NEWActive

GODREJ VRIKSHYA

GURUGRAM, KADIPUR ST
image
image
image
image
20-05-2024
Launch Date
NEW
Type
2031-06-30
Completion Date

Overview

Launch Date

20-05-2024

Completion Date

2031-06-30

Configurations

4 BHK, 3 BHK

Sizes

0 - 0 sq.ft.

Project Size

6 Buildings - 615 units

Total Floors

27

Launch Price

17500 /sq.ft

Current Price

19000 /sq.ft

RERA ID

RERA-GRG-1650-2024

Basic Details

Project NameGODREJ VRIKSHYA
Project IDRERA-GRG-1650-2024
Project TypeNEW
Applicant TypeFirm
Submission Date20-05-2024 02:44:08 PM
Builder NameGODREJ VESTAMARK LLP
CINNot specified
PANAARFG0046P
Emailgodrej103.ggn@godrejproperties.com
WebsiteNot specified
Phone (Mobile)8800207105
Phone (Landline)01244842300
Registered Address3RD FLOOR, PLOT NO 35, UM HOUSE TOWER A, SECTOR 44
Project AddressSECTOR 103
DistrictGURUGRAM
TehsilKADIPUR ST

Location

Layout

Loading
mlp
mlp

Payment Plans

Loading
PP
PP

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
1442 sq.ft
Built Up Area
N/A
Carpet Efficiency
N/A
Built Up Efficiency
N/A
Parkings
2

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameICICI BANK LTD. SHOP NO. 1,2 AND 3 DLF CROSS POINT, OPP GALLERIA MARKET DLF PHASE IV GURGAON HARYANA
Account Number165305000737
IFSC CodeICIC0001653
MICR Code110229202
Branch Code1653

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Sushil Kumar S/O: Kali Dass, Bah (391), Mandi, Himachal Pradesh, 175049
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area14.86225 (Acre)
Proposed FAR1.859428
Permissible FAR1.87
Total Licensed Land14.86225 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS6480.40
CONSTRUCTION OF ROADS6296.06
PAVEMENTS5290.49
PARKS AND PLAYGROUNDS2633.12
GREEN BELTS2134.32
VEHICLE PARKINGS5314.48
ELECTRICITY SUB-STATION830.01
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY1445.13
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES334.45
ANY OTHER20651.39
CLUB7625.40
COMMERCIAL300.68
NURSERY809.37
Total60145.3

Cost Details

Land Cost39437.31 Lakhs
Other Cost18848.94 Lakhs
Estimated Project Cost150891.85 Lakhs
Estimated Infrastructure Cost34019.76 Lakhs
Estimated Apartment Construction Cost58585.84 Lakhs

Documents

ZONING PLAN

Uploaded on: 15-05-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 15-05-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 17-05-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 17-05-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 17-05-2024

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 20-05-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 17-05-2024

