NewActive

GREEN ESTATE

Prayagraj, Uttar Pradesh
01-07-2025
Launch Date
New
Type
29-06-2027
Completion Date

Overview

Launch Date

01-07-2025

Completion Date

29-06-2027

RERA ID

UPRERAPRJ164505/12/2025

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)16766
Project NameGREEN ESTATE
Registration Fee (in Rs.)89000
AddressARAZI NO 84 PART, 85 PART, 86, 87, 89 MI
Village/Locality/Sector etc.BHAGIPUR, JHUNSI
StateUttar Pradesh
Project Duration (In month)24
DistrictPrayagraj
Original Start Date-
TehsilPhulpur
Proposed Start Date01-07-2025
Sanctioning Competent AuthorityPrayagraj(Allahabad) Development Authority
Project Cost (in Lacs)605
Proposed Completion Date29-06-2027

Location

Latitude

25.428253

Longitude

81.978965

Bank Details

Account Details
Name of the AccountGolden Sahkari Awas Samiti- Collection A/c for Green Estate
Account Number8153738477
Bank NameIndian Bank
Branch NameHindi Sahitya Sammelan Branch
Branch AddressHindi Sahitya Sammelan Marg 12, K.P. Kakkar Road, Prayagraj-211019
IFSC CodeIDIB000A580
Branch DistrictPrayagraj
Branch StateSelect
Branch Email AddressA580@indianbank.co.in
Separate Account Details
Name of the AccountGolden Sahkari Awas Samiti- Separate A/c for Green Estate
Account Number8153759861
Bank NameIndian Bank
Branch NameHindi Sahitya Sammelan Branch
Branch AddressHindi Sahitya Sammelan marg 12, KP Kakkar Road, Prayagraj
Branch StateUttar Pradesh
Branch DistrictPrayagraj
IFSC CodeIDIB000A580
Transaction Account Details
Name of the AccountGolden Sahkari Awas Samiti- Transaction A/c for Green Estate
Account Number8153762614
Bank NameIndian Bank
Branch NameHindi Sahitya Sammelan branch
Branch AddressHindi Sahitya Sammelan Marg, 12, KP Kakkar Road, Prayagraj-211019
Branch StateUttar Pradesh
Branch DistrictPrayagraj
IFSC CodeIDIB000A580

Development Works

Demarcation of Plots

AS PER APPROVED MAP A TOTAL 74 PLOTS ARE BEING DEVELOPED OF VARIOUS SIZES. DEMARCATION OF PLOT WILL BE DONE WITH RCC PILLARS ON FOUR CORNERS OF 3 FT HEIGHT.

Boundary Wall

PROJECT BOUNDED BY COMPOUND WALL. THE SAID BOUNDRY WALL IS CONSTRUCTED WITH 9 INCH THICK BRICK WORK AND 6 FT IN HEIGHT. THE CONSTRUCTION IS DONE BY FLY ASH AND RED BRICK USING CEMENT MORTAR IN 1-6 RATIO.

Road Work

THE INTERNAL ROAD 4734.56 SQ MTR WILL BE DEVELOPED WITHIN THE PROJECT WITH 9 MTR WIDTH. ROAD CONSTRUCTION IS CARRIED OUT WITH BASIC EARTH WORK FOLLOWED BY WBM . GSB AND STONE DUST AND GANGA SAND FOLLOWED WITH EXTENSIVE COMPACTION AND THEREAFTER FINISHED WITH RCC WORK

Footpaths

THE FOOTPATH (3FT WIDE) HAVE BEEN DESIGNED TO CARRY SEWER (6INCH HUME PIPE )WATER LINE (6 INCH PVC PIPE) DRAIN PIPE. ALL THESE SERVICES ARE UNDERGROUND. THE FOOTPATH CONSTRUCTED USING PAVER BLOCKS WITH KERB STONE (12INCH WIDE)

Water Supply Including Drinking Water Facilities

WATER IS BEING SUPPLED THROUG BOREWELL WITH 6INCH BORING AND 5 HP PUMP

Sewer System

A NEWORK UNDERGORUND 6 INCH HUME PIPE WILL BE LAID TO CARRY SEWAGE FROM HOUSEHOLD TO STP PLACED WITHIN THE PROJECT.

