ONGOINGActive

Mahindra Luminare Phase 2

GURUGRAM, WAZIRABAD ST
27-12-2019
Launch Date
ONGOING
Type
2021-03-31
Completion Date

Overview

Launch Date

27-12-2019

Completion Date

2021-03-31

Project Size

3 Buildings - 380 units

Total Floors

30

RERA ID

RERA-GRG-408-2019

Basic Details

Project NameMahindra Luminare Phase 2
Project IDRERA-GRG-408-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date27-12-2019 03:38:00 AM
Builder NameMAHINDRA HOMES PVT LTD & IREO PVT LTD
CINU70102MH2010PTC203618
PANXXXX691A
EmailHARYANA.RERAMHPL@mahindra.com
Websitehttps://www.mahindralifespaces.com
Phone (Mobile)9958353331
Phone (Landline)02266793184
Registered Address5TH FLOOR MAHINDRA TOWERS, WORLI, MUMBAI - 400018 & IREO PVT LTD C-4,1ST FLOOR, MALVIYA NAGAR NEW DELHI 110017
Project AddressSECTOR 59, VILLAGE BEHRAMPUR,
DistrictGURUGRAM
TehsilWAZIRABAD ST

Location

Brochures

Loading

Bank Details

Bank NameHDFC BANK LTD, 3RD FLOOR, LODHA- I THINK, TECHNO CAMPUS, NEXT TO KANJURMARG RAILWAY STATION, KANJURMARG EAST, MUMBAI- 400042
Account Number57500000087680
IFSC CodeHDFC0000542
MICR Code400240002
Branch Code000542

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Rahul Gupta, Address: C-4, Janakpuri, Rajouri Garden, West Delhi-110058
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Not specified

Development Details

Land Area2.77 (Acre)
Proposed FAR0.34
Permissible FAR1.75
Total Licensed Land17.55 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.304
CONSTRUCTION OF ROADS0.506
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS0.106
ELECTRICITY SUB-STATION0
CLUB HOUSE0.173
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER1.679
Total2.768

Cost Details

Land Cost964.76 Lakhs
Other Cost876.24 Lakhs
Estimated Project Cost40727 Lakhs
Estimated Infrastructure Cost799.97 Lakhs
Estimated Apartment Construction Cost359.00 Lakhs

Documents

ANNEXURE-12-1-17 REVISED SITE PLAN

Uploaded on: 14-02-2020

ANNEXURE-12-1-13 COMMUNITY CENTER SECOND FLOOR

Uploaded on: 14-02-2020

ANNEXURE-12-1-14 COMMUNITY CENTER TERRACE

Uploaded on: 14-02-2020

BR III

Uploaded on: 14-02-2020

ANNEXURE-12-1-7 TOWER-3 TERRACE PLAN

Uploaded on: 14-02-2020

REVISED BUILDING PLAN LETTER

Uploaded on: 14-02-2020

ANNEXURE-12-1-1 SITE PLAN

Uploaded on: 14-02-2020

ANNEXURE-12-1-4 TOWER-3 TYPICAL FLOOR PLAN

Uploaded on: 14-02-2020

AIRPORT HEIGHT CLEARANCE NOC

Uploaded on: 14-02-2020

SITE PLAN MOEF

Uploaded on: 14-02-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 14-02-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 14-02-2020

ANNEXURE-12-1-9 TOWER-3 ELEVATIONS

Uploaded on: 14-02-2020

ANNEXURE-12-1-6 TOWER-3 UPPER PENTHOUSE PLAN

Uploaded on: 14-02-2020

ANNEXURE-12-1-12 COMMUNITY CENTER FIRST FLOOR

Uploaded on: 14-02-2020

NON-ENCUMBRANCE CERTIIFCATE

Uploaded on: 14-02-2020

BANK ACCOUNT DETAIL

Uploaded on: 14-02-2020

ANNEXURE-12-1-8 TOWER-3 MUMTY PLAN

Uploaded on: 14-02-2020

ANNEXURE-12-1-10 TOWER-3 SECTION

Uploaded on: 14-02-2020

ANNEXURE-12-1-15 REVISED LOWER BASEMENT PLAN AND PARKING AREA CALCULATION

Uploaded on: 14-02-2020

ANNEXURE-12-1-2 SITE PLAN SERVICES

Uploaded on: 14-02-2020

DEMARCATION PLAN

Uploaded on: 14-02-2020

LOI

Uploaded on: 14-02-2020

ANNEXURE-12-1-19 REVISED UPPER BASEMENT PLAN AND PARKING CALCULATION

Uploaded on: 14-02-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 14-02-2020

