NEWActive

HIGHTOWN

GURUGRAM, GURGAON
16-01-2020
Launch Date
NEW
Type
2025-10-11
Completion Date

Overview

Launch Date

16-01-2020

Completion Date

2025-10-11

RERA ID

RERA-GRG-337-2019

Basic Details

Project NameHIGHTOWN
Project IDRERA-GRG-337-2019
Project TypeNEW
Applicant TypeCompany
Submission Date16-01-2020 10:18:52 AM
Builder NameSILVERGLADES INFRASTRUCTURE PRIVATE LIMITED
CINU45201DL2005PTC138897
PANXXXX157A
Emailcs@silverglades.com
Websitehttp://www.silverglades.com/
Phone (Mobile)9899987678
Phone (Landline)01244550300
Registered Address404, NIRMAL TOWER, 26, BARAKHAMBA ROAD, NEW DELHI-110001
Project AddressREVENUE ESTATE OF VILLAGE SUKHRALI, SECTOR 28
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameYES BANK GROUND FLOOR, UNIT 004, UNITECH TRADE CENTER, SUSHANT LOK 1, GURUGRAM
Account Number016166200000076
IFSC CodeYESB0000161
MICR Code110532033
Branch Code000161

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Pradeep Jain, Address: H. No. F63A, Radhe Mohan Drive, Fathepur Beri, New Delhi-10074 along with any one of Mr. Mangi Lal Dagar, Address: H-2/45, Bengali Colony, Mahavir Enclave, Palam Gaon, Dabri, Delhi-110045 Mr. Abha Jain, Address: H. No. F63A, Radhe Mohan Drive, Fathepur Beri, New Delhi-10074 Mr. Sandeep Handa, Address: 2046, Pocket-2, Sector-D, Vasant Kunj, New Delhi-110070
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Not specified

Development Details

Land Area19627.174 (Sqr/mtrs)
Proposed FAR362
Permissible FAR362
Total Licensed Land19627.174 (Sqr/mtrs)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7100.558
CONSTRUCTION OF ROADS7930.4296
PAVEMENTS0
PARKS AND PLAYGROUNDS2947.7299
GREEN BELTS0
VEHICLE PARKINGS276.00
ELECTRICITY SUB-STATION0
CLUB HOUSE1292.505
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER80.00
Total19627.2225

Cost Details

Land Cost6598 Lakhs
Other Cost10296.14 Lakhs
Estimated Project Cost52361.14 Lakhs
Estimated Infrastructure Cost5102 Lakhs
Estimated Apartment Construction Cost30365 Lakhs

Documents

NON -ENCUMBRANCE CERTIFICATE

Uploaded on: 04-11-2020

TAN SIPL

Uploaded on: 04-11-2020

POWER LOAD APPROVAL -28

Uploaded on: 04-11-2020

LICENSE-28 RENEWED

Uploaded on: 04-11-2020

ELECTRICAL LOAD NOC

Uploaded on: 04-11-2020

MOA

Uploaded on: 04-11-2020

ENVIRONMENT NOC- HIGHTOWN

Uploaded on: 04-11-2020

LICENSE RENEWAL 14.7.20

Uploaded on: 04-11-2020

TOD LOI- HIGHTOWN

Uploaded on: 04-11-2020

TOD APPROVAL

Uploaded on: 04-11-2020

LOI -HIGHTOWN

Uploaded on: 04-11-2020

AOA

Uploaded on: 04-11-2020

LC-IV

Uploaded on: 04-11-2020

GRIHA APPROVAL-HIGHTOWN

Uploaded on: 04-11-2020

COLLABORATION AGREEMENT

Uploaded on: 04-11-2020

GST CERTIFICATE SIPL

Uploaded on: 04-11-2020

LICENSE WITH LAND DETAILS-28

Uploaded on: 04-11-2020

WATER FOR CONSTRUCTION-28

Uploaded on: 04-11-2020

BALANCE SHEET_SGI_2017-18-19

Uploaded on: 04-11-2020

ELECTRICAL PLAN ESTIMATE

Uploaded on: 04-11-2020

BR-III

Uploaded on: 26-11-2020

ZONING PLAN

Uploaded on: 11-01-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 11-01-2020

