The demarcation of Plot has been duly completed and the project is now ready for commencement of villa construction on the respective land.
Boundry Wall is not applicable under Phase-2 as this phase is part of total Land.
All Internal circulation Roads within the project have been designed with a uniform width of 30 fees. The primary approach roads within the Project are designed with a width of 65 feet, facilitation better traffic flow and accommodating two way vehicular movement.
Continuous footpath are proposed along the main approach roads and selected internal roads to facilitate safe pedestrian circulation within the project premises. Its to be built by Povers Block.
An internal water distribution network is being developed with PVC pipeline; to ensure uniform water pressure and reliable supply across all Villas. Safe and potable drinking water will be ensured through pipe lines. Capacity of 2 Water Tank to be constructed in the project is 44KLD.
Every villa will be provided within an individual sewer connection that links to the main sewer line and an underground sewer pipeline network is being developed in the project.
A well planned storm water drainage system has been incorporated as part of the internal development works to ensure efficient collection and disposal of rainwater within the project area. The drainage network has been designed in accordance with the approval layout plan and applicable local authorities norms.
A dedicated park and landscaped green area has been planned within the project to provide open recreational space, enhance environmental quality and promote healthy community living. The Park layout and amenities have been designed in accordance to the approval plan of Local Authority.
Tree Plantation has been planned and incorporated as an integral part of the internal development work to enhance environmental quality and improve the ecological balance of the project area. Designated Area within the layout have been earmarked for tree plantation along road side, park and open spaces as reflected in the approved plan.
The Project has been planned with a comprehensive and compliant electrical infrastructure to ensure safe, reliable and efficient distribution of Power within the entire development. The Design for electric supply and street lighting has been prepared in accordance with UP electricity Board Guidelines. Transformer capacity is 11KV and generator capacity is 500KVA
Not Applicable
Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess seweage shall be discharged in the municipal sewer. STP of capacity is 250KLD shall be provided.
Manual collection and organic water converter shall be provided in the Project
The Project incorporates a comprehensive water conservation system designed to promote sustainable use of water resources, reduce dependency on external water supply and ensure long term environmental efficiency. The system has been planned in accordance with applicable local authority norms.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Other miscellaneous work if any to be completed as per approved Authority Norms
Total Area
39421.52 m²
424329.30 ft²