ANNEXURE-12-1-5 TOWER-3 LOWER PENTHOUSE PLAN

Uploaded on: 14-02-2020

SERVICE ESTIMATES

Uploaded on: 14-02-2020

ANNEXURE-12-1-18 REVISED UPPER BASEMENT AREA CALCULATION

Uploaded on: 14-02-2020

AUTHORISED SIGNATORY

Uploaded on: 14-02-2020

DD -LUMINARE PHASE 2

Uploaded on: 14-02-2020

ANNEXURE-12-1-14 REVISED LOWER BASEMENT AREA CALCULATION

Uploaded on: 14-02-2020

ANNEXURE-12-1-3 TOWER-3 GF PLAN

Uploaded on: 14-02-2020

ANNEXURE-12-1-20 REVISED UPPER BASEMENT AREA CALCULATION

Uploaded on: 14-02-2020

ANNEXURE-12-1-16 REVISED SECTIONS

Uploaded on: 14-02-2020

DRAFT ALLOTMENT LETTER AND DRAFT AGREEMENT

Uploaded on: 24-12-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 24-12-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 24-12-2019

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 24-12-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 24-12-2019

ZONING PLAN

Uploaded on: 24-12-2019

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 24-12-2019

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 24-12-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 24-12-2019

FOREST NOC

Uploaded on: 14-02-2020

FIRE SCHEME APPROVAL LETTER

Uploaded on: 14-02-2020

ANNEXURE-12-1-17 REVISED LOWER BASEMENT PLAN AND PARKING AREA CALCULATION

Uploaded on: 14-02-2020

ANNEXURE-12-1-21 REVISED UPPER BASEMENT PLAN AND PARKING CALCULATION

Uploaded on: 14-02-2020

LC IV

Uploaded on: 14-02-2020

SERVICE PLAN ESTIMATE LETTER

Uploaded on: 14-02-2020

ENVIRONMENT CLEARANCE

Uploaded on: 14-02-2020

ANNEXURE-12-1-11 COMMUNITY BUILDING GROUND FLOOR

Uploaded on: 14-02-2020

ANNEXURE-12-1-16 REVISED LOWER BASEMENT AREA CALCULATION

Uploaded on: 14-02-2020

ANNEXURE-12-2 SPECIFICATIONS

Uploaded on: 14-02-2020

ANNEXURE-12-1-15 COMMUNITY CENTER SECTION AND ELEVATION

Uploaded on: 14-02-2020

Statutory Approvals

BUILDING PLAN APPROVALDate: 22-08-2016Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: No
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: No
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO HUDA
SHOPPING AREASUBMITTED TO HUDA
RENEWABLE ENERGY SYSTEMSUBMITTED TO HUDA
SCHOOLSUBMITTED TO HUDA
HOSPITAL/DISPENSARYSUBMITTED TO HUDA
ANY OTHERSUBMITTED TO HUDA
SEWERAGE SCHEMEYET TO BE PREPARED
ROADSYET TO BE PREPARED
HORTICULTUREYET TO BE PREPARED
MAINTENANCE CHARGES FOR TEN YEARS INCLUDING RESURFACING OF ROADSYET TO BE PREPARED

NOC

ROADSProvider: HUDAApproval Status: Approved
WATER SUPPLYProvider: GURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYApproval Status: Approved
ELECTRICITYProvider: CHIEF EXECUTIVE ELECTRICAL HUDAApproval Status: Approved
SEWAGE DISPOSALProvider: GURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYApproval Status: Approved
STORM WATER DRAINAGEProvider: HUDAApproval Status: Approved

Project Team

Authorized Representative

RAHUL GUPTA
Name
RAHUL GUPTA
PAN
XXXX764H
Email
GUPTA.RAHUL4@mahindra.com
Mobile
9819259075
Landline
9958353331
Address
C-4 Janakpuri Rajouri Garden West Delhi Delhi - 110058

Managing Director/CEO

RAHUL GUPTA
Name
RAHUL GUPTA
PAN
XXXX764H
Email
GUPTA.RAHUL4@mahindra.com
Mobile
9819259075
Landline
9958353331
Address
C-4 Janakpuri Rajouri Garden West Delhi Delhi - 110058

Directors

RAHUL GUPTA
Name
RAHUL GUPTA
PAN
XXXX764H
Email
GUPTA.RAHUL4@mahindra.com
Mobile
9819259075
Landline
9958353331
Address
C-4 Janakpuri Rajouri Garden West Delhi Delhi - 110058

Contact Details

Project ContactEmail: HARYANA.RERAMHPL@mahindra.comMobile: 9958353331Landline: 9958353331
Project Contact PersonName: ANIKET KUMAREmail: kumar.aniket@mahindra.comMobile: 8527343510Landline: 9818249991

Land Details

Land Area2.77 (Acre)
Proposed FAR0.34
Permissible FAR1.75
Total Licensed Land17.55 (Acre)