Drain

WASTE WATER FROM HOUSEHOLD THROUGH 6INCH PVC PIPE WHICH IS LAID UNDERGROUND DEPENDING UPON THE CLASSIFICATION OF WASTE WATER

Parks

THE TOTAL PARK AREA TO BE DEVELOPED AS PER HORTICULTURE PLAN. THE PARK WILL BE BOUNDE BY MS GRILL AND LIGHTING ARRANGEMENT AND PARK BENCHES WILL BE INSTALLED REGULAR INTERVALS.

Tree Planting

MORE THAN 100 TREE WILL BE IMPLANTED IN THE PROJECT. FLOWERING PLANTS AND EVERGEEN PLANT WILL BE PLANTED IN OPERN AREAS AND OTHER INSTALLATION

Design For Electric Supply Including Street Lighting

CABLE WILL BE USED TO SUPPLY LT POWER . WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL AUTHORITY BOARD AND WILL BE CONSIDER CENTRALIZED TRANSFORMER.

Community Buildings

CONSIDERING SIZE OF PROJECT NO SUCH COMMUNITY BUILDING IS PLANNED

Treatment and Disposal System of Sewage and Sullage water

THE SEWAGE AND SULLAGE WATER WILL BE CARRIED FROM HOUSEHOLD THROUGH UNDERGROUND SERVICE PIPE TO STP.

Solid Waste Management And Disposal System

STP PLANNED FOR THE PROJECT WORK BREAK DOWN SOLID WASTE AND FILTERED WATER IS RECEIVED FROM THE INCOMING GREY WATER

Water Conservation System

WE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURE AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM TO REDUCE THE WATER CONSUMPTION AND IMPROVE THE GROUND WATER LEVEL.

Energy Management System Including Use of Renewable Energy

THE ELECTRICAL PLAN OF THE PROJECT HAS BEEN DEVELOPED AS PER THE NORMS OF THE UP ELECTRICITY BOARD AND PuVVNL.

Fire Protection And Fire Safety System

BEING A PLOTTED DEVELOPMENT PROJECT THE REQUIREMENT FOR FIRE PROTECTION IS LIMITED, HOWEVER 08 NUMBER OF FIRE HYDRANT AND SAND BUCKETS HAVE BEEN PLACED IN VARIOUS COMMON AREA

Social Infrastructure And Other Public Amenities Including Public Health Services

NOT APPLICABLE IN THIS PROJECT.

Emergency Evacuation Services

WE WILL HAVE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS AND EMERGENCY EXIT GATES

Other Miscellaneous Work

DEVELOPMENT NORMS AND RULES AND COMMITEMENT MADE IN THE DEVELOPMENT PLANS WILL BE ADHERE TO

Documents

Registry Document

No: 1-5075/201-234/9812 | Date: 12-12-2014

Registry Document

No: 1/4225/153-180/1014 | Date: 19-02-2013

Registry Document

No: 1/4304/93-116/2521 | Date: 26-04-2013

Registry Document

No: 1/4462/137-178/5606 | Date: 06-09-2013

Registry Document

No: 1/4344/99-126/3340 | Date: 26-04-2013

Registry Document

No: 1/4209/257-278/705 | Date: 05-02-2013

Registry Document

No: 1/4594/37-70/8412 | Date: 24-12-2013

Registry Document

No: 1/5177/115-150/1575 | Date: 19-05-2015

Extract of Khatauni

No: 1428-1433 (01 July, 2020 to 30 June, 2026) | Date: -

Extract of Khatauni

No: 1428-1433 (01 July,2020 to 30 June, 2026) | Date: -

Extract of Khatauni

No: 1428-1433 (01 July,2020 to 30 June, 2026) | Date: -

Extract of Khatauni

No: 1428-1433 (01 July, 2020 to 30 June, 2026) | Date: -

Extract of Khatauni

No: 1428-1433 (01 July, 2020 to 30 June, 2026) | Date: -

Extract of Khatauni

No: 1427-1432 (01 July, 2019 to 30 June, 2025) | Date: -

Extract of Khatauni

No: 1428-1433 (01 July,2020 to 30 June,2026) | Date: -

Extract of Khatauni

No: 1427-1432 (01July,2019 to 30 June,2025) | Date: -

Registry Document

No: WahiNo.04/ZildNo.119/PageNo.303-322/183 | Date: 05-12-2025

Registry Document

No: 1/4352/1-28/3490 | Date: 06-06-2013

Registry Document

No: 1/4312/63-86/2670 | Date: 01-05-2013

Proforma of Completion Certificate(Occupancy)