DEMARCATION PLAN

Uploaded on: 11-01-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 11-01-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 11-01-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 11-01-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 13-01-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 11-01-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 11-01-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 04-11-2020

NOC FOREST DEPARTMENT- HIGHTOWN

Uploaded on: 04-11-2020

TOWER C 4TH-23RD, TYPICAL FLOOR PLAN (EXCEPT 16TH FLOOR) AND AREA DIAGRAM

Uploaded on: 23-02-2021

INVENTORY DETAILS- RESIDENTIAL_HIGHTOWN_TOWER B

Uploaded on: 20-02-2021

INVENTORY DETAILS- RESIDENTIAL_HIGHTOWN_TOWER C

Uploaded on: 20-02-2021

INVENTORY DETAILS- RESIDENTIAL_HIGHTOWN_TOWER A

Uploaded on: 20-02-2021

AGREEMENT TO SALE

Uploaded on: 20-02-2021

AIRPORT AUTHORITY NOC- HIGHTOWN

Uploaded on: 20-02-2021

ALLOTMENT LETTER

Uploaded on: 20-02-2021

APPLICATION FOR FIRE APPROVAL

Uploaded on: 20-02-2021

APPROVAL SEWERAGE

Uploaded on: 20-02-2021

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 20-02-2021

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 20-02-2021

REVISED_EC_UNDER TOD

Uploaded on: 20-02-2021

SERVICE PLAN ESTIMATE

Uploaded on: 20-02-2021

STORM WATER APPLICATION

Uploaded on: 20-02-2021

1ST BASEMENT PARTIAL FLOOR PLAN AND AREA CALCULATION

Uploaded on: 22-02-2021

2ND BASEMENT PARTIAL FLOOR PLAN AND AREA CALCULATION

Uploaded on: 22-02-2021

3RD BASEMENT PARTIAL FLOOR PLAN AND AREA CALCULATION

Uploaded on: 22-02-2021

COMMERCIAL BLOCK ELEVATIONS

Uploaded on: 22-02-2021

EWS 5TH TO TERRACE FLOOR PLAN AND AREA CALCULATION

Uploaded on: 22-02-2021

EWS FRONT ELEVATION AND CROSS SECTION

Uploaded on: 22-02-2021

EWS PARKING AREA CALCULATION

Uploaded on: 22-02-2021

EWS STILT TO 1ST FLOOR PLAN AND AREA CALCULATION

Uploaded on: 22-02-2021

GREEN AREA CALCULATION

Uploaded on: 22-02-2021

GROUND COVERAGE CALCULATION

Uploaded on: 22-02-2021

TOWER A 1-26 TYPICAL FLOOR AREA DIAGRAM

Uploaded on: 22-02-2021

TOWER A 1-26 TYPICAL FLOOR PLAN (EXCEPT 17TH & 25TH FLOOR) REFUGE LEVEL

Uploaded on: 22-02-2021

TOWER A 1-26 TYPICAL FLOOR PLAN (EXCEPT 17TH & 25TH FLOOR)

Uploaded on: 22-02-2021

TOWER A 27TH FLOOR PLAN(PENTHOUSE LEVEL-I) AREA DIAGRAM

Uploaded on: 22-02-2021

TOWER A 27TH FLOOR PLAN(PENTHOUSE LEVEL-I)

Uploaded on: 22-02-2021

TOWER A 28TH FLOOR PLAN(PENTHOUSE LEVEL-2) & AREA DIAGRAM

Uploaded on: 22-02-2021

TOWER A FRONT ELEVATION

Uploaded on: 22-02-2021

TOWER A GF PLAN & COMMUNITY BLDG AREA DIAGRAM

Uploaded on: 22-02-2021

TOWER A SECTION A

Uploaded on: 22-02-2021

TOWER A SIDE ELEVATION

Uploaded on: 22-02-2021

TOWER B 24TH FLOOR PLAN AND AREA CALCULATION

Uploaded on: 22-02-2021

TOWER C (COMMERCIAL BLOCK) 7TH & 8TH TYPICAL FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER A- TERRACE, MUMTY & OHWT LEVEL PLAN

