OngoingActive

INTEGRITY (Phase - 2: Tower N & O)

Ghaziabad, Uttar Pradesh
22-07-2015
Launch Date
Ongoing
Type
19-03-2022
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

19-03-2022

RERA ID

UPRERAPRJ5611

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)5559
Project NameINTEGRITY (Phase - 2: Tower N & O)
Registration Fee (in Rs.)33000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)80
DistrictGhaziabad
Original Start Date20-07-2013
TehsilGhaziabad
Proposed Start Date22-07-2015
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)10800.00
Proposed Completion Date19-03-2022

Location

Latitude

28.703466

Longitude

77.422011

Bank Details

Account no.081605004614
Name Of Account HolderAJNARA INDIA LIMITED
Bank NameICICI Bank
Branch AddressH1/34, SECTOR-63, NOIDA
Branch NameNOIDA SEC-63
IFSC CodeICIC0000816

Development Works

Demarcation of Plots

Not applicable

Boundary Wall

2100 mm high, along entire periphery.(Column & beam RCC and Pannel Brick works)

Road Work

RCC Trimix

Footpaths

UNI COBLE STONE TILE

Water Supply Including Drinking Water Facilities

OHT OF DOMESTIC TANK ARE AS FOLLOWINGS :Tower N - 30 KL Tower O - NA

Sewer System

Underground system using RCC HUME Sewer pipes.

Drain

Underground system using RCC HUME pipes.

Parks

Parks having total area of 3358.68 sq. m. shall be provided.

Tree Planting

112 Nos. trees are to be planted out of that 50% will be evergreen tree.

Design For Electric Supply Including Street Lighting

Two Electricity Transformers of 2000 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage .

Community Buildings

Built up area of community buildings shall be 771.40 sq. m.

Treatment and Disposal System of Sewage and Sullage water

STP of capacity 500 KLD shall be provided. Treated water shall be used for flushing, irrigation, pathways cleaning and excess sewage shall be discharged in the municipal sewer.

Solid Waste Management And Disposal System

Manual collection and organic waste converter shall be provided.

Water Conservation System

4 No. sets of RECHARG & DESILITING CHAMBER shall be provided.

Energy Management System Including Use of Renewable Energy

Solar panels shall be provided on terrace for renewable energy. 30.92 kw solar backup has been proposed. Single point metering will be there for energy purchased from the grid/ power supply company.

Fire Protection And Fire Safety System

Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and UGT of Fire tank capacity 500KL (common) and OHT of Fire tank capacity 10KL (each block) shall be provided as per NBC & NOC from fire depp.

Social Infrastructure And Other Public Amenities Including Public Health Services

STP, organic waste converter shall be provided.

Emergency Evacuation Services

Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per NBC.

Other Miscellaneous Work

Not Applicable

Documents

Registry Document

No: 465 | Date: 20-01-2010

Registry Document

No: 5780 | Date: 08-05-2006

Registry Document

No: 5788 | Date: 08-05-2006

Registry Document

No: 57881311 | Date: 03-02-2006

Registry Document

No: 1685 | Date: 15-02-2008

Registry Document

No: 2834 | Date: 09-04-2007

Registry Document

No: 195 | Date: 10-01-2011

Other Plan(If Any)

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Affidavit

Details of Encumbrances

Uploaded: 17-07-2019

Commencement Certificate

Uploaded: 20-07-2018

Waste Disposal Plan

Uploaded: 20-07-2018

Water Supply Plan

Uploaded: 20-07-2018

Electricity Supply Plan

Uploaded: 20-07-2018

Development Work Plan

Uploaded: 20-07-2018

CA CERTIFICATE

Uploaded: 30-07-2018

ARCHITECT CERTIFICATE

Uploaded: 30-07-2018

ENGINEERS CERTIFICATE

Uploaded: 30-07-2018

Affidavit

Uploaded: 30-07-2017

Authentic copy of Approval of Project

Uploaded: 30-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 30-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 30-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 30-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 30-07-2017

Floor plans of all types

Uploaded: 30-07-2017

Floor plans of all types

Uploaded: 30-07-2017

Floor plans of all types

Uploaded: 30-07-2017

Floor plans of all types

Uploaded: 30-07-2017

Proforma of Application Form

Uploaded: 30-07-2017

Proforma of Allotment Letter

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Permits

Orignal Permit No141/GH/Zone-1/14-15
Orignal Permit Date22-07-2015
Valid Upto22-07-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto22-07-2023
End Date31-12-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Inhouse
Contractor AddressInhouse
Architect NameAR. VISHAL MITTAL
Architect AddressSPACE DESIGNERS INTERNATION, B-34, SECTOR-67, NOIDA
Architect Licence NumberCA/98/23185
Structural Engineer NameSDAC ENGINEERS (INDIA)
Structural Engineer AddressPlot No. 62, Sector - 5, Vaishali, Ghaziabad
Mobile number(Project Co-ordinator)9582006011

Land Details

AFS

Showing 2 blocks with 238 units

Property Summary

Total Carpet Area

20894.04 m²

224901.36 ft²

Total Units

356

2 different types

Blocks & Floors

2

24 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:58.69 m²
Balconies:712
Parking ratio:0.00 per unit

Block TOWER N

142 units

Block TOWER O

96 units

Khasra Details

Total Area

76379.00 m²

822135.92 ft²

7 plots
Khasra
TypeKhasra
Khasra/Plot No977
Area(In Sq. Mt.)1343
Khasra
TypeKhasra
Khasra/Plot No978
Area(In Sq. Mt.)2270
Khasra
TypeKhasra
Khasra/Plot No979
Area(In Sq. Mt.)2360
Khasra
TypeKhasra
Khasra/Plot No981
Area(In Sq. Mt.)50576
Khasra
TypeKhasra
Khasra/Plot No983
Area(In Sq. Mt.)5060
Khasra
TypeKhasra
Khasra/Plot No1049
Area(In Sq. Mt.)4930
Khasra
TypeKhasra
Khasra/Plot No1050
Area(In Sq. Mt.)9840

Other Details

Contractor Name (if any)Inhouse
Contractor AddressInhouse
Architect NameAR. VISHAL MITTAL
Architect AddressSPACE DESIGNERS INTERNATION, B-34, SECTOR-67, NOIDA
Architect Licence NumberCA/98/23185
Structural Engineer NameSDAC ENGINEERS (INDIA)
Structural Engineer AddressPlot No. 62, Sector - 5, Vaishali, Ghaziabad
Mobile number(Project Co-ordinator)9582006011