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 25-08-2025

Commencement Certificate

Uploaded: 07-08-2025

Other Plan(If Any)

Uploaded: 05-09-2025

Proforma of Application Form

Uploaded: 25-08-2025

Proforma of Allotment Letter

Uploaded: 25-08-2025

Proforma of Conveyance Deed

Uploaded: 25-08-2025

Waste Disposal Plan

Uploaded: 25-08-2025

Water Supply Plan

Uploaded: 25-08-2025

Electricity Supply Plan

Uploaded: 25-08-2025

Development Work Plan

Uploaded: 25-08-2025

Affidavit

Uploaded: 05-09-2025

CA CERTIFICATE

Uploaded: 10-11-2025

ARCHITECT CERTIFICATE

Uploaded: 10-11-2025

ENGINEERS CERTIFICATE

Uploaded: 10-11-2025

Other

Uploaded: 09-12-2025

Proforma of Agreement for Sale

Uploaded: 25-08-2025

Permits

Orignal Permit NoPatrank-105/Pra.A.-Bhawan/Zone-5/Prasta./L.O.P./2013-14 Dated 30/06/2022
Orignal Permit Date30-06-2022
Valid Upto29-06-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto29-06-2027
End Date29-06-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)GOLDEN SAHKARI AWAS SAMITI LTD
Contractor AddressCHAK HARI HAR VAN, LEELAPUR ROAD, JHUNSI, PRAYAGRAJ-211019
Architect NameER. MITHLESH KUMAR
Architect Address70A/4/32, STANLEY ROAD (NEAR MUIRABAD CROSSING), PRAYAGRAJ- 211002
Architect Licence NumberM/1493749/20062018
Structural Engineer NameER. MITHLESH KUMAR
Structural Engineer Address70A/4/32, STANLEY ROAD (NEAR MUIRABAD CROSSING), PRAYAGRAJ-211002
Mobile number(Project Co-ordinator)9415668306

Land Details

Plot

Showing 1 blocks with 4 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

4 units

Khasra Details

Total Area

16765.55

180462.70 ft²

9 plots
Khasra
TypeKhasra
Khasra/Plot No86
Area(In Sq. Mt.)2230
Khasra
TypeKhasra
Khasra/Plot No269
Area(In Sq. Mt.)1140
Khasra
TypeKhasra
Khasra/Plot No269Part
Area(In Sq. Mt.)2280
Khasra
TypeKhasra
Khasra/Plot No84 Part
Area(In Sq. Mt.)2472.21
Khasra
TypeKhasra
Khasra/Plot No85Part
Area(In Sq. Mt.)2186.67
Khasra
TypeKhasra
Khasra/Plot No87
Area(In Sq. Mt.)630
Khasra
TypeKhasra
Khasra/Plot No85
Area(In Sq. Mt.)2186.67
Khasra
TypeKhasra
Khasra/Plot No89mi
Area(In Sq. Mt.)1140
Khasra
TypeKhasra
Khasra/Plot No286A
Area(In Sq. Mt.)2500

Other Details

Contractor Name (if any)GOLDEN SAHKARI AWAS SAMITI LTD
Contractor AddressCHAK HARI HAR VAN, LEELAPUR ROAD, JHUNSI, PRAYAGRAJ-211019
Architect NameER. MITHLESH KUMAR
Architect Address70A/4/32, STANLEY ROAD (NEAR MUIRABAD CROSSING), PRAYAGRAJ- 211002
Architect Licence NumberM/1493749/20062018
Structural Engineer NameER. MITHLESH KUMAR
Structural Engineer Address70A/4/32, STANLEY ROAD (NEAR MUIRABAD CROSSING), PRAYAGRAJ-211002
Mobile number(Project Co-ordinator)9415668306