Uploaded on: 22-02-2021

TOWER A UNIT CARPET AREA CALCULATION

Uploaded on: 22-02-2021

TOWER B & C FRONT ELEVATION

Uploaded on: 22-02-2021

TOWER B & C SECTION

Uploaded on: 22-02-2021

TOWER B & C SIDE ELEVATION

Uploaded on: 22-02-2021

TOWER B & C UNIT CARPET AREA CALCULATION

Uploaded on: 22-02-2021

TOWER B 1ST-23RD, TYPICAL FLOOR PLAN (EXCEPT 16TH FLOOR) AND AREA CALCULATION

Uploaded on: 22-02-2021

TOWER B 16TH FLOOR PLAN REFUGE LEVEL AND AREA CALCULATION

Uploaded on: 22-02-2021

TOWER B 16TH FLOOR PLAN REFUGE LEVEL AND AREA DIAGRAM

Uploaded on: 22-02-2021

TOWER B 25TH FLOOR PLAN AND AREA CALCULATION

Uploaded on: 22-02-2021

TOWER B 26TH FLOOR LEVEL PLAN AND AREA CALCULATION

Uploaded on: 22-02-2021

TOWER B GF PLAN & AREA CALCULATION

Uploaded on: 22-02-2021

TOWER B- TERRACE, MUMTY & OHWT LEVEL PLAN

Uploaded on: 22-02-2021

TOWER C (COMMERCIAL BLOCK) 2NDFLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) 3RD FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) 4TH FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) 6TH FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) 9TH FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) SECTION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) TERRACE PLAN AND CARPET AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) 1ST FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) 5TH FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) GROUND FLOOR AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C (COMMERCIAL BLOCK) GROUND FLOOR PLAN

Uploaded on: 23-02-2021

TOWER C 24TH FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C 25TH FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C 26TH FLOOR LEVEL PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C GF PLAN & AREA CALCULATION

Uploaded on: 23-02-2021

TOWER C- TERRACE, MUMTY & OHWT LEVEL PLAN

Uploaded on: 23-02-2021

TOWER C_1ST TO 3RD TYPICAL FLOOR PLAN AND AREA CALCULATION

Uploaded on: 23-02-2021

SITE PLAN (PHE)_COMPRESSED

Uploaded on: 23-02-2021

SITE PLAN

Uploaded on: 23-02-2021

Statutory Approvals

TOD APPROVALDate: 19-08-2019Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCEDate: 14-09-2020Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 11-08-2015Status: ALREADY BEEN OBTAINED
WATER SUPPLYDate: 07-03-2018Status: ALREADY BEEN OBTAINED
ELECTRICAL LOAD AVAILABILITYDate: 17-01-2020Status: ALREADY BEEN OBTAINED
LICENSE APPROVALDate: 27-12-2013Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 19-08-2019Status: ALREADY BEEN OBTAINED
BUILDING PLAN/ SITE PLAN APPROVALDate: 12-10-2020Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 01-02-2021Status: ALREADY BEEN OBTAINED
SEWAGE DISPOSALDate: 19-01-2021Status: APPLIED FOR BUT YET TO RECEIVE
FIRE SCHEME APPROVALDate: NAStatus: APPLIED FOR BUT YET TO RECEIVE
SERVICE PLAN ESTIMATES APPROVALDate: NAStatus: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO TOWN & COUNTRY PLANNING
WATER SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
STORM WATER DRAINAGESUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO TOWN & COUNTRY PLANNING
STREET LIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
SECURITY AND FIRE FIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
PLAYGROUNDS AND PARKSSUBMITTED TO TOWN & COUNTRY PLANNING
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO TOWN & COUNTRY PLANNING
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGSUBMITTED TO TOWN & COUNTRY PLANNING
UNDERGROUND WATER TANKSUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICAL SUB STATIONSUBMITTED TO TOWN & COUNTRY PLANNING
STPSUBMITTED TO TOWN & COUNTRY PLANNING
RAIN WATER HARVESTINGSUBMITTED TO TOWN & COUNTRY PLANNING
PLANTATION OF ROAD SIDE TRESSSUBMITTED TO TOWN & COUNTRY PLANNING
SERVICES AND RESURFACING OF ROADSSUBMITTED TO TOWN & COUNTRY PLANNING

