Launch Date
Completion Date
RERA ID
28.703771
77.421331
Not applicable
2100 mm high, along entire periphery.(Column & beam RCC and Pannel Brick works)
RCC Trimix
UNI COBLE STONE TILE
OHT OF DOMESTIC TANK ARE AS FOLLOWINGS :Tower P - NA
Underground system using RCC HUME Sewer pipes.
Underground system using RCC HUME pipes.
Parks having total area of 3358.68 sq. m. shall be provided.
112 Nos. trees are to be planted out of that 50% will be evergreen tree.
Two Electricity Transformers of 2000 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage .
Built up area of community buildings shall be 771.40 sq. m.
STP of capacity 500 KLD shall be provided. Treated water shall be used for flushing, irrigation, pathways cleaning and excess sewage shall be discharged in the municipal sewer.
Manual collection and organic waste converter shall be provided.
4 No. sets of RECHARG & DESILITING CHAMBER shall be provided.
Solar panels shall be provided on terrace for renewable energy. 30.92 kw solar backup has been proposed. Single point metering will be there for energy purchased from the grid/ power supply company.
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and UGT of Fire tank capacity 500KL (common) and OHT of Fire tank capacity 10KL (each block) shall be provided as per NBC & NOC from fire depp.
STP, organic waste converter shall be provided.
Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per NBC.
Not Applicable
Showing 1 blocks with 143 units
Total Carpet Area
8721.88 m²
93881.44 ft²
Total Units
143
2 different types
Blocks & Floors
1
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
76379.00 m²
822135.92 ft²