NEWActive

Shapoorji Joyville Phase 5

GURUGRAM, GURGAON
16-04-2019
Launch Date
NEW
Type
2024-12-31
Completion Date

Overview

Launch Date

16-04-2019

Completion Date

2024-12-31

RERA ID

RERA-GRG-236-2019

Basic Details

Project NameShapoorji Joyville Phase 5
Project IDRERA-GRG-236-2019
Project TypeNEW
Applicant TypeCompany
Submission Date16-04-2019 08:11:45 AM
Builder NameJOYVILLE SHAPOORJI HOUSING PRIVATE LIMITED
CINU70109MH2007PTC166942
PANXXXX800E
Emailjitesh.bonde@shapoorji.com
Websitehttp://www.joyvillehomes.com
Phone (Mobile)9167645170
Phone (Landline)02267490000
Registered Address41/44 SP CENTRE MINNO DESAI ROAD COLABA MUMBAI 5
Project AddressVILLAGE - KHERKI,MAJRA HADUST - 52, SEC 102 ,GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameINDUSIND BANK, NARIMAN POINT MUMBAI
Account Number251220010016
IFSC CodeINDB0000006
MICR Code400234004
Branch Code000006

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Himanshu Jani b-102 whight arch Mathuradas road kandivali w near vajna wadi
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)-

Development Details

Land Area8.85 (Acre)
Proposed FAR2.5
Permissible FAR2.5
Total Licensed Land17.90 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS769.44
CONSTRUCTION OF ROADS13466.18
PAVEMENTS0
PARKS AND PLAYGROUNDS17349.63
GREEN BELTS728.29
VEHICLE PARKINGS3024.33
ELECTRICITY SUB-STATION493
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total35830.87

Cost Details

Land Cost2005 Lakhs
Other Cost4436 Lakhs
Estimated Project Cost12188 Lakhs
Estimated Infrastructure Cost353 Lakhs
Estimated Apartment Construction Cost5394 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 16-04-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 16-04-2019

ZONING PLAN

Uploaded on: 16-04-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 16-04-2019

DEMARCATION PLAN

Uploaded on: 16-04-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 16-04-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 29-06-2019

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 29-06-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 29-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 29-06-2019

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 29-06-2019

Statutory Approvals

BUILDING PLAN SANCTIONDate: 12-11-2018Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 20-08-2018Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATEDate: 04-02-2019Status: ALREADY BEEN OBTAINED
FIRE SCHEMEDate: 05-03-2019Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERAS PER PROJECT REPORT

NOC

ROADSProvider: ALL READY CONNECTEDApproval Status: Approved
WATER SUPPLYProvider: HUDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: N/AApproval Status: Approved
STORM WATER DRAINAGEProvider: HUDAApproval Status: Approved

Project Team

Authorized Representative

VINEET SALUJA
Name
VINEET SALUJA
PAN
XXXX544R
Email
vineet.saluja@shapoorji.com
Mobile
9811215950
Landline
02267490000
Address
SP centre 41 44 Minoo desai road colaba mumbai 5

Managing Director/CEO

SRIRAM MAHADEVAN
Name
SRIRAM MAHADEVAN
PAN
XXXX471E
Email
sriram.mahadevan@shapoorji.com
Mobile
9167358614
Landline
02267490000
Address
Flat No. 3504 Tower 1 Oakwood Runwal Greens Mulund Goregaon Link Road Bhandup W Mumbai - 400078

Directors

MUKESH TIWARI
Name
MUKESH TIWARI
PAN
XXXX544R
Email
db.mukesh@gmail.com
Mobile
9820788345
Landline
02267490000
Address
B1604-5 Julian Alps Bhakti Park Anik Wadala Link Road Wadala East Mumbai - 400037

Contact Details

Project ContactEmail: jitesh.bonde@shapoorji.comMobile: 9167645170Landline: 02267490000
Project Contact PersonName: VINEET SALUJAEmail: vineet.saluja@shapoorji.comMobile: 9811215950Landline: 02267490000

Land Details

Land Area8.85 (Acre)
Proposed FAR2.5
Permissible FAR2.5
Total Licensed Land17.90 (Acre)

