Launch Date
Completion Date
RERA ID
28.710478
77.432897
Not Applicable
1800 mm high, along entire periphery
Interlocking Pavers and Trimix flooring
Stamp concrete, Stone and Grass pavers
Underground drinking water tank connected with over head water tank of each tower. Water supply to the underground drinking water tank to be done from municipal line. Water supply to be made by local authority
Underground sewerage system as per the sewerage drain.
Surface drains and roof top rain water drain connected to rain water harvesting pits.
As per landscape drawing
As per landscape drawing
Provision of electric sub station, HT, LT rooms transformers as per the electric design
Community Building with gym and indoor sport area shall be provided.
Sewerage shall be treated in STP and treated water recycled for flushing and irrigation.
Door to door manual collection, segregation and disposal of at the municipal dumping ground.
6 nos. sets of recharge pits.
LED light fixtures shall be used for energy conservation.
Provision of the fire alarm, fire fighting equipments and fire control room as per fire norms.
Shall be provided as per the Building Bye laws of GDA
Fire staircase, fire exit passage fire refuge area provided in the tower as per fire norms.
Lawn with children play tot lots.
Showing 3 blocks with 352 units
Total Carpet Area
53856.13 m²
579702.00 ft²
Total Units
1031
6 different types
Blocks & Floors
3
29 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
27039.00 m²
291045.09 ft²