Launch Date
Completion Date
RERA ID
28.649664
77.397989
156.28X102.39m demarcation as per UP Awas Vikas Plot no GH-04, for plot of combined phases of the project
boundry wall as per phase boundry shall be provided
interlocking pavers/ trimix
interlocking pavers
making of underground water tanks, connection of water tanks to flats
making of manholes, sewer treatment plants, laying of PVC underground sewer pipes
making of drain for rain water
development of parks, kids playground, making of jogging tracks and water features
planting different types of trees
electric pole, led light, laying underground cable ESS to towers
construction of club house, swimming pools
STP shall be provided and treated water shall be used for flushing, parks, irrigation etc
Manually collected and disposed outside
Rain water harvesting and recycling of treated waste water
making of electric sub station, installation solar panel, DG set
making of water tanks, installation of fire hydrant system and fire fighting equipment
retail shall be provided and club shall be provided
fire stair case shall be provided
N/A
Showing 4 blocks with 174 units
Total Carpet Area
33969.35 m²
365642.69 ft²
Total Units
536
2 different types
Blocks & Floors
4
27 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
16001.51 m²
172238.65 ft²