Land Usage

Land Cost2005 Lakhs
Other Cost4436 Lakhs
Estimated Project Cost12188 Lakhs
Estimated Infrastructure Cost353 Lakhs
Estimated Apartment Construction Cost5394 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED OR LAMINATED WOODEN FLOORING OR CERAMIC TILE.
WALL FINISHING DETAILSOBD OR CERAMIC TILE
KITCHEN DETAILSKITCHEN COUNTER TOP – BLACK GRANITE. SINK – S.S. SINK WITHOUT DRAINBOARD.
BATHROOM FITTINGSCONCEALED BATHROOM FITTINGS.
WOOD WORK ETC-
DOORS AND WINDOS FRAMESDOOR FRAME : RED MIRANTI WITH PAINT WINDOW FRAME : ALUMINIUM - POWDER - COATED
GLASS WORKWINDOWS WITH CLEAR GLASS.
ELECTRIC FITTINGSALL SWITCHES AND SOCKETS WILL BE OF MODULAR TYPE - ANCHOR ROMA OR EQUIVALENT.
CONDUCTING AND WIRING DETAILSCONCEALED TYPE BELOW FALSE CEILING.
CUPBOARD DETAILS-
WATER STORAGENOT PROVIDE WITHIN THE FLATS.
LIFT DETAILS2NOS. PASSENGER AND 1 NOS. SERVICE ELEVATOR.
EXTERNAL GLAZINGS-
WINDOWS/GLAZINGSPOWDER - COATED ALUMINIUM WINDOW WITH CLEAR GLASS - 5 MM THICK
DOORSWOODEN FLUSH DOOR WITH LAMINATE ON BOTH SIDE.
MAIN DOORSWOODEN FLUSH DOOR WITH LAMINATE ON BOTH SIDE.
INTERNAL DOORSWOODEN FLUSH DOOR WITH LAMINATE ON BOTH SIDE.
AIR CONDITIONINGPROVISION FOR SPLIT AC IN BED ROOM AND LIVING ROOM.
ELECTRICAL FITTINGSALL SWITCHES AND SOCKETS WILL BE OF MODULAR TYPE - ANCHOR ROMA OR EQUIVALENT.
CNG PIPE LINEPROVISION FOR CNG PIPE LINE.
PROVISION OF WIFI AND BROADBAND FACILITYPROVISION OF WI-FI AND BROAD BAND FACILITY
EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR WALLS FINISHED WITH TEXTURED/WEATHER SHIELD PAYMENT
INTERNAL FINISHINGAS ABOVE DETAILED.

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES
CEILINGMODULAR FALSE CEILING
COUNTERS-
SANITARY WARE/CP FITTINGSSANITARY FIXTURES PROVIDED FROM SOMANY/CERA/JOHNSON OR EQUIVALENT. CP FITTINGS PROVIDED FROM JOHNSON / ESSCO/CERA OR EQUIVALENT
FIXTURESCONCEALED TYPE BELOW FALSE CEILING.
KITCHEN
FLOORVITRIFIED TILES
WALLSPROVISION OF DADO TILES WILL BE UPTO 600 MM ABOVE COUNTER TOP. BALANCE WALL SURFACE WILL BE FINISHED WITH GYPSUM PLASTER + OBD PAINT.
CEILINGOBD PAINT
COUNTERSBLACK GRANITE TOP.
FIXTURES-
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORCERAMIC TILE.
WALLS & CEILINGOBD
RAILINGS-
FIXTURES-
BED ROOMS
FLOORVITRIFIED TILE OR LAMINATED WOODEN FLOORING
WALLSOBD PAINT.
CEILINGOBD PAINT.
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES
CEILINGMODULAR FALSE CEILING
COUNTERS-
SANITARY WARE/CP FITTINGSSANITARY FIXTURES PROVIDED FROM SOMANY/CERA/JOHNSON OR EQUIVALENT. CP FITTINGS PROVIDED FROM JOHNSON / ESSCO/CERA OR EQUIVALENT.
FITTING/FIXTURESCONCEALED TYPE BELOW FALSE CEILING.
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILE OR LAMINATED WOODEN FLOORING
WALLSOBD PAINT.
CEILINGOBD PAINT.
MODULAR WARDROBES-
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILE
WALLSOBD PAINT.
CEILINGOBD PAINT.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:386485
cheque no:3886
draft date:15-04-2019
payable to:HRERA Gurugram
payee bank:AXIS BANK