Launch Date
Completion Date
RERA ID
28.71737224
77.3304441
Khasra No. 2099M and 2100M demarcated by its boundaries (latitude and longitude of the end points) 28.7175025 and 77.33011635 to the North, 28.71672614 and 77.33046239 to the South, 28.71719792 and 77.33063822 to the East, 28.71689653 and 77.32988107 to the West of village, Village Behta Hazipur Tehsil Loni Competant/ Development authority GDA District Ghaziabad PIN 201102 admeasuring 4055.17 sq. mtrs.
2.1 meters high boundary wall with 450 mm high brick and plaster wall and above 1650 mm high mild steel grill between two RCC columns approx, 4.5 meters center to center. The boundary wall shall be earthquake resistant.
All roads in the complex will be in combination of concrete pavers of different colors, shape, thickness, Roads will be laid over 225mm water bound macadam.
Not Applicable
Water supply from GDA shall be collected in underground collection tank and pumped to overhead water tank located at the top floor terrace.
Underground sewer systems provided. The sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plan (STP) of the project, from where the sewage will be used for irrigation and flushing purpose.
Underground drainage systems provided. Rain water shall be collected in drains having a minimum width of 150mm connected to the underground cement concrete pipeline. For discharge, water will be collected in man holes to be constructed in periphery of complex, and these man holes shall be finally connected with drain of GDA.
Lush green internal park will be provided and maintained.
The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the Project.
Electric supply provided through 11/0.415 KV transformers and by DG set supply for backup. External street lighting shall be through solar power with alternate supply through grid.
Not Applicable
Solid waste to be collected from individual flats and stores in garbage room in the basment. Recyclable shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through approved agents.
Solid waste to be collected from individual flats and stored in garbage room in the basement. Recyclable shall be processed in the compost machine to make compost. Non cyclable waste shall be disposed of through approved agents of Greater Noida Authority.
Rain water harvesting pit shall be provided for ground water recharging and overflow to be discharges in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Energy management system with dual meters are provided.
Fire fighting system shall be provided for all building as per the prevailing requirements of National Building Code. Sprinkler shall be provided in all common areas, basement and inside the individual apartment. Smoke detecters, fire doors shall be provided in common areas. Water supply to sprinklers and hydrants shall be from fire pimps located in the basement.
Common social infrastructure shall be provided.
Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
Not Applicable.
Showing 1 blocks with 117 units
Total Carpet Area
7178.41 m²
77267.69 ft²
Total Units
127
2 different types
Blocks & Floors
1
11 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4077.15 m²
43886.03 ft²