NOC

ROADSProvider: N/AApproval Status: Pending
WATER SUPPLYProvider: EE HSVP, DIV III, GURUGRAMApproval Status: Approved
ELECTRICITYProvider: EE, DHBVN, GURUGRAMApproval Status: Pending
SEWAGE DISPOSALProvider: COMMISSIONER, MCGApproval Status: Approved
STORM WATER DRAINAGEProvider: COMMISSIONER, MCG (APPLIED)Approval Status: Pending
ELECTRICAL LOAD AVAILABILITYProvider: DHBVN, GURUGRAMApproval Status: Approved

Project Team

Authorized Representative

HARSH KUMAR GUPTA
Name
HARSH KUMAR GUPTA
PAN
XXXX585H
Email
harshkumargupta@gmail.com
Mobile
9899987678
Landline
N/A
Address
402 GH-26 Rainbow Apartment Sector-43 Gurugram-122009

Managing Director/CEO

NA
Name
NA
PAN
XXXX9999
Email
NA@gmail.com
Mobile
9999999999
Landline
N/A
Address
NA

Directors

HARSH KUMAR GUPTA
Name
HARSH KUMAR GUPTA
PAN
XXXX585H
Email
harshkumargupta@gmail.com
Mobile
9899987678
Landline
N/A
Address
402 GH-26 Rainbow Apartment Sector-43 Gurugram-122009
KAMAL SAINI
Name
KAMAL SAINI
PAN
XXXX723K
Email
kamalsaini1974@rediffmail.com
Mobile
9300050501
Landline
N/A
Address
H No.145 Gali No. 05Pandav Nagar Chilla Saroda KhadarPatparganj East Delhi-110091

Contact Details

Project ContactEmail: cs@silverglades.comMobile: 9810297757Landline: 01244550300
Project Contact PersonName: VIKAS AGGARWALEmail: cs@silverglades.comMobile: 9810297757Landline: 01244550300

Land Details

Land Area19627.174 (Sqr/mtrs)
Proposed FAR362
Permissible FAR362
Total Licensed Land19627.174 (Sqr/mtrs)

Land Usage

Land Cost6598 Lakhs
Other Cost10296.14 Lakhs
Estimated Project Cost52361.14 Lakhs
Estimated Infrastructure Cost5102 Lakhs
Estimated Apartment Construction Cost30365 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other32
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0027.555
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other27.50035
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other357000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other183.25720.641007.091340.04
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System0---
Other0---
Parks and Playgrounds0---
Roads & Pavements0---
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSECOMBINATION OF LAMINATED WOODEN FLOORING , NATURAL STONE & TILES
WALL FINISHING DETAILSCOMBINATION OF ACRYLIC EMULSION PAINT , POP PUNNING
KITCHEN DETAILSANTISLIP VITRIFIED TILES;ACRYLIC EMULSION PAINT, GRANITE STONE COUNTER, SINGLE LEVER CP FITTINGS &DOUBLE BOWL SS SINK WITH DRAIN BOARD,HOB AND CHIMNEY, MODULAR KITCHEN CABINETRY
BATHROOM FITTINGSVANITIES WITH MIRROR, SINGLE LEVER CP FITTINGS WITH WASH BASIN & EUROPEAN WC
WOOD WORK ETCMODULAR KITCHEN CABINETRY
DOORS AND WINDOS FRAMESHARDWOOD DOOR FRAME FOR INTERNAL DOORS
GLASS WORKN/A
ELECTRIC FITTINGSMODULAR SWITCHES
CONDUCTING AND WIRING DETAILSUPVC CONDUITING WITH WIRING
CUPBOARD DETAILSMODULAR KITCHEN
WATER STORAGEOHT AT PROJECT LEVEL
LIFT DETAILS12-18 PERSONS APPROX. EACH LIFT CAPACITY
EXTERNAL GLAZINGSUPVC FRAME / ALUMINIUM FRAME WITH GLASS
WINDOWS/GLAZINGSUPVC FRAME / ALUMINIUM FRAME WITH GLASS
DOORSINTERNAL POLISHED VENEER/ PANELLED/ FLUSH SHUTTER
MAIN DOORSWOODEN PANELLED DOOR/POLISHED VENEER
INTERNAL DOORSINTERNAL POLISHED VENEER/ PANELLED/ FLUSH SHUTTER
AIR CONDITIONINGVRV / SPLIT AC SYSTEM
ELECTRICAL FITTINGSMODULAR SWITCHES
CNG PIPE LINEPROVISION ONLY
PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
EXTERNAL FINISHING/COLOUR SCHEMEHIGH GRADE EXTERNAL PAINT AND STONE
INTERNAL FINISHINGCOMBINATION OF ACRYLIC EMULSION PAINT , POP PUNNING