D243_TOWER E & F - ELEVATION B

Uploaded on: 24-07-2024

C7_TOWER A & B - ELEVATION A & B

Uploaded on: 24-07-2024

TOWER C & D - TERRACE PLAN

Uploaded on: 24-07-2024

NON-ENCUMBRANCE CERTIFICATE

Uploaded on: 24-07-2024

LOI

Uploaded on: 24-07-2024

D245_CONVENIENT SHOPPING- PLAN, ELEVATIONS & SECTIONS

Uploaded on: 24-07-2024

D249_NURSERY SCHOOL- ELEVATION & SECTIONS

Uploaded on: 24-07-2024

TOWER A & B - GROUND COVERAGE & FAR AREAS

Uploaded on: 24-07-2024

D247_MLCP- ELEVATION A & B

Uploaded on: 24-07-2024

CONVENIENT SHOPPING- PLAN ELEVATIONS AND SECTIONS

Uploaded on: 24-07-2024

TOWER C & D - ROOF PLAN

Uploaded on: 24-07-2024

D248_MLCP- ELEVATION C & D

Uploaded on: 24-07-2024

TOWER A & B - FIRST FLOOR PLAN

Uploaded on: 24-07-2024

TOWER E & F - THIRD FLOOR PLAN

Uploaded on: 24-07-2024

D240_TOWER C & D - ELEVATION A & B

Uploaded on: 24-07-2024

TOWER A & B, GROUND FLOOR PLAN

Uploaded on: 24-07-2024

TOWER A & B -TYPICAL FLOOR PLAN

Uploaded on: 24-07-2024

TOWER E & F -SECOND FLOOR PLAN

Uploaded on: 24-07-2024

ZONNING PLAN

Uploaded on: 09-08-2024

COPY OF LICENSE ALONG WITH SCHEDULE

Uploaded on: 09-08-2024

D268_STRUCTURE DRAWINGS_MLCP & CLUB_PART1

Uploaded on: 24-07-2024

C10_MLCP- GROUND AND FIRST FLOOR PLAN

Uploaded on: 24-07-2024

LICENSE WITH RENEWAL COPIES

Uploaded on: 24-07-2024

COMMUNITY BUILDING- SIXTH FLOOR

Uploaded on: 24-07-2024

CA CERTIFICATE FOR COST INCURRED UP TO THE DATE

Uploaded on: 24-07-2024

TOWER A & B - ROOF PLAN

Uploaded on: 24-07-2024

TOWER A & B - THIRD FLOOR PLAN

Uploaded on: 24-07-2024

TOWER C & D - GROUND FLOOR PLAN

Uploaded on: 24-07-2024

TOWER E & F - GROUND COVERAGE & AREAS

Uploaded on: 24-07-2024

TOWER E & F - ROOF PLAN

Uploaded on: 24-07-2024

D248_MLCP- ELEVATION C & D

Uploaded on: 24-07-2024

TOWER C & D - REFUGE FLOOR PLAN

Uploaded on: 24-07-2024

D241_TOWER C & D -ELEVATION C

Uploaded on: 24-07-2024

NURSERY SCHOOL- FLOOR PLAN & AREAS

Uploaded on: 24-07-2024

AAI NOC

Uploaded on: 24-07-2024

BUILDING PLAN APPROVAL

Uploaded on: 24-07-2024

ZONING PLAN

Uploaded on: 24-07-2024

FOREST NOC

Uploaded on: 24-07-2024

COMMUNITY BUILDING- ROOF PLAN

Uploaded on: 24-07-2024

COMMUNITY BUILDING-SEVENTH FLOOR

Uploaded on: 24-07-2024

EWS- FLOOR PLAN AND AREAS CALCULATION 1

Uploaded on: 24-07-2024

EWS- FLOOR PLAN AND AREAS CALCULATION

Uploaded on: 24-07-2024

TOWER A & B - REFUGE FLOOR PLAN

Uploaded on: 24-07-2024

TOWER A & B - TERRACE PLAN

Uploaded on: 24-07-2024

TOWER A & B -SECOND FLOOR PLAN

Uploaded on: 24-07-2024

TOWER C & D - FIRST FLOOR PLAN

Uploaded on: 24-07-2024

TOWER C & D - GROUND COVERED & FAR AREAS

Uploaded on: 24-07-2024

TOWER C & D -SECOND FLOOR PLAN

Uploaded on: 24-07-2024

TOWER E & F - REFUGE FLOOR PLAN

Uploaded on: 24-07-2024

D249_NURSERY SCHOOL- ELEVATION & SECTIONS

Uploaded on: 24-07-2024

TOWER C & D -TYPICAL FLOOR PLAN

Uploaded on: 24-07-2024

TOWER E & F - GROUND FLOOR PLAN

Uploaded on: 24-07-2024

