28.586996
77.444361
Total Units
168
3 unit types
Carpet Area
1,97,061 ft²
18,307.60 m² · carpet only, excludes balcony
Blocks & Floors
1
8 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 1,173 ft² (108.97 m²)Balconies 11Parking per unit 0.006 of 80 rows list no units (6 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 80 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| IT BLOCK 3 | BSMNT2 | OTHER | — | — | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 1,611 ft²149.68 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 1,766 ft²164.10 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 2,236 ft²207.69 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 4,064 ft²377.56 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 1,077 ft²100.05 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 1,242 ft²115.36 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 1,159 ft²107.63 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 1,387 ft²128.90 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 1,659 ft²154.09 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 1,857 ft²172.49 m² | — | — |
| IT BLOCK 3 | BSMNT | OTHER | 1 | 6,116 ft²568.22 m² | — | — |
| IT BLOCK 3 | BSMNT | SHOP | 1 | 2,490 ft²231.36 m² | — | — |
| IT BLOCK 3 | BSMNT3 | OTHER | — | — | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 574 ft²53.30 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 315 ft²29.28 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 432 ft²40.12 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 412 ft²38.30 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 1,635 ft²151.91 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 524 ft²48.71 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 659 ft²61.21 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 603 ft²56.05 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 648 ft²60.17 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 657 ft²61.04 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 1,635 ft²151.92 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 1,308 ft²121.50 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 1,211 ft²112.50 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 763 ft²70.90 m² | — | — |
| IT BLOCK 3 | GF | OTHER | 1 | 1,807 ft²167.90 m² | — | — |
| IT BLOCK 3 | 5 | OTHER | 1 | 2,318 ft²215.32 m² | — | — |
| IT BLOCK 3 | 5 | OTHER | 1 | 1,851 ft²172.01 m² | — | — |
| IT BLOCK 3 | 5 | OTHER | 1 | 1,811 ft²168.25 m² | — | — |
| IT BLOCK 3 | 5 | OTHER | 1 | 5,408 ft²502.43 m² | — | — |
| IT BLOCK 3 | 5 | OTHER | 2 | 3,188 ft²296.21 m² | — | — |
| IT BLOCK 3 | 5 | OTHER | 1 | 3,228 ft²299.90 m² | — | — |
| IT BLOCK 3 | 5 | STUDIO | 1 | 468 ft²43.43 m² | 1 | 45 ft²4.20 m² |
| IT BLOCK 3 | 5 | STUDIO | 16 | 392 ft²36.45 m² | 1 | 45 ft²4.20 m² |
| IT BLOCK 3 | 6 | OTHER | 1 | 2,318 ft²215.32 m² | — | — |
| IT BLOCK 3 | 6 | OTHER | 1 | 1,851 ft²172.01 m² | — | — |
| IT BLOCK 3 | 6 | OTHER | 1 | 1,811 ft²168.25 m² | — | — |
| IT BLOCK 3 | 6 | OTHER | 1 | 5,408 ft²502.43 m² | — | — |
| IT BLOCK 3 | 6 | OTHER | 2 | 3,188 ft²296.21 m² | — | — |
| IT BLOCK 3 | 6 | OTHER | 1 | 3,228 ft²299.90 m² | — | — |
| IT BLOCK 3 | 6 | STUDIO | 1 | 468 ft²43.43 m² | 1 | 45 ft²4.20 m² |
| IT BLOCK 3 | 6 | STUDIO | 16 | 392 ft²36.45 m² | 1 | 45 ft²4.20 m² |
| IT BLOCK 3 | 7 | OTHER | 1 | 2,318 ft²215.32 m² | — | — |
| IT BLOCK 3 | 7 | OTHER | 1 | 1,851 ft²172.01 m² | — | — |
| IT BLOCK 3 | 7 | OTHER | 1 | 1,811 ft²168.25 m² | — | — |
| IT BLOCK 3 | 7 | OTHER | 1 | 5,408 ft²502.43 m² | — | — |
| IT BLOCK 3 | 7 | OTHER | 1 | 3,188 ft²296.21 m² | — | — |
Total Plot Area
22.56 acres
91,308.00 m² · plot area
The project land will be demarcated by its boundary wall to the exact shape, size and orientation as per sanctioned map by Noida Development Authority.
Lenth 247.14Mtr. and 1.80 Mtr. High boundary wall of RCC Frame , brick and plaster will be constructed with deep foundations The wall will be plaster and painted/ stone cladding as per aesthetics.
6.0 M wide road and 227.42m length of the roadas per approved plan by Greater Noida Authority, The road shall be constructed in M-20 grade RCC will be laid in thickness of +150mm on top of compacted PCC and compacted base metal and using colored pavers as per design for aesthetic look.
170 M long footpath M-30 Grade paver blocks/ interlocking pavers will be laid in the walking areas. The pavers shall be 3"-4" thickness and shall be laid on compacted sand bed. The paver block/ interlocking pavers shall be used in colored patters.
Portable water supply through the concerned Government Authority will be delivered to the water tank. Further piping of Sch 80 and CPVC is being used.
The sewage shall be collected through a soil pipe arrangement , u bends and inspection chambers leading to the STP of the project.
The roof top water shall be brought to the ground floor level with the 150mm-200mm rain UPVC water down take pipes which along with the surface run off water shall be transported to the rain water harvesting pits through under ground 300mm-450mm RCC huge pipes.
Not applicable.
The tree will be planted at all suitable location of the project amd along the boundary wall as per the development plan.
4 NOC of Transformer with 2500KVA capacity of each Electrical layout and capacity will be installed to suffice the commercial use of the project as per load sanction will be taken from the NPCL approval.
Not applicable.
Centralized MBBR STP WITH 770 KLD Capacity to treat the sewage System of Building
Centralized MBBR STP WITH 770 KLD Capacity Project shall be have waste segregation area and OWC for treatment at Basement 2.
Rain water harvesting with dual flush system shall be provided.
Solar panel LED light and VFD panels shall be used foer efficient energy management.
Number of hydrants, Fire exits, Fire alarm system and water curtain, sprinkler automatic system as per NBC and Fire scheme approver layout.
Not Applicable.
As per approved building plan Provided Evacuation Point, signage, Route plan and public awareness system.
As per approved building plan.
Grandthum Phase -Iii is located in Gautam Buddha Nagar.
Yes. Grandthum Phase -Iii is registered under UPRERAPRJ213153/02/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Grandthum Phase -Iii is 4 December 2029.
Grandthum Phase -Iii is developed by Group 108.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.
Developed by
7 Projects
EXECUTIVE SUMMARY OF GROUP 108 Group 108 is a privately held commercial real estate developer based in Noida, NCR. Formally launched as a brand in 2023, it emerged as a spin-off from the legacy Bhutani Group, a Noida-bas…
Know More about Group 108