Unit-wise Specifications

TOILET
FLOORNATURAL STONE /TILES
WALLSCOMBINATION OF TILES AND ACRYLIC EMULSION PAINT
CEILINGFALSE CEILING PAINTED IN ACRYLIC EMULSION PAINT
COUNTERSSTONE TOP
SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTING, HEALTH FAUCET, WASH BASINS & WALL HUNG WC
FIXTURESVANITIES WITH MIRROR, EXHAUST FAN , TOWER RAIL, TOWEL RING, TOILET PAPER HOLDER, ROBE HOOK
KITCHEN
FLOORVITRIFIED TILES
WALLSCOMBINATION OF TILES AND ACRYLIC EMULSION PAINT
CEILINGACRYLIC EMULSION PAINT
COUNTERSGRANITE COUNTER
FIXTURESCP FITTING & DOUBLE BOWL SS SINK WITH DRAIN BOARD
KITCHEN APPLIANCESMODULAR KITCHEN CABINETRY, HOB & CHIMNEY
SIT-OUTS
FLOORANTISKID TIMES
WALLS & CEILINGPLASTER WITH ACRYLIC EMULSION
RAILINGSCOMBINATION OF SS, GLASS &MS
FIXTURESLED LIGHTS
BED ROOMS
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION PAINT ON POP PUNNING
CEILINGACRYLIC EMULSION PAINT
WARDROBESN/A
MASTER TOILET
FLOORCOMBINATION OF NATURAL STONE /TILES
WALLSCOMBINATION OF NATURAL STONE /TILES AND ACRYLIC EMULSION PAINT
CEILINGFALSE CEILING PAINTED IN ACRYLIC EMULSION PAINT
COUNTERSSTONE TOP
SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTING, HEALTH FAUCET, WASH BASINS & WALL HUNG WC
FITTING/FIXTURESVANITIES WITH MIRROR, EXHAUST FAN , TOWER RAIL, TOWEL RING, TOILET PAPER HOLDER, ROBE HOOK
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION PAINT ON POP PUNNING
CEILINGACRYLIC EMULSION PAINT
MODULAR WARDROBESPROVISION
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNATURAL STONE
WALLSACRYLIC EMULSION PAINT ON POP PUNNING
CEILINGACRYLIC EMULSION PAINT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES/ANTISKID TILES
WALLS & CEILINGACRYLIC EMULSION PAINT
TOILETTOILET WITH BASIC CP FITTINGS, WASH BASIN AND SPOUT
BALCONYUTILITY BALCONY TO HAVE THE PROVISION OF ELECTRICAL AND WATER CONNECTIVITY

Fee Details

Payment 1
amount:921000
cheque no:53769
draft date:14-01-2020
payable to:HRERA Gurugram
payee bank:OBC BANK
Payment 2
amount:905000
cheque no:455681
draft date:01-09-2020
payable to:HRERA Gurugram
payee bank:OBC BANK
Payment 3
amount:2423000
cheque no:455682
draft date:01-09-2020
payable to:HRERA Gurugram
payee bank:OBC BANK
Payment 4
amount:711000
cheque no:53770
draft date:14-01-2020
payable to:HRERA Gurugram
payee bank:OBC BANK