TOWER E & F - TERRACE PLAN

Uploaded on: 24-07-2024

D239_TOWER A & B - ELEVATION C

Uploaded on: 24-07-2024

D242_TOWER E & F - ELEVATION A

Uploaded on: 24-07-2024

D244_TOWER E & F - ELEVATION C & D

Uploaded on: 24-07-2024

D246_EWS SECTIONS & ELEVATIONS

Uploaded on: 24-07-2024

D260_MLCP- SECOND AND THIRD FLOOR

Uploaded on: 24-07-2024

D261_MLCP- FOURTH AND FIFTH FLOOR

Uploaded on: 24-07-2024

COPY OF LICENSE ALONG WITH SCHEDULE

Uploaded on: 09-08-2024

COPY OF LICENSE ALONG WITH SCHEDULE

Uploaded on: 09-08-2024

COPY OF LICENSE ALONG WITH SCHEDULE

Uploaded on: 09-08-2024

ZONNING PLAN

Uploaded on: 09-08-2024

ZONNING PLAN

Uploaded on: 09-08-2024

ZONNING PLAN

Uploaded on: 09-08-2024

Statutory Approvals

LOI (14.806 ACRES)Date: 20-10-2010Status: ALREADY BEEN OBTAINED
LICENCE NO. 105 OF 2010 (14.806 ACRES)Date: 03-12-2010Status: ALREADY BEEN OBTAINED
LOI (0.05625 ACRES)Date: 16-11-2023Status: ALREADY BEEN OBTAINED
LICENCE NO. 29 OF 2024 (0.05625 ACRES)Date: 21-02-2024Status: ALREADY BEEN OBTAINED
NOC FOR HEIGHT CLEARANCEDate: 24-04-2024Status: ALREADY BEEN OBTAINED
ASSURANCE OF WATER SUPPLYDate: 21-03-2024Status: ALREADY BEEN OBTAINED
ASSURANCE OF ELECTRICAL LOADDate: 22-03-2024Status: ALREADY BEEN OBTAINED
ASSURANCE OF SEWERAGE CONNECTIONDate: 07-05-2024Status: ALREADY BEEN OBTAINED
ASSURANCE OF STORM CONNECTIONDate: 20-03-2024Status: ALREADY BEEN OBTAINED
ASSURANCE OF TREATED WATER FOR CONSTRUCTION PURPOSEDate: 20-03-2024Status: ALREADY BEEN OBTAINED
FOREST NOC APPROVAL (14.806 ACRES)Date: 29-03-2012Status: ALREADY BEEN OBTAINED
FOREST NOC APPROVAL (0.05625 ACRES)Date: 27-12-2023Status: ALREADY BEEN OBTAINED
ARAVALI NOC (14.806 ACRES)Date: 07-12-2012Status: ALREADY BEEN OBTAINED
ARAVALI NOC (0.05625 ACRES)Date: 22-04-2024Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 22-02-2024Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: No
Demarcation PlanApproved: No
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
SOFTSCAPEYET TO BE PREPARED
HARDSCAPEYET TO BE PREPARED
ELECTRICAL SUBSTATIONYET TO BE PREPARED
SIGNAGESYET TO BE PREPARED
LANDSCAPEYET TO BE PREPARED
HIGHSIDEYET TO BE PREPARED

NOC

ROADSProvider: GDMAApproval Status: Pending
WATER SUPPLYProvider: GMDAApproval Status: Pending
ELECTRICITYProvider: DHVBNApproval Status: Pending
SEWAGE DISPOSALProvider: GMDAApproval Status: Pending
STORM WATER DRAINAGEProvider: GMDAApproval Status: Pending

Project Team

Authorized Representative

ABHIJEET SINDHU
Name
ABHIJEET SINDHU
PAN
XXXX452G
Email
godrej103.ggn@godrejproperties.com
Mobile
8800207105
Landline
01244842300
Address
H. No. 1527 Sector 13P Hisar Haryana - 125001

Contact Details

Project ContactEmail: godrej103.ggn@godrejproperties.comMobile: 1244842300Landline: 1244842300
Project Contact PersonName: ABHIJEET SINDHUEmail: godrej103.ggn@godrejproperties.comMobile: 1244842300Landline: 1244842300

Land Details

Land Area14.86225 (Acre)
Proposed FAR1.859428
Permissible FAR1.87
Total Licensed Land14.86225 (Acre)