Land Usage

Land Cost964.76 Lakhs
Other Cost876.24 Lakhs
Estimated Project Cost40727 Lakhs
Estimated Infrastructure Cost799.97 Lakhs
Estimated Apartment Construction Cost359.00 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other108.16
Shopping area14.59
Roads & Pavements81.42
Water Supply System203.66
Storm Water Drainage0
Parks and Playgrounds0
Renewable Energy System7.31
Electricity Supply System225
Security and Fire Fighting147.12
Clubhouse/community centres216.99
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Electricity Supply System--070.05
Other--070.1
Parks and Playgrounds--00
Roads & Pavements--05.94
Sewerage treatment & garbage disposal--016.05
Shopping area--00
Storm Water Drainage--075.56
Water Supply System--077.79
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System65.29---
Other52.34---
Parks and Playgrounds0---
Roads & Pavements8.62---
Sewerage treatment & garbage disposal19.45---
Shopping area0---
Storm Water Drainage7.73---
Water Supply System31.35---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEITALIAN MARBLE, LAMINATED WOODEN FLOORING, ANTI-SKID VITRIFIED TILE,
WALL FINISHING DETAILSLOW VOC ACRYLIC EMULSION PAINT
KITCHEN DETAILSMODULAR KITCHEN CABINET WITH GRANITE COUNTER TOP/ HOB, CHIMNEY
BATHROOM FITTINGSTOTO, GROHE OR EQUIVALENT
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESDOORS- HARDWOOD FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDE) BOTH SIDE LAMINATED FINISH FLUSH DOOR WITH HARDWOOD FRAME, WINDOWS- UPVC FRAMED DOUBLE GLAZING UNIT
GLASS WORKLAMINATED TOUGHENED GLASS IN BALCONIES, UPVC FRAMED DOUBLE GLAZING
ELECTRIC FITTINGSNA
CONDUCTING AND WIRING DETAILSNA
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSHIGH SPEED ELEVATORS- BY THYSSENKRUPP
EXTERNAL GLAZINGSLAMINATED TOUGHENED GLASS IN BALCONIES, UPVC FRAMED DOUBLE GLAZING
WINDOWS/GLAZINGSUPVC FRAMED DOUBLE GLAZING
DOORSDOORS- HARDWOOD FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDE) BOTH SIDE LAMINATED FINISH FLUSH DOOR WITH HARDWOOD FRAME,
MAIN DOORSDOORS- HARDWOOD FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDE)
INTERNAL DOORSDOORS- HARDWOOD FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDE) BOTH SIDE LAMINATED FINISH FLUSH DOOR WITH HARDWOOD FRAME,
AIR CONDITIONINGVRF SYSTEM
ELECTRICAL FITTINGSNA
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT FINISH
INTERNAL FINISHINGLOW VOC ACRYLIC EMULSION

Unit-wise Specifications

TOILET
FLOORANTI-SKID VITRIFIED TILES
WALLSVITRIFIED TILE UP TO FALSE CEILING,
CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING.
COUNTERSITALIAN MARBLE ON THE COUNTER
SANITARY WARE/CP FITTINGSTOTO OR EQUIVALENT
FIXTURESGROHE OR EQUIVALENT
KITCHEN
FLOORANTI-SKID VITRIFIED TILES
WALLSWALL TILES UP TO 2' 0" ABOVE THE COUNTER AND LOW VOC ACRYLIC EMULSION IN THE BALANCE AREA
CEILINGLOW VOC ACRYLIC EMULSION PAINT AND PART GYPSUM BOARD FALSE CEILING AS PER DESIGN
COUNTERSGRANITE COUNTER TOP
FIXTURESNA
KITCHEN APPLIANCESMODULAR KITCHEN CABINET WITH GRANITE COUNTER TOP/ HOB, CHIMNEY WILL BE PROVIDED.
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORLAMINATED WOODEN FLOOR
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT AND PART GYPSUM BOARD FALSE CEILING AS PER DESIGN
WARDROBESNA
MASTER TOILET
FLOORANTI-SKID VITRIFIED TILES
WALLSVITRIFIED TILE UP TO FALSE CEILING, WITH ITALIAN MARBLE ON THE COUNTER
CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING.
COUNTERSITALIAN MARBLE ON THE COUNTER
SANITARY WARE/CP FITTINGSTOTO OR EQUIVALENT
FITTING/FIXTURESGROHE OR EQUIVALENT
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOOR
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT AND PART GYPSUM BOARD FALSE CEILING AS PER DESIGN
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORITALIAN MARBLE
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT AND PART GYPSUM BOARD FALSE CEILING AS PER DESIGN
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORANTI-SKID VITRIFIED TILES
WALLS & CEILINGEXTERIOR GRADE PAINT OF APPROVED MAKE
TOILETNA
BALCONYSS HANDRAIL WITH LAMINATED TOUGHENED GLASS

Fee Details

Payment 1
amount:858585.10
cheque no:214568
draft date:25-07-2017
payable to:HRERA Gurugram
payee bank:STANDARD CHARTED BANK