Launch Date
Completion Date
RERA ID
28.644099
77.383324
Khasra no.527/1 & 519 & Plot area 12698.27 Sq.Mt.
Boundary walls on all sides with gate for entry and exit.
Cement Concrete Internal Road (CC Road Above the 2 Coarse of WBM)
Foothpaths in Interlocking Pavers/Tiles
To be Provided by Ghaziabad Development Authority and Storage will be done in underground water tank
Main Sewer line has been designed as per norms and running in basement ceiling and connected to STP
Underground pipe drain with chamber.
Parks & Landscape will be designed as per authority guidelines.
Tree Planting will be designed as per authority guidelines.
Design has been done as per UP electricity board guidelines.
Club has been designed as per authority norms and Facilities like Party Hall,Gaming Zone, Gym etc will be provided
STP 85 KLD has been installed.
Door to Door Collection and disposal up to garbage point of authority.
Recycling of treated water and rain water harvesting system will be provided
Solar panel will be provided as per norms at suitable place
System will be provided & functional as per fire department guidelines
Provision of Child care services and weekly doctor visits for health check up for all the construction workers
Emergency Lighting and periodic training for emergency evacuation will be provided by the security agency
NA
Showing 12 blocks with 354 units
Total Carpet Area
33543.63 m²
361060.28 ft²
Total Units
418
3 different types
Blocks & Floors
12
22 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12698.27 m²
136682.91 ft²
Processing Time
1043 days
From application to approval
19-11-2021
27-09-2024