Total Units
380
2 unit types
Carpet Area
3,60,133 ft²
33,457.44 m² · carpet only, excludes balcony
Blocks & Floors
3
77 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 948 ft² (88.05 m²)Balconies 546Parking per unit 0.007 of 188 rows list no units (7 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 188 rows · 9 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal | Verandahs | Verandah Areatotal |
|---|---|---|---|---|---|---|---|---|
| Tower 1 | 2 | 3 BHK | 1 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 2 | 3 BHK | 1 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 2 | 3 BHK | 1 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | 2 | 250 ft²23.23 m² |
| Tower 1 | 3 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 3 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 2 | 3 BHK | 1 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | 1 | 150 ft²13.94 m² |
| Tower 1 | 4 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 4 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 5 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 5 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 6 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 6 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 7 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 7 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 8 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 9 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 9 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 10 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 10 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 11 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 11 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 12 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 12 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 13 | OTHER | — | — | — | — | — | — |
| Tower 1 | 14 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 14 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 15 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 15 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 16 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 16 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 17 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 17 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 18 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 18 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 20 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 20 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 21 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 21 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 22 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 23 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 23 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 24 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 24 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 25 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 25 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 26 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 26 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 1 | 27 | 3 BHK | 2 | 1,162 ft²107.95 m² | 3 | 510 ft²47.38 m² | — | — |
| Tower 1 | 27 | 3 BHK | 2 | 966 ft²89.74 m² | 4 | 285 ft²26.48 m² | — | — |
| Tower 2 | 2 | 3 BHK | 2 | 831 ft²77.20 m² | 4 | 265 ft²24.62 m² | — | — |
Total Plot Area
2.19 acres
8,875.00 m² · plot area
8875sqm Plot will demarcated by MS Poles and GI sheet as per the Possession plan provided by Ghaziabad development authority.
The length of boundary wall will be 375M (approx ).It will be constructed as per sanctioned plan having RCC columns, walls and MS grills up to 1800M Height on rear and side face. 900mm high grill towords commercial plaza. Appearance as per Elevation . CCTV for secutity reason.
The length of road will be 280 M ( approx ) of various width. The road work will be done as per sanctioned plan made up for rcc trimix, paver abs stone etc. Surface durability as per fire tender movement.
The average width of pathway be 1500mm. the pathways, walkways be constructed with RCC, Paver and Stone etc.
The capacity of OHT and UGT will be approx 5,50000 Ltr. The water supply system includes UGT/OHT/ Pipeline/ water supply pumps feeding lines and PRV etc. The water supply shall be filter media and activated carbon
The length of sewer system will be 115M (approx) of various( 110 to 350 mm dia ) sizes. The sewer system includes sewer line main holes waste pipeline. This will be a gravity system and it will be hanging in basement and the sewer water will be treated with STP of 190 KLD and treated water will be used for flushing and gardening purpose
The drain length will be 400m ( approx )of various sizes of DWC and PVC pipes. the drainage system will be constructed with pipes and main holes as per services plans. the excess water will be disposed in local deains
The area in park will be approximate 14000 sqft (approx) The park will be develop as per land scape plan includind trees, bushes seasonal plants and grass. with water features and public sitting ares.
Total 90 trees of various type will be planted as per EC requirement the spacing of tree will be 55 m c/c and as per landscaping plans. the maintenance agency will be deployed for its maintenance
Total 3300KVA transformers ( 3nis) will be installed for electricity supply for the project. The design of electricity supply including LED street lights ( approx 40 nos ) shall be done as per UPPCL guidelines. liiumination design will be as per norms.
The cluv area will be approx 25000 sqft. the community building shall be constructed as per sanctioned plan which include hall children play area gym, yoga, public toilets, entrance lobby etc.
The sewage generated in the project shall be treated in STP of 190 KLD a ( MBBR Technology) and recycle water will be used in flushing and landscaping
Appoximate 1035kg municipal water will be generated from the project the solid water management and disposal shall be sone as per EC guidelines. including segregation .
The rain water harvesting (3 number of 24.75 cubic meter shall be done as per EC norms to recharge ground water table the low flow water fixtures will be used for conservation of water.
The energy management shall be done as per ECBC regulations including online roof top solar system ( 65KWp) for basement lighting with grid integrations.
The fire protection detection and alarm system shall be done as per NOC of UP FIRE Department which included fire sprinkler fire panels fire pumps and fire alram system etc. 10 fire hydrant external and 89 internal hydrant with sprinkler system in each unit common area. fire prevention and suppression system will be in auto mode.
The community hall children play area, gym, TT room, Swimming pool, walking track ect, 1 Public toilets is proposed for Domestic helps and drivers on ground level. Lifts will be disable friendly shall be developed in this project.
The emergency evacuation plan including fire staircase (1 in each tower) 1 no Refuse area in each tower with fire pathways shall be developed as per Fire NOC which include fire Exit sings and fire alarm system.
This is GRIHA per certified green building having STP, OWC, Low Flow water fixtures for reducing water and electricity requirement. About 125 CCTV will be installed as per project requirement.
Hummingbird is located in Ghaziabad.
Yes. Hummingbird is registered under UPRERAPRJ397361/10/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Hummingbird is 31 December 2032.
Hummingbird is developed by BLACK OPAL VENTURES LLP.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.