal East B P T Colony S. O. Antop Hill Mumbai - 400 037
RAGHVENDRA CHANDAK
Name
RAGHVENDRA CHANDAK
PAN
XXXX585B
Email
RChandak@act.is
Mobile
9867500406
Landline
02266793184
Address
85A Kalpataru Sparkle MIG Colony Bandra East Mumbai - 400 051
VIMAL AGARWAL
Name
VIMAL AGARWAL
PAN
XXXX775G
Email
AGARWAL.VIMAL@mahindra.com
Mobile
9953048988
Landline
02266793184
Address
A 602 Dheeraj Serenity 2nd Hasnabad Lane Santacruz West Mumbai - 400054

Contact Details

Project ContactEmail: HARYANA.RERAMHPL@mahindra.comMobile: 9958353331Landline: 0226679318
Project Contact PersonName: ANIKET KUMAREmail: kumar.aniket@mahindra.comMobile: 9818249991Landline: 0226679318

Land Details

Land Area1.415 (Acre)
Proposed FAR1.86597
Permissible FAR1.87
Total Licensed Land17.55 (Acre)

Land Usage

Land Cost153 Lakhs
Other Cost17756 Lakhs
Estimated Project Cost38496.80 Lakhs
Estimated Infrastructure Cost912.80 Lakhs
Estimated Apartment Construction Cost19675 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres---0
Electrical sub station---0
Electricity Supply System---0
Other---0
Parking---0
Parks and Playgrounds---0
Rain Water---0
Renewable energy system---0
Roads & Pavements---0
STP---0
Security and Fire fighting service---0
Sewerage treatment & garbage disposal---0
Shopping area---0
Storm Water Drainage---0
Street Light---0
Underground Tank---0
Water Supply System---0
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station0000
Electricity Supply System0000
Other0000
Parking0000
Parks and Playgrounds0000
Rain Water004.60
Renewable energy system0000
Roads & Pavements0000
STP0000
Security and Fire fighting service0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Underground Tank006.930
Water Supply System0000
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station0000
Electricity Supply System000319.365
Other0000
Parking0000
Parks and Playgrounds000.45670.4567
Rain Water0000
Renewable energy system0002.92
Roads & Pavements0008.6725
STP0000
Security and Fire fighting service0000
Sewerage treatment & garbage disposal0004.028
Shopping area0000
Storm Water Drainage0005.18
Street Light0002.72
Underground Tank00028.686
Water Supply System0008.254
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station0000
Electricity Supply System319.365000
Other0000
Parking0000
Parks and Playgrounds0.4567000
Rain Water0000
Renewable energy system2.92000
Roads & Pavements8.67258.67258.67250
STP0000
Security and Fire fighting service28.68628.68628.68628.686
Sewerage treatment & garbage disposal4.02847.0284.0284.028
Shopping area0000
Storm Water Drainage0000
Street Light2.72000
Underground Tank0000
Water Supply System8.2548.2548.2548.254
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres000-
Electrical sub station000-
Electricity Supply System000-
Other000-
Parking000-
Parks and Playgrounds000-
Rain Water000-
Renewable energy system000-
Roads & Pavements000-
STP000-
Security and Fire fighting service000-
Sewerage treatment & garbage disposal000-
Shopping area000-
Storm Water Drainage000-
Street Light000-
Underground Tank000-
Water Supply System000-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING ROOM / DINING FAMILY LOUNGE - ITALIAN/ IMPORTED MARBLE BED ROOM-LAMINATED WOODEN FLOOR KITCHEN-ANTI-SKID VITRIFIED TILES TOILETS-ANTI-SKID VITRIFIED TILES BATHROOMS -ANTI-SKID VITRIFIED TILES BALCONIES / TERRACES-ANTI-SKID VITRIFIED TILES SERVANT ROOM & TOILET-ANTI-SKID VITRIFIED TILES APARTMENT LIFT LOBBIES (PRIVATE).-ITALIAN/ IMPORTED MARBLE
WALL FINISHING DETAILSWALLS - LOW VOC ACRYLIC EMULSION PAINT , CERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA ,VITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER ,SS HANDRAIL WITH LAMINATED TOUGHENED GLASS WITH GRANITE COPING,LOW VOC OIL-BASED DISTEMPER PAINT , STONE CLADDING AND LOW VOC ACRYLIC EMULSION PAINT
KITCHEN DETAILSCERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA,CEILING - LOW VOC ACRYLIC EMULSION PAINT AND PART GYPSUM BOARD FALSE CEILING AS PER DESIGN. MODULAR KITCHEN CABINET WITH GRANITE COUNTER-TOP, HOB (HAFFELE), CHIMNEY WILL BE PROVIDED.
BATHROOM FITTINGSTOTO, GROHE OR EQUIVALENT
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESDOORS - WOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES,UPVC FRAMED DOUBLE GLAZING UNIT,WOODEN FRAME WITH FLUSH DOOR WITH BOTH SIDE LAMINATED FINISH & ARCHITRAVE.
GLASS WORKLAMINATED TOUGHENED GLASS IN BALCONIES, UPVC FRAMED DOUBLE GLAZING
ELECTRIC FITTINGSHEAVY DUTY/ MEDIUM DUTY
CONDUCTING AND WIRING DETAILSRLS 1.5,2.5,4,2.5
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSHIGH SPEED ELEVATORS- BY THYSSENKRUPP OR EQUIVALENT
EXTERNAL GLAZINGSFULL POINT WINDOW UPUC
WINDOWS/GLAZINGSUPVC FRAMED DOUBLE GLAZING
DOORSWOODEN PLY
MAIN DOORSNA
INTERNAL DOORSNA
AIR CONDITIONINGVRV AIR-CONDITIONING
ELECTRICAL FITTINGSMODULAR
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT FINISH
INTERNAL FINISHINGLOW VOC ACRYLIC EMULSION