Land Usage

Land Cost39437.31 Lakhs
Other Cost18848.94 Lakhs
Estimated Project Cost150891.85 Lakhs
Estimated Infrastructure Cost34019.76 Lakhs
Estimated Apartment Construction Cost58585.84 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
School0
Highside0
Signages0
Hardscape0
Landscape0
Softscape0
Shopping area0
Street Lighting0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electrical sub station0
Electricity Supply System0
Security and fire fighting0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station----
Electricity Supply System0000
Hardscape----
Highside----
Landscape----
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
School----
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Signages----
Softscape----
Storm Water Drainage0000
Street Lighting----
Water Supply System0000
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres000401.57
Electrical sub station----
Electricity Supply System0000
Hardscape----
Highside----
Landscape----
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
School----
Security and fire fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Signages----
Softscape----
Storm Water Drainage0000
Street Lighting----
Water Supply System0000
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres392.84397.2401.57401.57
Electrical sub station----
Electricity Supply System0000
Hardscape----
Highside----
Landscape----
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
School----
Security and fire fighting----
Sewerage treatment & garbage disposal04.234.232.82
Shopping area0000
Signages----
Softscape----
Storm Water Drainage07.867.865.24
Street Lighting----
Water Supply System025.0925.0916.73
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres392.84397.2401.57749.59
Electrical sub station-006.66
Electricity Supply System0112.6187.67375.34
Hardscape----
Highside-4.1816.7133.42
Landscape----
Other38.82194.1194.1310.56
Parks and Playgrounds0000
Roads & Pavements042.0270.03140.05
School----
Security and fire fighting----
Sewerage treatment & garbage disposal5.657.067.0611.29
Shopping area0000
Signages----
Softscape----
Storm Water Drainage10.4913.1113.1120.97
Street Lighting----
Water Supply System33.4641.8241.8266.92
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres1276.931276.931290.971290.97
Electrical sub station16.6526.6326.6333.29
Electricity Supply System112.6262.74300.27300.27
Hardscape031.5152.5252.52
Highside12.5341.7741.7733.42
Landscape00131.51131.51
Other310.56465.84465.84388.2
Parks and Playgrounds0000
Roads & Pavements42.0270.03112.04112.04
School0015.9648.94
Security and fire fighting0100.96161.54201.93
Sewerage treatment & garbage disposal4.238.4714.1211.29
Shopping area0000
Signages0000
Softscape0000
Storm Water Drainage7.8615.7326.2120.97
Street Lighting04.737.8912.62
Water Supply System25.0950.1983.6566.92
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres1262.91066.45224.81738.66
Electrical sub station9.9926.6333.2939.95
Electricity Supply System225.21225.21225.21262.74
Hardscape31.51157.56126.05126.05
Highside12.5333.4241.7741.77
Landscape78.91394.53394.53394.53
Other388.2310.56194.1155.28
Parks and Playgrounds0000
Roads & Pavements84.0384.0384.0398.04
School47.8848.4148.9448.94
Security and fire fighting60.58161.54302.89302.89
Sewerage treatment & garbage disposal8.478.478.478.47
Shopping area0000
Signages08.7526.2626.26
Softscape00087.53
Storm Water Drainage15.7315.7315.7315.73
Street Lighting4.7315.7723.6623.66
Water Supply System50.1950.1950.1950.19
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres722.6730.63738.66738.66
Electrical sub station33.2933.2926.6319.98
Electricity Supply System262.74300.27300.27187.67
Hardscape105.04105.0484.0384.03
Highside16.7133.4233.4220.89
Landscape263.02263.02210.42263.02
Other116.46116.4677.6477.64
Parks and Playgrounds0000
Roads & Pavements98.04112.04112.0470.03
School42.03000
Security and fire fighting201.93161.54161.54161.54
Sewerage treatment & garbage disposal7.067.065.654.23
Shopping area0000
Signages35.0135.0117.5117.51
Softscape175.07175.07175.07131.3
Storm Water Drainage13.1113.1110.497.86
Street Lighting7.8915.7718.9315.77
Water Supply System41.8241.8233.4625.09
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres489.120--
Electrical sub station00--
Electricity Supply System112.60--
Hardscape94.540--
Highside00--
Landscape105.210--
Other77.640--
Parks and Playgrounds00--
Roads & Pavements70.030--
School00--
Security and fire fighting40.390--
Sewerage treatment & garbage disposal2.820--
Shopping area00--
Signages8.750--
Softscape131.30--
Storm Water Drainage5.240--
Street Lighting6.310--
Water Supply System16.730--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES / CERAMIC TILES
WALL FINISHING DETAILSACRYLIC EMULSION/ OIL BOUND DISTEMPER
KITCHEN DETAILSFLOOR: VITRIFIED TILES WALL: CERAMIC TILES 2'-0" ABOVE COUNTER & OIL BOUND DISTEMPER CEILING: OIL BOUND DISTEMPER
BATHROOM FITTINGSALL PROVIDED WITH STANDARD COMPANY MAKE
WOOD WORK ETCLAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL WITH LAMINATE)
DOORS AND WINDOS FRAMESLAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL WITH LAMINATE)
GLASS WORK4MM & ABOVE AS PER SPECIFICATION
ELECTRIC FITTINGSAS PER BUILDING NORMS
CONDUCTING AND WIRING DETAILSAS PER BUILDING NORMS
CUPBOARD DETAILSNA
WATER STORAGEUNDERGROUND WATER TANK & OVERHEAD WATER TANK
LIFT DETAILS3 IN EACH TOWER- 2 PASSENGER AND 1 SERVICE
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSPOWDER COATED ALUMINUM / UPVC
DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME) (PREHUNG- LVL WITH LAMINATE)
MAIN DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL WITH LAMINATE)
INTERNAL DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH WOODEN FRAME)(PREHUNG- LVL WITH LAMINATE)
AIR CONDITIONINGNA
ELECTRICAL FITTINGSAS PER BUILDING NORMS
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMETBD
INTERNAL FINISHINGPROVIDING AND APPLYING 10 TO 12MM THICK PLASTER TO MASONRY AND RCC WALLS, COLUMNS ETC. IN CEMENT MORTAR 1:5

