Total Units
554
2 unit types
Carpet Area
1,14,660 ft²
10,652.25 m² · carpet only, excludes balcony
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 207 ft² (19.23 m²)Balconies 0Parking per unit 0.00
All blocks
Showing 50 of 197 rows · 5 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit |
|---|---|---|---|---|
| Block B | GF | SHOP | 1 | 379 ft²35.18 m² |
| Block B | GF | SHOP | 1 | 248 ft²23.04 m² |
| Block B | GF | SHOP | 1 | 656 ft²60.99 m² |
| Block B | GF | SHOP | 1 | 629 ft²58.40 m² |
| Block B | GF | SHOP | 1 | 73 ft²6.81 m² |
| Block B | GF | SHOP | 1 | 369 ft²34.24 m² |
| Block B | GF | SHOP | 1 | 379 ft²35.23 m² |
| Block B | GF | SHOP | 1 | 309 ft²28.72 m² |
| Block B | GF | SHOP | 1 | 297 ft²27.62 m² |
| Block B | GF | SHOP | 1 | 271 ft²25.18 m² |
| Block B | GF | SHOP | 6 | 96 ft²8.96 m² |
| Block B | GF | SHOP | 1 | 103 ft²9.58 m² |
| Block B | GF | SHOP | 4 | 96 ft²8.94 m² |
| Block B | GF | SHOP | 4 | 111 ft²10.28 m² |
| Block B | GF | SHOP | 4 | 87 ft²8.12 m² |
| Block B | GF | SHOP | 1 | 114 ft²10.60 m² |
| Block B | GF | SHOP | 1 | 118 ft²10.96 m² |
| Block B | GF | SHOP | 3 | 87 ft²8.04 m² |
| Block B | GF | SHOP | 4 | 66 ft²6.15 m² |
| Block B | GF | SHOP | 1 | 83 ft²7.74 m² |
| Block B | GF | SHOP | 3 | 84 ft²7.80 m² |
| Block B | GF | SHOP | 2 | 73 ft²6.75 m² |
| Block B | GF | SHOP | 3 | 73 ft²6.79 m² |
| Block B | GF | SHOP | 1 | 78 ft²7.25 m² |
| Block B | GF | SHOP | 5 | 73 ft²6.80 m² |
| Block B | GF | SHOP | 1 | 140 ft²13.01 m² |
| Block B | GF | SHOP | 2 | 111 ft²10.29 m² |
| Block B | GF | SHOP | 13 | 115 ft²10.67 m² |
| Block B | GF | SHOP | 2 | 117 ft²10.84 m² |
| Block B | GF | SHOP | 9 | 116 ft²10.75 m² |
| Block B | GF | SHOP | 2 | 112 ft²10.38 m² |
| Block B | GF | SHOP | 4 | 127 ft²11.79 m² |
| Block B | GF | SHOP | 13 | 99 ft²9.17 m² |
| Block B | GF | SHOP | 3 | 152 ft²14.12 m² |
| Block B | GF | SHOP | 3 | 74 ft²6.86 m² |
| Block B | GF | SHOP | 1 | 108 ft²10.01 m² |
| Block B | GF | SHOP | 1 | 76 ft²7.04 m² |
| Block B | GF | SHOP | 1 | 126 ft²11.70 m² |
| Block B | GF | SHOP | 3 | 126 ft²11.71 m² |
| Block B | GF | SHOP | 1 | 217 ft²20.19 m² |
| Block B | GF | SHOP | 1 | 115 ft²10.70 m² |
| Block B | GF | SHOP | 5 | 115 ft²10.66 m² |
| Block B | GF | SHOP | 1 | 149 ft²13.85 m² |
| Block B | GF | SHOP | 1 | 119 ft²11.05 m² |
| Block B | GF | SHOP | 1 | 119 ft²11.02 m² |
| Block B | GF | SHOP | 12 | 114 ft²10.57 m² |
| Block B | GF | SHOP | 1 | 77 ft²7.11 m² |
| Block B | GF | SHOP | 1 | 84 ft²7.81 m² |
| Block B | GF | SHOP | 1 | 164 ft²15.26 m² |
| Block B | GF | SHOP | 2 | 82 ft²7.60 m² |
Total Plot Area
3.15 acres
12,730.00 m² · plot area
Not Applicable
1800 mm wall in brick massonery along with the entire periphery on RCC footing and column structure
Providing and laying of Interlocking Pavers/ Trimix over well compacted subgrade layers
Providing and laying of Interlocking Pavers/ Chequered Tiles over well compacted subgrade layers
One Underground Tank of 180 KLD and laying of pipes as per MEP designs with manholes of required size
Underground System using uPVC (SN-4) Sewer pipes and making of manholes of required brick massonery with manhole covers
Underground System using uPVC(SN-4) pipes and making of manholes of required civl massonery work
Parks having total area of 1105 sq. meters shall be provided
110 nos. trees are to be planted out of that 55 will be evergreen tree
Three Electricity Transformers of 1500 KVA capacity each shall be used along with necessary stich gear for distributing electricity at LT voltage/ as per requirement
Not Applicable
STP of capacity 150 KLD shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in municipal sewer
treated water shall be used for manual collection and organic waste converter shall be provided in the project
Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company
Fire tender path shall be provided as per NBC fire fighting systems along with pumps and water storage tanks shall be provided as per NBC and NOC from fire department
Not Applicable
Staircase shall be provided in basement and all the towers for fire/ emergency exit as per norms
Not Applicable
Himalaya City Center Phase-1 is located in Ghaziabad.
Yes. Himalaya City Center Phase-1 is registered under UPRERAPRJ728824 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Himalaya City Center Phase-1 is 31 December 2024.
Himalaya City Center Phase-1 is developed by R B INFRAESTATE PVT. LTD..
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.