Unit-wise Specifications

TOILET
FLOORANTI-SKID VITRIFIED TILES
WALLSVITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN.
COUNTERSGRANITE ON THE COUNTER
SANITARY WARE/CP FITTINGSTOTO, GROHE OR EQUIVALENT
FIXTURESTOTO, GROHE OR EQUIVALENT
KITCHEN
FLOORANTI-SKID VITRIFIED TILES
WALLSCERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA.
CEILINGLOW VOC ACRYLIC EMULSION PAINT & PART GYPSUM FALSE CEILING AS PER DESIGN.
COUNTERSGRANITE COUNTER TOP
FIXTURESNA
KITCHEN APPLIANCESMODULAR KITCHEN CABINET WITH GRANITE COUNTER TOP/ HOB, CHIMNEY WILL BE PROVIDED.
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORLAMINATED WOODEN FLOOR
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT AND PART GYPSUM BOARD FALSE CEILING AS PER DESIGN.
WARDROBESNA
MASTER TOILET
FLOORANTI-SKID VITRIFIED TILES
WALLSVITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN.
COUNTERSGRANITE ON THE COUNTER
SANITARY WARE/CP FITTINGSTOTO, GROHE OR EQUIVALENT
FITTING/FIXTURESTOTO, GROHE OR EQUIVALENT
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOOR
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT AND PART GYPSUM BOARD FALSE CEILING AS PER DESIGN.
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORITALIAN/ IMPORTED MARBLE
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT AND PART GYPSUM BOARD FALSE CEILING AS PER DESIGN
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORANTI-SKID VITRIFIED TILES
WALLS & CEILINGEXTERIOR GRADE PAINT OF APPROVED MAKE
TOILETNA
BALCONYSS HANDRAIL WITH LAMINATED TOUGHENED GLASS

Fee Details

Payment 1
amount:332300
cheque no:306
draft date:15-09-2021
payable to:HRERA Gurugram
payee bank:HDFC BANK
Payment 2
amount:2025000
cheque no:336
draft date:30-10-2021
payable to:HRERA Gurugram
payee bank:HDFC