Unit-wise Specifications

TOILET
FLOORANTI SKID CERAMIC TILE
WALLSACRYLIC EMULSION / OIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSGRANITE
SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY NAME
FIXTURESALL PROVIDED OF STANDARD COMPANY NAME
KITCHEN
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSCERAMIC TILES 2FT ABOVE COUNTER
FIXTURESALL PROVIDED OF STANDARD COMPANY NAME
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORANTI SKID CERAMIC TILE
WALLS & CEILINGACRYLIC EMULSION / OIL BOUND DISTEMPER
RAILINGSMS STEEL
FIXTURESALL PROVIDED OF STANDARD COMPANY NAME
BED ROOMS
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION
CEILINGOIL BOUND DISTEMPER
WARDROBESNA
MASTER TOILET
FLOORANTI SKID CERAMIC TILES
WALLSCERAMIC TILES TILL 7' ON ALL SIDES & OIL BOUND DIST
CEILINGGRID CEILING
COUNTERSGRANITE
SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY NAME
FITTING/FIXTURESALL PROVIDED OF STANDARD COMPANY NAME
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION
CEILINGOIL BOUND DISTEMPER
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSACRYLIC EMULSION/ OIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES
WALLS & CEILINGACRYLIC EMULSION / OIL BOUND DISTEMPER
TOILETANTI SKID TILE
BALCONYVITRIFIED TILES

Fee Details

Payment 1
amount:3235000
cheque no:505411
draft date:18-05-2024
payable to:HRERA Gurugram
payee bank:ICICI
Payment 2
amount:12650000
cheque no:505454
draft date:07-06-2024
payable to:HRERA Gurugram
payee bank:ICICI